1. Purpose, Background and Overview
This report provides the Health and Wellbeing Board with an overview of progress against Hillingdon’s strategic priorities and the major transformation programmes supporting them. It summarises delivery
achievements, emerging performance trends, risks to outcomes, and the key areas where continued Board sponsorship is required. The report is structured in line with the Health and Wellbeing Board style and
focuses on those areas where the Board has a particular interest in both resident outcomes and system-wide impact.
Hillingdon’s strategic priorities — Best Start in Life, Live Well, Age Well, Healthy Places, and Equity & Inclusion — remain aligned to Core20PLUS5, the priorities of the West and North London Integrated Care
Board (W&NL ICB), and the Council’s wider policy framework. As in previous reports, the main emphasis remains on Live Well, Age Well and Equity & Inclusion, reflecting both the scale of current need and the
opportunity to reduce inequalities while easing pressure on urgent and unplanned care.
This update covers progress/outcomes in five principal areas:
I. Year end review, the report highlights some of the year on year changes to show more clearly the system-level outcomes that have been achieved over the past year .
II. Integrated Neighbourhood Teams (INTs), continue to strengthen preventative, personalised & joined-up care, with particular progress in frailty, hypertension & community diagnostics.
III. Reactive Care, which is improving urgent community response, patient flow and discharge.
IV. . Best Start in Life, where work is progressing to strengthen integrated provision for children and young people, including Child Health Hubs, school mental health support and neurodevelopmental pathways.
V. Beter Care Fund (BCF) end of year report.
2. Overall Position
The overall position is that the Hillingdon system is showing clearer signs of stabilisation and measurable improvement, particularly in discharge performance, frailty management and mental health crisis flow.
This reflects the fact that place-based transformation is beginning to translate into operational benefits and emerging population impact. Progress made through the latter part of the year demonstrates that the
direction of travel is positive, with early evidence that integrated neighbourhood working, urgent community alternatives and stronger discharge grip are beginning to change patterns of demand and system
flow.
However, performance remains above operational thresholds in a number of important areas. Emergency Department attendances remain above target, and bed days continue to sit materially above plan,
driven primarily by longer lengths of stay for non-elective patients. The system is therefore in a position where there are real gains to build on, but where the scale and pace of improvement still need to
increase if those gains are to become sustainable and translate into lasting recovery.
The immediate priority is to consolidate what has improved, embed transformation as business-as-usual, and accelerate change where the largest gaps remain. This means sustaining discharge gains, converting
frailty delivery into measurable reductions in admissions and bed days, fully mobilising the reactive care model, and continuing the wider hospital-to-community shift required to meet both local ambitions and
W&NL ICB planning expectations.
Executive Summary
3
3. What Has Improved
• Flow and discharge:
No Criteria to Reside (NC2R) has reduced materially from pre‑intervention levels (~50/day) to an average of ~38/day in April. Daily multi‑agency grip and Gold oversight are now embedded, improving bed
availability and flow.
• Frailty and preventative care:
Frailty case management now covers approximately 50% of the severe frailty cohort, with early evidence of reduced emergency admissions. This is a critical foundation for reducing future bed‑day demand.
• Mental health crisis response:
The redesigned Lighthouse model has improved system flow, with 81% of patients now discharged within 24 hours (up from 55%). There has also been a substantial increase in diversion and discharge home
with support, rising from 31% to 71%, reducing reliance on acute mental health admissions
• Community alternatives to hospital:
The Reactive Care Coordination Hub is live improved pathways now operate with CCTs, X-ray Diagnostics and SDAH. UCR, SCDM, Adult Social Care, DNs, HIU Wellbeing is now embedded into
handovers/MDTs and strengthen links between the ICC Hub joining up care.
• Strong uptake of mobile diagnostics: 285 referrals received since November 2025, with evidence that 196 patients avoided hospital conveyance or attendance. Estimated indicative system savings total
£389,760 against a £135,000 service cost.
4. Where Performance Remains Off‑Track
• Emergency demand:
ED attendances remain above the operational hospital target (April average ~174/day vs target 164/day), despite improvement against last year and the redevelopment baseline.
• Bed days and Length of Stay:
While Non‑Elective admissions volumes are trending down and remain below the redevelopment baseline, bed days remain materially above target, driven primarily by Length of Stay >1 day activity. This
remains the most significant gap.
• Hypertension:
The 16% Hypertension target remains off track, current delivery 14.2%. A delivery plan is in place to reach the 16% target by December 2026.
5. Key Risks
• Workforce fragility: Delivery remains dependent on scarce roles across UCR, discharge, therapy and Lighthouse services. Any slippage risks reduced responsiveness and throughput.
• Scaling new models: Mobile diagnostics, the Coordination Hub and community IV antibiotics are early in implementation; their full impact depends on adoption, staffing stability and integration with
neighbourhood teams.
Executive Summary
4
6. Priorities to Q2 (to September 2026)
I. Sustain NC2R at ≤34/day
Embed discharge processes as business‑as‑usual, maintain daily multi‑agency grip, and deliver a small but consistent surplus in P2 discharges, including improved management of out‑of‑borough
patients.
II. Translate frailty into bed‑day reduction
Scale the frailty operating model, formalise the SOP , and move from coverage to quantified impact on admissions and Length of Stay.
III. Fully mobilise Reactive Care:
Embed the Coordination Hub, align UCR with Virtual Wards frailty pathways, and mental health integration, moving towards a future 24/7 model. Complete the Lighthouse review to enable expansion
toward 10‑patient capacity at any given time,
IV. Hospital to Community Transformation (Left Shift)
We are currently working through the transformation delivery required to reduce outpatient activity by c48,000 appointments, known as Hospital to community (left Shift). This will provide support in
the community for patients/residents that would otherwise have required acute care. This will align with the plans for the new hospital requirements and the W&NL ICB neighbourhood delivery plans.
The initial specialties to begin with are: 1) Frailty, 2) Cardiology, 3) Respiratory, 4) Diabetes/Endocrinology, 5) Renal/CKD, 6) MSK/Rheumatology interface.
7. Board Oversight, Support and decisions:
Continued Board‑level focus on the next phase of scaling the place operating model with sufficient pace and consistency to strengthen the core neighbourhood offer, mobilise community assets, close known
gaps, support neighbourhood health delivery across the whole Place.
The Board is also asked to note the content of the report with respect to the BCF under section 13.
Year-End Outcome Review – Activity Shift & System Impact
5
8. Year End Position Change: 2025/26 marks a shift from growth to early stabilisation across
the system, following sustained increases in demand up to 2024/25. Improvements are evident
in front-door demand, targeted cohorts and short-stay activity, supported by continued
expansion of primary care and same-day pathways.
Primary Care
Within Primary Care, both GP availability and attended appointments have increased consistently
year-on-year . Total GP appointment capacity rose from approximately 3.7 million appointments
in 2022/23 to over 4.2 million in 2025/26. Despite the growth in activity, utilisation rates have
remained high and stable, demonstrating sustained demand across primary care services. When
weighted for population growth, appointment availability and attendance rates have also
improved, indicating that capacity growth has broadly kept pace with increasing population
demand.
➡️ Demand absorbed in primary care, limiting further escalation into acute services
Urgent & Emergency Care
Urgent and Emergency Care activity presents a more varied picture. Type 1 A&E attendances
have shown an overall downward trend across the review period, reducing from around 200
attendances per day in 2022/23 to approximately 180 per day in 2025/26. UTC attendances
similarly reduced overall despite some fluctuation during 2024/25. This may indicate a gradual
shift in activity away from traditional emergency settings towards alternative urgent care
pathways.
➡️ First clear reduction following prior growth trend
Same-Day & Ambulatory Care
Significant growth has been observed within Same Day Urgent Care (SDUC) and SDEC services.
SDUC booked appointments more than doubled between 2023/24 and 2024/25 before
moderating in 2025/26, although activity levels remain substantially above the original baseline.
SDEC activity has increased rapidly year-on-year, rising from approximately 6,700 attendances in
2022/23 to over 27,000 in 2024/25. This suggests increasing maturity and utilisation of
ambulatory and same-day emergency care models, supporting avoidance of unnecessary
admissions.
➡️ Joint lowest Non-elective (avoidable) admissions with ‘ambulatory conditions’
Year-End Outcome Review – Activity Shift & System Impact
6
Care Homes
Care Home metrics demonstrate notable improvement during 2025/26 following
increases in previous years. Care Home Type 1 attendances and Non-Elective Admissions
both reduced significantly compared to 2024/25, returning close to 2022/23 levels. This
may indicate improved proactive management, strengthened community support, and
more effective intervention within care home settings. Average Length of Stay for Care
Home residents also reduced, suggesting improved discharge flow and more timely
management of admissions.
➡️ Clear year-on-year impact in a high-risk cohort
Admissions & Flow
Overall Non-Elective Admissions (NELs) increased steadily between 2022/23 and 2024/25
before plateauing slightly in 2025/26. However, Non-Elective Short Stay admissions
reduced substantially in 2025/26 following sustained growth in prior years. This reduction
may reflect improved streaming, enhanced same day emergency care pathways, and
stronger community-based alternatives preventing avoidable short-stay admissions.
➡️ Improved streaming and pathway effectiveness
Year-End Outcome Review – By Core Programme Area
7
Neighbourhoods (Live Well & Age Well) Summary: Reactive Care (Urgent & Crisis Response, Hospital Discharge)
Summary:
Over the past year, Integrated Neighbourhood Teams have become
established across all localities, embedding a proactive, population health
approach focused on early intervention, multidisciplinary working, and
reducing reliance on acute services. Initial delivery through frailty, diagnostics
and PHM approaches is showing early benefit, though the programme remains
in a scaling phase to drive consistent impact and reduce inequalities.
Headlines
• Integrated delivery model strengthened, with MDTs operational across all
localities and supported by shared digital infrastructure
• Frailty model mobilised, with proactive case-finding underway and a
standardised model progressing to wider rollout
• Mobile diagnostics delivering strong impact – 196 hospital attendances
avoided and significant system savings
Impact for Residents and the System
• Shift toward proactive, preventative care, reducing reliance on acute services
• Earlier identification and management of frailty and long-term conditions
through MDTs and PHM
• Improved access for housebound and care home residents via community
diagnostics
• Reduced avoidable hospital activity, with early evidence of admission
avoidance
• Stronger integration across primary, community, mental health and
diagnostics
• Foundations for reducing inequalities through targeted case-finding and
outreach
Over the past year, the Reactive Care programme has established a more coordinated, community ‑ based
urgent & crisis response, bringing together UCR, mental health & discharge pathways to improve flow &
reduce avoidable hospital use. Early delivery is demonstrating improved length of stay, increased diversion
from acute settings and stronger system coordination, though the model remains in a maturing phase
with further embedding and scaling required to deliver consistent impact.
Headlines
• Coordinated system-wide model in place, integrating UCR, Coordination Hub, discharge pathways and
mental health crisis response
• Coordination Hub (Phase 1 live) strengthening triage, MDT decision-making and system flow across
health and social care
• Lighthouse delivering impact – increased capacity, improved flow and reduction in admissions (40% →
14%) with <24hr stays rising to 81%
• Discharge to Assess (Pathway 1) optimised, with strengthened MDT processes improving decision-
making and throughput
• System-wide discharge improvements reducing delays (NC2R 48 → 33) and improving bed flow
• Enhanced community response capability through SCDM, diagnostics access and stronger links to social
care
Impact for Residents and System
• Reduced avoidable hospital admissions and ED attendance, with more patients managed in the
community
• Improved patient flow and discharge performance, including reduced delays and increased throughput
• Faster access to urgent and crisis care through same‑day coordinated response
• More joined-up care across health and social care, improving MDT working and discharge coordination
• Better patient experience, with more care delivered in appropriate, non-acute settings
Programme Update: Neighbourhoods (Live Well & Age Well)
8
9.0. All INTs fully operational. Multidisciplinary teams are now active across all three localities, providing a consistent neighbourhood model for prevention and coordinated care.
• Frailty programme mobilisation underway: Monthly mobilisation groups and workstreams established, first MDTs delivered in North INT practices, proactive case-finding commenced
using WSIC, and standardised CGA/care planning development progressing.
• Hypertension programme established: Strategic and operational governance groups mobilised, targeted support delivered to low prevalence practices, outreach campaigns completed,
and prevalence increased to 14.2% with optimisation maintained at 82%.
• Strong uptake of mobile diagnostics: 285 referrals received since November 2025, with evidence that 196 patients avoided hospital conveyance or attendance. Estimated indicative system
savings total £389,760 against a £135,000 service cost.
• Hospital to Community pathways progressing: Business cases, workforce modelling, and quality impact assessments underway for heart failure, cardiac rehabilitation, spirometry and
direct access diagnostics pathways. Further discussions taking place with THH re the “left-shift” programme and agreeing a joint approach
• Integrated delivery and digital development: HHCP digital workstream established to support integrated MDT workflows, shared documentation, proactive case-finding and
neighbourhood performance reporting.
• Integrated Neighbourhood Hubs: A new programme manager from Northmores has now been appointed to continue the Estates Business Case for the development of the 3
neighbourhood hubs
9.1. Forward Plan (Qtr. 1 2026/27)
Over the next quarter, the Neighbourhoods programme will focus on consolidating early progress and expanding delivery to ensure consistent, preventative care across all localities:
• Expand Frailty and Anticipatory Care Coverage
o Define and implement a consistent neighbourhood frailty operating model, focusing on severe frailty and rising-risk cohorts.
o Formalise the frailty model through a Standard Operating Procedure. Accelerate MDT working across all neighbourhoods, progressing towards 100% frailty coverage
o Broaden anticipatory care beyond hypertension to include COPD, diabetes, falls prevention and multi-morbidity, prioritising residents at moderate risk.
• Implement the Hillingdon Hypertension Strategy
o Finalise and adopt the borough-wide Hypertension Strategy.
o Finalise and implement the Hypertension Delivery Plan to sustain progress on prevalence, progress education and communications business cases, expand targeted outreach and
implement a standardised practice approach to improve data coding to focus on high-risk cohorts, with targeted recalls and engagement events, including mosque outreach and
support movement towards the 16% prevalence target.
• Secure ongoing commissioning and funding arrangements for the Mobile Diagnostic Service and increase utilisation through wider referral engagement.
• Finalise workforce, governance and pathway arrangements for Hospital to Community phase one services including cardiac rehabilitation, heart failure and community diagnostics.
Programme Update: Neighbourhoods (Live Well & Age Well)
9
By Q1 2026/27, we aim to have a consistent neighbourhood operating model across all localities, with full frailty coverage, expanded anticipatory care and clearer outcome dashboards to track impact and
inequalities. Specifically:
Strengthen Mental Health Integration
• Ensure each INT has a named mental health practitioner by Q4, improving early support for anxiety, depression and emerging cognitive issues.
• Enhance links between INTs, primary care and community mental health teams to reduce escalation to crisis pathways and improve access to brief interventions in neighbourhood settings.
Introduce Neighbourhood Performance Dashboards
• Develop and implement INT-level performance dashboards to provide near real-time insight into activity, outcomes, inequalities and variation between localities.
• Align with the emerging Children & Young People dashboard, enabling whole-life-course neighbourhood monitoring and supporting targeted resource allocation.
• Progress digital solutions, integrated dashboards and neighbourhood reporting to support proactive care delivery, performance monitoring and inequalities reduction.
Progress Neighbourhood Estates (Hubs)
• Continue progressing the infrastructure required to support delivery of Hillingdon’s Neighbourhood Health Service model through the development of three integrated Neighbourhood Hubs at Nestlé (Hayes),
Pembroke and Uxbridge/Civic Centre
• Finalise the Schedule of Accommodation and progress feasibility and design work for the three Neighbourhood Hubs. Advance the Outline Business Case, ensuring alignment with hospital redevelopment, left-
shift priorities and wider system enablers including workforce and digital.
9.2. Key Issues & Risks (Neighbourhoods)
Despite strong early progress, several risks could limit the scale and consistency of neighbourhood impact:
Workforce Capacity & Capability: Scaling preventative and proactive care depends on sufficient clinical and non-clinical workforce. Gaps remain in key roles (geriatricians, pharmacists, therapists, care
coordinators). Without continued recruitment and skills development, INTs may struggle to expand frailty coverage, maintain quality, or keep pace with rising long-term condition demand.
Variation in INT Maturity: Not all INTs are operating at the same level of integration, shared processes or MDT coordination. This creates inconsistent resident experience and uneven delivery of prevention and
anticipatory care. The Neighbourhoods Steering Board is addressing this through standardised operating models and planned investment in co-located Neighbourhood Hubs.
Rising Demand Driven by Demographics & Long-Term Conditions: The ageing population and increasing prevalence of long-term conditions continue to drive demand. As frailty case-finding expands towards
100% coverage, INT caseloads will grow substantially. Without matched capacity, there is a risk that proactive care becomes diluted, reducing its impact on avoidable admissions.
Inequalities Across Localities: Health outcomes vary significantly across Hillingdon, with areas such as Hayes & Harlington experiencing poorer health, lower life expectancy and higher prevalence of long-term
conditions. Neighbourhood improvements may not reach these communities at the same pace unless metrics are monitored with an equity lens (e.g., frailty coverage, hypertension control, Health Checks).
Targeted outreach and tailored interventions will be essential to avoid widening gaps.
Neighbourhoods (Live Well & Age Well) Dashboard
10
Narrative / Likely Cause Actions to Remedy Timeline Accountability
The 10-week rolling average is currently at 218 attendances
per day with an April monthly average of 221, this is against
a target of 180 per day. We continue to see lower levels of
Type 1 activity suggesting more redirections to UTC.
Revised delivery plan incorporating stronger
front door diversion & capacity improvement.
SRO
Neighbourhoods
Narrative / Likely Cause Actions to Remedy Timeline Accountability
Hypertension prevalence continues to increase gradually
and is currently 14.21% as of April 26, against a target of
16%. At present, 14 practices within the Borough are
achieving the 16% prevalence target.
Finalise and implement the Hypertension
Delivery Plan, progress education and
communications business cases, and expand
targeted outreach and high-impact
workstreams.
To meet 16%
Prevalence
target by Dec-26
SRO
Neighbourhoods
Narrative / Likely Cause Actions to Remedy Timeline Accountability
Hypertension optimisation is currently 81% across the
Borough, meeting the target. Performance has
improved gradually over recent months, with a 5%
increase recorded since September 2025.
Strengthen and standardise optimisation
approaches across all practices, including 24-hour
BP monitoring and pharmacist-led medication
reviews. Reinforce call-and-recall systems to
ensure regular follow-up for patients with
uncontrolled or borderline readings
Ongoing SRO
Neighbourhoods
Narrative / Likely Cause Actions to Remedy Timeline Accountability
Hillingdon have one of the best outcomes within WNL.
Case management is effective. Launch of WSIC frailty radar
to support case finding and management of frail patients
First MDT interventions delivered in the
North Neighbourhood with proactive case
finding via WSIC underway
Full coverage by
Apr 26
SRO
Neighbourhoods
Narrative / Likely Cause Actions to Remedy Timeline Accountability
Meeting the quarterly target and yearly average is almost
on target. Which shows the early impact of the frailty
programme. Currently supporting 50% case management to
patients with severe frailty.
Full rollout to 100% severe frailty cohort. Ongoing SRO
Neighbourhoods
Programme Update: Reactive Care (Urgent & Crisis Response,
Hospital Discharge)
11
10.0. Reactive Care Purpose & Model
The Reactive Care Programme strengthens urgent and crisis response in the community so that residents receive the right care, at the right time, in the right place, while reducing avoidable hospital use and
supporting timely discharge. It brings together urgent community response, crisis support, and discharge pathways into a single, coordinated model with a simplified referral route via the new Coordination Hub.
The intended outcome is a joined-up reactive care system that reduces avoidable ED attendances, shortens hospital stays, improves the resident experience and strengthens resilience through winter .
The programme has three core aims:
• Rapid Urgent Community Response (UCR): Deliver fast, community-based interventions that stabilise health and social care crises and prevent avoidable A&E attendances or admissions.
• Timely and Safe Discharge: Improve discharge planning and post-discharge support, ensuring residents who no longer meet criteria to reside (NC2R) leave hospital promptly and safely.
• Bridging Preventative and Reactive Care: Strengthen the link between preventative care (INTs) and crisis response—ensuring early deterioration is managed proactively and repeat emergency use is reduced.
10.1. Components of Reactive Care (Progress Update)
• Reactive Care Coordination Hub (Phase 1 – April 2026): Improved pathways now operate with CCTs, X-ray Diagnostics and SDAH. UCR, SCDM, Adult Social Care, DNs, HIU Wellbeing is now embedded
into handovers/MDTs and strengthen links between the ICC Hub joining up care. Phase 2 (now live) will expand to include frailty, mental health and end-of-life coordination with a pilot aligned to the North
INT Frailty MDTs.
• Lighthouse : Having opened in August 2023, a new operating model went live in November 2025: adapting the staffing model, space utilisation, introduction of prescribing and increasing the patient capacity
from 4, to the current 6 and flexes up to 8-10 depending on patient risk profile/safe staffing. Referrals are from UTC, A&E and PLS. on average, a doubling in weekly average referrals, a reduction in length of
stay [81% now less than 24hrs, from 55% prior to transformation] which has improved flow, and increase in the proportion of patients being diverted/discharged home with support vs being admitted to a
MH acute setting [71% up from 31%].
• Discharge to Assess (D2A) Pathway 1 (P1) Integration: The service continues to show high utilisation (92% in Dec → 94% in Jan). Length of stay is improving (9.3 → 7.8 days) but remains above the ≤5-day KPI,
driven primarily by reablement waits and family-related delays. To address this, the service is restructuring the daily D2A coordination call, launching daily joint Therapy care case reviews, piloting the new
Patient Discharge P1 leaflet, and establishing regular touchpoints between care providers, to unblock delays and improve flow.
• Discharge Pathways & NC2R Reduction: Continued daily multi-agency ward reviews, weekly Gold Command oversight, revised standard operating procedures and strengthened discharge pathways. This
has contributed to a significant reduction in NC2R, currently at a daily average of 38 down from an average of 48, improving flow and freeing bed capacity.
Programme Update: Reactive Care (Urgent & Crisis Response,
Hospital Discharge)
12
10.2 Next 6 Months Priorities (to September 2026)
• Full Mobilisation of the Coordination Hub: Planning for Phase 2 (now live) will include frailty pathways, end-of-life rapid response and mental health integration, moving towards a future 24/7 model.
• Lighthouse Mental Health Crisis Expansion: Complete permanent recruitment; embed the new team; operational leads to consider walk-ins and risk mitigations before agreeing to roll it out. Walk-ins
has the risk of using up required capacity to take on MH patients in crisis from and to support A&E/UTC.
• Launch of an Integrated Rehabilitation & Reablement Service: Work continues on refining the operating model, governance and weekend capacity, with the aim of enabling consistent 7-day discharges.
Further expansion (including community rehab beds) will be explored to address Pathway 2 delays.
• Sustain NC2R ≤34: Work aggressively to sustain NC2R (medically fit) inpatients at or below 34 per day through winter and beyond. This involves Interim IDT Leadership, operationalising the daily multi-agency
discharge huddles, weekly system reviews, Place Gold Command, reviewing functioning of IDT , and escalating any issue early. By end of Q4, the aim is that Hillingdon will
10.3 Issues & Risks (Reactive Care)
• ED Demand
High A&E attendances continue to place pressure on flow and reactive services. Demand surges may reverse recent gains unless community capacity and same-day alternatives remain consistently available.
• Workforce Fragility
UCR, therapy, discharge teams and Lighthouse all rely on skilled staff. Any gaps—particularly in SCDMs, therapists or assessors—risk slower response times and reduced community capacity.
• Variation in Discharge Processes
The system remains over-reliant on senior escalation rather than routine operational practice, leaving performance vulnerable as we move into winter . Interim senior leadership for the Integrated Discharge
Team and a rapid multi-agency redesign of the discharge operating model to be implemented to ensure the improvements made to date can be stabilised, embedded and sustained through winter and
beyond.
• Scaling New Models
Mobile diagnostics, community IV and the Coordination Hub are early in implementation. Their full impact will depend on adoption by referrers, reliable staffing and integration across INTs and acute services.
Reactive Care (Urgent & Crisis Response, Hospital Discharge) Dashboard
13
Narrative / Likely Cause Actions to Remedy Timeline Accountability
The 10-week rolling average is currently 174 attendances per day, with
a April average of 174 also. Type 1 attendances have decreased
significantly in recent months, with a greater proportion of patients
being appropriately redirected to UTC and SDEC services.
Accelerate community alternatives to A&E by
embedding the Coordination Hub, scaling UCR response,
and increasing use of mobile diagnostics, SDEC supported
by continued optimisation of the Lighthouse service to
expand crisis capacity to sustaining the downward trend
Phased Rollout
on-going SRO Reactive Care
Narrative / Likely Cause Actions to Remedy Timeline Accountability
The 10-week rolling average currently stands at 39 NEL admissions per day,
against a target of 29. This figure has remained relatively stable over recent
months. While there has been an overall reduction in NEL activity over time, and
NEL admissions with a length of stay (LoS) of 0 days continue to decline, further
improvement is required in reducing admissions with a LoS greater than >2 days.
Strengthen community alternatives by scaling
UCR, embedding the Coordination Hub, and
expanding neighbourhood MDT management
and diagnostics.
SRO Reactive Care
Narrative / Likely Cause Actions to Remedy Timeline Accountability
Significant progress has been made in reducing the number of patients
recorded as having No Criteria to Reside over recent months. The 10-week
rolling average currently stands at 37, with an April monthly average of 38.
This represents an increase of one compared to March and places
performance four above the target of 34.
SRO Reactive Care
Narrative / Likely Cause Actions to Remedy Timeline Accountability
Overall, we are meeting the discharge delay targets for all pathways.
Please note Pathway 2 is not split out and contains Rehab.
Key contributors to delay include discharge process bottlenecks—
particularly time to placement within the P2 pathway—referral process
delays across all pathways (including D2A and District Nursing), family
choice-related delays, and broader capacity constraints.
Embed MDT-led referral quality checks into daily D2A
coordination calls to strengthen front-door decision-
making and alignment with the Bridging + D2A
Therapy integration model
Choice Policy
Live. Integrated
services to be in
place by April
26
SRO Reactive Care
Narrative / Likely Cause Actions to Remedy Timeline Accountability
Variable Care Home capability in managing pts who have behaviours that
challenge and also recognising signs of deterioration. Not all CHs have
routine Pharmacy input to ensure pts at highest risk have a medication
review.
Structured medicine and UCP reviews on-going.
SCDM to support Care Home at weekends. Roll out
of recognising signs of deterioration training to take
place in Q4.
Phased Rollout
on-going SRO Reactive Care
Programme Update: Best Start to Life (Children & Young People)
14
11.1 Purpose and Model
The Best Start in Life programme aims to ensure every child in Hillingdon has the foundations for a healthy, safe and positive start. The programme focuses on:
• Early identification and intervention: Detecting developmental, health and wellbeing needs as early as possible (during pregnancy, infancy and early childhood) and providing timely support through the
Healthy Child Programme and early years checks.
• Integrated children’s services: Bringing together health, social care, education and voluntary services around the child and family, supported by Family Hubs and the emerging Child Health Hub model,
enabling families to access multiple services in a coordinated way.
• Preventing ill-health: Tackling risk factors early by promoting healthy weight, good oral health, high vaccination coverage and positive mental wellbeing to reduce future problems.
• Reducing inequalities: Targeting support to the most vulnerable children and communities, particularly those facing deprivation or at higher risk of poor outcomes. This aligns with Core20PLUS5 priorities,
which highlight immunisation, obesity, mental health, oral health and asthma as key focus areas.
• Through these priorities, Hillingdon aims to improve early years outcomes such as school readiness, healthy weight in Reception and Year 6, and longer-term health and wellbeing across the life course.
11.2 Delivery Update
Recent progress in the Best Start in Life program include:
Child Health Hub Development
A multi-agency group met in November 2025 to begin designing Child Health Hubs aligned with the neighbourhood model. These hubs will provide a single, integrated point of access for paediatric clinics,
developmental assessments and family support linked to Family Hubs. Work continues to have these Hubs up and running in 2026/27.
CYP Neighbourhood Dashboard
Work is underway on a Children & Young People dashboard to provide a consolidated view of key metrics by neighbourhood, including immunisations, A&E attendances for under-fives, developmental checks,
school readiness, oral health and obesity. The dashboard will support improved outcome monitoring, transparency and targeted action where inequalities persist. Full development and launch are expected by
the end of Q2 2026/27.
Mental Health
• Mental Health Support Teams (MHSTs) - Hillingdon was selected for the Wave 14 expansion of MHSTs, which will extend provision to an estimated ~80% of schools from January 2026 (up from ~60%).
MHSTs provide early support for children with mild-to-moderate mental health needs and play a vital role in reducing escalation into specialist CAMHS service.
• Mental Health pathways for young adults - We are continuing to focus on improving our mental health pathways for young adults aged 16-25. Our Discovery College is co-produced with young adults and
mental health professionals, offering in-person or online workshops, tailored to meet their unique needs. It continues to expand with our ‘Making Sense of Senses’ course launching in June and a focus on
preparedness for University in August.
Neurodevelopmental Pathways
Demand for neurodevelopmental assessment has increased significantly, and Hillingdon currently had just under 2,000 children awaiting assessment (as of October 2025). Additional NWL ICB (pre merger)
investment for 2025/26 will enable around 75% of these children to be assessed. CNWL is redesigning pathways—using digital tools and streamlined clinical processes—to increase productivity and reduce
waiting times. See next page for actual deliver
Baby Friendly Initiative (BFI)
Hillingdon has achieved Baby Friendly Initiative (BFI) Stage 3 accreditation, which is a very proud and significant moment, as it is the final step towards full accreditation, assessing the actual experiences of
parents. It ensures Maternity and Health Visiting services provide high-quality, practical support for infant feeding and parent-infant relationships.
Programme Update: Best Start to Life (Children & Young People)
15
11.3 Metrics & Performance (CYP Outcomes)
Key outcome measures for Best Start in Life are being consolidated into the new Children & Young People (CYP) dashboard. Current headline metrics include:
Neurodevelopmental Waiting Times
• As of October 2025, ~1,980 children were waiting for a neurodevelopmental assessment.
• Non-recurrent funding provided by the ICB in late 2025 has increased capacity to see 1,500 of these children and significantly reduce the number of children waiting
• CNWL are mobilising a new model for assessing children – SHINE (Specialist Hub for Integrated Neurodevelopmental Evaluation).
• This is an optimised pathway across the whole Trust to assess children with neurodevelopmental concerns which is digitally optimised (including fully utilising ambient voice technology) and providing one
neurodevelopmental assessment rather than separate ASD and ADHD diagnoses.
• Modelling is showing that the new pathway will double our capacity and allow us to have capacity to see close to 60% of the referrals we receive, up from 30% currently. Although there will still be a gap in
capacity and children will still be adding to the waiting list, this is will increase slower than currently.
• Phase One is due to go live in August and includes a new Single Point of Access. Further communication is forthcoming to relevant stakeholders such as primary care and schools.
Mental Health Support Teams (MHSTs) in Schools
• Wave 14 expansion of our MHST offer in schools went live in January.
• MHSTs in Hilllingdon now covers 74% of schools
• The newly formed West and North ICB are proposing a staged approach for all boroughs to reach 100% coverage by 2029/30. For Hillingdon, additional waves of funding are scheduled in 2027/28 and
2029/30.
• Performance tracks number of schools supported, pupils reached, and uptake of interventions (individual support, groups, workshops)
• The MHST team are also finalising webinars to support parents which will be run over the summer holidays.
Early Years Outcomes
• Two priority indicators—school readiness and children’s oral health—show room for improvement and are central to Best Start priorities.
• Data for school readiness, immunisations, dental access and oral health prevalence will be incorporated into the CYP dashboard.
• The Children’s Oral Health pilot is expected to improve the % of under-5s attending a dentist annually, particularly in high-need areas.
• Childhood obesity (Reception and Year 6) will be monitored as a key long-term prevention measure.
Service Utilisation and Preventative Reach
• The dashboard will monitor uptake of Health Visitor reviews (new birth visit, 2–2½ year checks), immunisation coverage (including MMR), and A&E attendances for under-5s.
• These metrics provide insight into access, prevention, and parental support.
• The intention is to introduce an overall Best Start RAG rating in future reports to show progress and highlight areas requiring targeted action
Cross-Cutting System Risks & Mitigations
16
12.1 Cross-Cutting System Risks and Mitigations
This section summarizes system-wide risks that span multiple programmes (Neighbourhoods, Reactive Care, Best Start) and their mitigation strategies:
High ED Attendances: Emergency Department visits remain above target, risking overcrowding and missed performance standards.
• Impact: Strains hospital resources, increases wait times, and could lead to poorer outcomes if patients aren’t seen timely.
• Likelihood: Medium/High, given underlying demand.
• Mitigation: Strengthen alternatives to ED – e.g. Front Door Diversion strategies such as GP direct-to-SDEC pathways and Pharmacy First referrals to handle minor cases. The UCR 2-hour crisis response and
Lighthouse mental health diversion reduce unnecessary A&E arrivals. Continued public messaging to use 111 and community services for non-critical needs (including 24/7 urgent dental care via 111) also
supports this. The new Coordination Hub will play a role by directing referrers to appropriate community options, further easing ED burden.
NC2R (No Criteria to Reside) Relapses: After intensive effort, NC2R (delayed discharges) numbers have dropped to ~35, but could rise again without sustained focus.
• Impact: High – rising NC2R leads to bed shortages, and ED backups (when wards are full).
• Likelihood: Moderate; risk increases if winter capacity is strained or if processes slip.
• Mitigation: Embed the discharge improvement measures as business-as-usual: daily multi-agency discharge huddles, a and strict escalation according to the NC2R SOP. The Place “Gold” command structure
will continue to quickly resolve blockages. In addition, new community capacity (through integrated Reablement and bridging care) coming online in Dec 2025 will help absorb more discharges promptly.
Maintaining NC2R ≤34 is a key success criterion, and any upward trend will trigger a rapid response by the system resilience group
Workforce Constraints: Across the system, recruiting and retaining skilled staff is a concern.
• Impact: If key roles are unfilled (e.g. community nurses, care coordinators, GPs, therapists, psychologists), it hampers service delivery and innovation uptake. Burnout is also a risk with the current pressures.
• Likelihood: High in certain areas (national shortages in nursing, therapy, social care).
• Mitigation: A multifaceted approach – targeted recruitment drives (for example, WNL has funded 4 additional specialist nurses for palliative care to fill critical gaps), cross-skilling existing staff (training
pharmacists and paramedics to take on expanded roles in UCR and care homes). The integration of teams also offers opportunity to better utilise the collective workforce – e.g., having PCN pharmacists assist
with care home medication reviews, or mental health practitioners working within INTs, to spread expertise.
Long-Term Condition Growth: The population is experiencing growing prevalence of chronic conditions (diabetes, heart disease, COPD, etc.), which could drive future unplanned care demand.
• Impact: Medium to long-term – without action, more people will present in crisis with preventable complications (strokes, heart attacks, decompensated COPD).
• Likelihood: High, given demographic and national trends.
• Mitigation: Prevention and early intervention are our main tools. The Neighbourhoods programme directly addresses this through hypertension and frailty initiatives (already showing success in reducing
admissions), and the WNL Enhanced Services focus on Cardiovascular-Renal-Metabolic diseases will further help manage risk factors in primary care. Continued investment in wellness services (smoking
cessation, weight management) and community engagement in healthy lifestyles (leveraging Healthy Places and Equity work) is crucial. Essentially, mitigating this risk means continuing the “left shift” of care
– moving care into community and preventative settings – which is exactly the strategy of Live Well and Age Well interventions.
Better Care Fund (BCF)
17
13.0 Better Care Fund (BCF) 2025/26 End of Year Reporting
There is a national requirement for Health and Wellbeing Boards to complete and return a template that reports on compliance with national conditions, performance against three national metrics as well as
performance against the agreed income and expenditure plan. Details from end of year reporting template can be found this link Better care fund 2025/26 documents | Hillingdon Council.
Headlines
Metrics
• Emergency admissions (target not met): The outturn for 2025/26 is 9,644 admissions against a planned target of 9,490, which means that performance was marginally above the plan.
• Discharge delays (target not met): The 2025/26 outturn shows that nearly 91% of adult patients were discharged on their discharge ready date (DRD) against a target of 93.9%. The average number of
delayed days between the DRD and the actual discharge date was 5.1 days against a ceiling of 5.9 days, which is positive.
• Permanent admissions to care homes (target met): There were 170 permanent admissions to care homes during 2025/26, which was the ceiling.
Income and Expenditure
• The total value of the 2025/26 plan was £74,606,938 and expenditure was 98% (£73,333,652).
• There was a £1,944,243 underspend against the DFG budget and a £671,000 overspend in the NHS additional contribution attributed to increased costs arising from the new community equipment contract.
Successes
• Population approaches: Holistic cross sector approaches at Neighbourhood level are supporting proactive care and controlling demand from at risk groups.
• Integrated workforce: Development of workforce passport across Place enables staff to move around providers to develop their skills whilst retaining their expertise at Place. It is expected that the true
benefits of this initiative should start to be realised in 2026/27.
Challenges
• Digital records, data and shared information: The timeliness and accuracy of data but improvement as new systems embed, e.g., Optica.
• Sustainable care provider market: This is a continuing issue that is critical to the sustainability of the health and care system. Key issues continue to be recruitment and retention of a suitably qualified
workforce and addressing inflationary pressures. The Board may wish to note that 2025/26 saw the liquidation of the community equipment service provider, which presented a major challenge to the
system but was managed effectively by collaboration between the Council, local partner organisations, and the ICB.
Key Project Highlights
18
Integrated Response Coordination Hub
19
Purpose
The Integrated Response Coordination Hub will provide a single coordination point for out-of-
hospital patients in crisis, ensuring right care, right time, right place decisions, rapid response, and
safer transitions between proactive, planned and urgent care to reduce unnecessary acute activity
Achievements Phase 1
• Senior Clinical Decision Maker (SCDM) Operational – 8-8pm 7days – supporting
UCR/YLL/CCTs/CHST/FAU, inc making referrals for diagnostics
• Improved referral and communication to Adult Social Care
• Agreed Wellbeing support to be able to accept referral earlier
• Direct stepdown to CCTs and other specialist services for appropriate patients.
• Direct links into SDUC and Phlebotomy service
• Comms posters created for SCDM and Mobile Diagnostics
Phase 1 Still to be embedded by March 26
• Developing YLL and DNs reporting on SystemOne to include 2hr response
• Implement SCDM supporting FAU and Podiatry – pathway being developed
• Implementing earlier identification of Wellbeing Support
• New process for NWL ICC Coordination hub to refer to SCDM for onward care if
appropriate – signed off 12/02- went live 09/02 -on going improvements
• Improved shared information UCP care planning and better coordination of care-SCDM
trained and updated UCPs if appropriate
• Increased utilisation for SCDM and Mobile Diagnostics – posters created, and webinars
organised
• IT scope requirements documents created –presented at HHCP IT & Digital Data
Steering group 10th Feb. Prioritisation and mapping exercise to be done.
• Conduct workforce mapping on services with identified functions/skills and current capacity
Phase 2 From March to June 26
• Extend wider than UCR to include EOL, Frailty and mental health and align with the
Neighbourhood model being developed
• Agree and Implement core team for Coordination hub
• Set up infrastructure, systems, process, workforce and training
• Working with ED/Virtual Wards to prevent admission
• Align with Bridging/D2A improvement being developed
• Performance framework and metrics agreed with automated reports set up
Impact and data
• ASC, UCR, DNs, SCDM and HIU Wellbeing support attend regular MDTs, cases are brought
to discuss urgent complex patients.
• CNWL has enhanced the accuracy of UCR LoS reporting by removing rejected referrals
from the dataset.
• In March , 251 referrals were received from UCR and 52 from YLL
• CNWL is working on SystmOne templates for YLL to include 2h response, this is
due to be tested and completed in April. From May the data will be captured
in the same way as UCR.
• Below is the expected plan in place to train UCR to take on DNs SOS and the
expansion of UCR. As the changes are implemented the increased activity will be
recorded the same as UCR.
Integrated Response Coordination Hub MDTs
20
Key Themes Emerging Across Cases
• Safeguarding and self-neglect
• Including domestic abuse concerns, hoarding, poor living conditions, refusal
of care, and risks linked to capacity.
• Deteriorating physical health and frailty
• Recurrent falls, mobility decline, pressure damage, leg ulcers, and complex wound
care.
• Complex social circumstances
• Social isolation, family conflict, financial abuse concerns, lack of informal support,
or carers unable to cope.
• Mental health and capacity concerns
• Anxiety, agitation, poor engagement, cognitive impairment (incl.
dementia/brain tumors), and fluctuating capacity.
• Hospital interface and discharge risk
• Frequent admissions/readmissions, delayed discharges, and need for coordinated
care planning.
• Refusal or inconsistency with care
• Patients declining packages of care, medication, or assessments,
increasing clinical and safeguarding risk.
Next Steps
• Continue 3 x weekly Response Hub / MDT oversight for active cases.
• Maintain early escalation of safeguarding themes, particularly self-neglect and refusal of
care.
• Hub membership has grown to include Wellbeing Support Officers (Harlington Hospice)
and Care Connection Team in the last two weeks.
• Strengthen discharge planning links between hospital, DN, UCR, and Adult Social
Care to reduce readmissions.
• Monitor high-risk patients with repeat presentations for proactive, preventative
interventions.
• Improve data collection with system wide shared tracker and clear reporting on impact to
admission avoidance, linked with learning from closed cases to support earlier identification of
recuring risk themes.
Activity Summary (Reporting Period) 27/2/26- 22/4/26
ASC DN UCR Total
Active 2 3 3 8
Closed 12 9 5 26
Total 14 12 8 34
25
20
15
10
5
0
30
40
35
Active Closed Total
UCR
• Admission avoidance and bridging care.
• Rapid clinical assessment and escalation.
• Safeguarding initiation where self-neglect identified.
• Coordination with Social Care for onward support.
DNs
• Clinical monitoring and escalation
• Social or safeguarding concerns identified/ raised early.
• Wound care, pressure damage management, palliative input.
• Identification of safeguarding concerns and risks in the home.
• Ongoing liaison with families and escalation to MDT .
ASC
• Safeguarding enquiries and triage (including MASH).
• Capacity assessments and social care reviews.
• Allocation of social workers and commissioning/review of packages of care.
• Liaison with families around financial assessments and longer term planning.
Wellbeing
• Emotional wellbeing and practical support to reduce stressors such as housing,
finances, benefits, and daily living concerns.
• Signposting and referral to community, voluntary, and statutory wellbein5g services.
Frailty
21
Aim of the Project:
Deliver a borough-wide Frailty Model aligned to the NWL Framework that strengthens prevention, early identification, proactive management and coordinated multidisciplinary care.
Key components: Proactive case finding (WSIC) and risk stratification; Clear mild and moderate–severe frailty pathways; Standardised Comprehensive Geriatric Assessment (CGA); Consistent
personalised care planning (UCP); Regular GP huddles and INT MDTs with consultant geriatrician support; Integration with UCR/Reactive Care, care homes and palliative care.
Project Summary:
• Phase 1 [April 2026: Model]: Hillingdon Frailty Model design/agreement to pilot delivery, based on the NWL Framework/spec.
• Phase 2 [April – Sept 2026: Pilot, evaluation]: Mobilise six-month model pilot + evaluation in the North Neighbourhood, to inform improved SOP , gap analysis and funding requirements
• Phase 3 [Oct 2026: Borough-wide roll-out]: Borough-wide rollout (SE and SW), depending on resource gaps/funding agreements to mitigate.
Delivery Progress: 5 May 2026
• Monthly Frailty Model Mobilisation Group established to oversee workstreams to deliver the frailty model pilot, evaluation, gap analysis and borough-wide rollout
• Workstream subgroups held through April to plan and establish a complex case MDT INT; finalise proactive case-finding methodology; agree paperwork (CGA, care plans etc).
• First weekly MDT INT held on 5 May with four complex case discussions with positive feedback. Initial focus on Cedars and Mountwood Surgeries. Debrief and learning to be taken forward
into following MDTs as the process gets refined/improved before wider rollout. SOP drafted.
• Proactive case-finding has commenced via CCTs with the use of WSIC. Approach to be documented (SOP) and standardised across GP practices and consistently captured on EMIS for
reporting. Focus on severe/rising risk frailty cohort.
• CLCH CGA template transfer to EMIS underway via PrimaryCareIT.
• Resource gap analysis to conclude end of May to outline requirements for wider / full model mobilisation.
• Programme KPIs drafted and will be finalised in May, with baseline collected where available.
• HHCP Digital workstream and SROs agreed, first meeting held, Project Initiation Doc and TOR drafted; with a focus on digital solutions for Frailty, including MDT digital workflows, shared
CGA template, UCP , proactive case-finding enablement etc.
• Meeting held with Haringey for shared learning re their Frailty model.
Challenges:
• Digital solution for shared MDT INT documentation, CGA (likely Blinx) and care plan (likely UCP)
• Resource required to operate a weekly INT MDT with core membership e.g. sufficient geriatrician time, admin support
• Sufficient CCT/GP resource available to support the severe/rising risk cohort identified via WSIC; cases to be prioritised by Frailty Risk Score.
• Given GP workload pressures, the patient’s GP may not always be able to fully attend MDTs, so a GP representative may need to be agreed to ensure continuity and input.
Next steps: Core delivery through Q1
• Pilot underway in two North INT practices; continue May–June refinement of proactive case finding and INT MDT model, with learning used to update SOPs ahead of wider rollout across
North INT.
• Complete resource mapping for frailty services.
• Access, set-up, rollout the standardised CGA and care planning documentation.
• Support the HHCP Digital workstream to collate integrated neighbourhood requirements (Frailty, Reactive Care etc. requirements); explore and oversee digital solutions.
Mobile Diagnostic
22
Aim of the Project
To deliver and evaluate a 6‑month Community Diagnostics pilot providing mobile and community‑based diagnostic provision for frail, housebound, and care‑home patients, with the
objective of reducing hospital conveyances, improving patient experience, and informing future commissioning
Delivery Progress to Date - April 2026
• Strong early uptake and patient benefit demonstrated: Between the 15 November and the end of April, the Community Diagnostics Service has received 285 referrals . Patient case
studies continue to evidence the benefits for frail, housebound and care‑home residents, highlighting avoided hospital conveyances and improved experience.
• Increasing activity and good utilisation for an early-stage service: since the service started in November referrals have been steadily increasing with March remaining our highest level
of monthly referrals at 67 with a slight drop in April with referral rates being 59. This is attributed to the Easter bank holidays. Average referral to discharge remains at 3 days which is
extremely good and utilisation is currently sitting at 60% which which is a slight drop compared to March due to the bank holidays.
• Impact of the Community Diagnostic Service: Audits undertaken have identified that since the service started, 196 patients would have either been transfer to the hospital or taken to
A&E. This is a significant saving based on transport and acute costs.
• Engagement across multiple community pathways: Referrals have been received from Direct GPs (60%), CHST (28%), SCDM (7%), Michael Sobell (3%) and Other (2%). We have also
seen our first acute referral in April. This reflects the service gaining traction across the wider community provider network.
• Integrated Primary Care Service Proposal: A proposal for a Integrated Primary Care Service is currently going through the governance process for approval. It is has already been
approved at the HHCP Finance and Performance Committee and will be going through the Operational Oversight Committee on the 13th May. This will include funding to commission
the Community Mobile Diagnostic service (currently just X-Ray at this point in time) and also the Senior Clinical Decision Maker for 2026/27.
Challenges:
• We hope that the existing Mobile Diagnostic Service will be commissioned for 2026/27, however there are Place discussions that need to take place regarding the potential to expand the
diagnostic provision based on the “left shift” priorities.
• Limited referrals from THH continues to be a challenge
Core Delivery Model to Accelerate Improvement by May 2026
• Confirm Commissioning of Service, the contract is ready to be issued to the provider to continue the mobile diagnostic service (X-Ray) provision for 2026/27 following confirmation of
approval of the Integrated Primary Care Service Proposal.
• Improve awareness and increase referral volumes: We are aiming to continue to promote the service and wider to other services to enabled an increase in utilisation rates
Mobile Diagnostic
23
Impact and data
Significant potential to reduce avoidable acute demand: 15th November to the end of April data shows clear impact on avoidable hospital use:
• 167 patients would otherwise have required hospital attendance with transport
• 14 patients would have had an outpatient hospital appointment
• 29 patients would have been taken to A&E
• 54 patients would have had no X‑ray performed, potentially delaying diagnosis
• 8 were recorded as other (i.e FAU)
The following outlines indicative system savings associated with the Community Diagnostic service. It is likely that this is an underestimation as further tests,
treatment and follow-ups are likely to occur for this patient group once they attend an acute setting.
Activity Total Cost Saving HomeMed Cost (based
on 6 months)
Place Savings (system
savings minus service
cost)
Transport Costs (based on
average £350 to THH and back)
£137,200
A&E Attendance (based on £200
attendance & £172 investigation
and treatment HRG)
£72,912
NEL (based on 50% of care home
patients being admitted at an
average cost of £4,200)
£176,400
Outpatient (based on £232) £3,248
Total Cost £389,760 £135,000 £254,760
Discharge-to-Assess (D2A) Pathway 1 (P1) Integration
24
Purpose – Phase 1 Objectives
To stabilise, integrate and optimise D2A Pathway 1 across Acute, Therapy, CCS and ASC by:
• Reducing duplication and hand‑offs
• Improving referral quality and MDT decision‑making
• Embedding System C as the single record for Pathway 1 decisions
• Improving discharge flow and Length of Stay (LOS)
Phase 2 Objectives
• Move from stabilisation to integration