Read the text of this document (58 pages)
Hillingdon Planning Committee – 12thMarch 2025
PART 1 – Members, Public & Press
Report of the Head of Development Management and Building Control
Committee Report – Application Report
Case Officer:Emilie Bateman 49261/APP/2024/2904
Date Application
Valid:
01.11.2024 Statutory / Agreed
Determination
Deadline:
31.03.2025
Application
Type:
Full Ward: Hayes Town
Applicant: Marvell Developments LLC
Site Address: Unit 4, Silverdale Industrial Estate, Silverdale Road
Proposal: Demolition of existing building and structures on site,
and all other associated site clearance works.
Construction of a data centre building (Class B8) with
plant at roof level with an emergency generator (1no.)
and associated flue (provided within an external
compound adjoining the data centre building), sprinkler
tank and pumphouse, security guard house, and
provision of one kiosk substation and MV Building.
Construction of a new access and internal road and
circulation areas, footpaths, provision of car and bicycle
parking, hard and soft landscaping and other associated
works and ancillary site infrastructure.
Summary of
Recommendation:
GRANT planning permission subject to section 106
legal agreement and conditions
Reason Reported
to Committee:
Required under Part 1 of the Planning Scheme of
Delegation (Major application recommended for
approval)
Hillingdon Planning Committee – 12thMarch 2025
PART 1 – Members, Public & Press
Summary of Recommendation:
GRANT planning permission subject to the completion of a satisfactory
section 106 legal agreement to secure the heads of terms set out below,
and subject to the conditions as set out in Appendix 1.
S106 Legal Agreement Heads of Terms
It is recommended that delegated powers be given to the Director of
Planning, Regeneration and Environment to grant planning permission
subject to the following:
A) That the Council enter into a legal agreement with the applicant under
Section 106 of the Town and Country Planning Act 1990 (as amended) or
any other legislation to secure the following:
1. Air Quality Mitigation contribution of £70,024.
2. A Healthy Streets/Active Travel Zone contribution of £29,700.
3. A full Travel Plan to be approved in writing by the Local Planning
Authority.
4. A Carbon Offset contribution of £435,604.
5. An Employment/ Construction Training Scheme secured in
accordance with the Council's Planning Obligations SPD.
6. A Project Management and Monitoring Fee, equalling 5% of the total
financial contributions to be paid under this agreement.
B) That in respect of the application for planning permission, the applicant
meets the Council's reasonable costs in preparation of the Section 106
Agreement and any abortive work as a result of the agreement not being
completed.
C) That officers be authorised to negotiate and agree the detailed terms of
the proposed agreement and conditions of approval.
D) That, if the Legal Agreement has not been finalised within 6 months (or
such other time frame as may be agreed by the Director of Planning,
Regeneration and Environment), delegated authority be given to the
Director of Planning, Regeneration and Environment to refuse planning
permission for the following reason:
'The applicant has failed to mitigate the impacts posed by the proposed
development (in respect of Air Quality, Highways Safety, Travel Planning,
Carbon Offsetting and Employment). The scheme therefore conflicts with
Policies DMCI 7 of the Hillingdon Local Plan: Part 2 (2020); the adopted
Hillingdon Planning Committee – 12thMarch 2025
PART 1 – Members, Public & Press
Planning Obligations Supplementary Planning Document (2014); Policy
DF1 of the London Plan (2021); and paragraphs 56-58 of the National
Planning Policy Framework (2024).'
E) That if the application is approved, that the permission is subject to the
Conditions as set out in Appendix 1.
1 Executive Summary
1.1 This application seeks permission for the redevelopment of Unit 4, Silverdale
Industrial Estate, Hayes, to provide a 1-megawatt (MW) data centre (Use Class
B8), including associated infrastructure, car parking, cycle storage, and
landscaping.
1.2 The proposed development is considered acceptable in land use terms, as the
site is located within a Strategic Industrial Location (SIL). The development is
considered to have minimal impact on the surrounding area and is consistent
with the objectives of the Hillingdon Local Plan and the London Plan. In addition,
no neighbouring representations have been received.
1.3 The economic benefit of commercial development is acknowledged and
supported by national, regional and local planning policies. As noted under
Paragraph 85 of the National Planning Policy Framework (NPPF) (2024),
significant weight should be placed on the need to support economic growth and
productivity.
1.4 Subject to the planning conditions and obligations recommended, the proposed
development is considered acceptable with respect to design, heritage,
residential amenity, environmental issues, transport, and sustainability.
1.5 For the reasons outlined above and within the main body of the report, this
application is considered to comply with the Development Plan and is
recommended for approval, subject to securing the planning conditions set out
in Appendix 1 and a Section 106 legal agreement.
2 The Site and Locality
2.1 The site comprises a 0.37ha brownfield site at Silverdale Industrial Estate, Hayes
(Figure 1). The existing site includes a vacant warehouse comprised of a ground
floor unit with ancillary office floorspace at mezzanine. There is hardstanding to
the north of the building representing the primary service yard forecourt (Figure
2). A narrow access lane is to the west of the building and a small service yard
to the rear (south) of the building.
2.2 The surrounding area is predominantly characterised by industrial and
warehouse units located at Silverdale Industrial Estate, varying between 1-2
storeys. In the immediate vicinity of the site, a small car park comprising
hardstanding is located to the north; 2 no. industrial warehouses are located to
Hillingdon Planning Committee–12thMarch 2025
PART 1–Members, Public & Press
the east; the London -Reading railway line is located adjacent to the southern
site boundary; Hillingdon Borough Central Mosque, an industrial warehouse and
a single lane road accessed off Silverdale Road are located west of the site; and
the canal is located to the south west.
2.3 Botwell Nestles Conservation Area is located approximately 150 metres south-
west of the site which includes 4 no. locally listed buildings, whilst the Grade II
listed 'Below Works' factory building is approximately 100 metres west of the site.
No further statutory heritage assets are within the immediate vicinity of the site.
The site is located on potentially contaminated land and within an Air Quality
Management Area and Hayes Focus Area.
Figure 1: Location Plan (application site edged red)
Figure 2: Street View Image of the Application Property
Hillingdon Planning Committee – 12thMarch 2025
PART 1 – Members, Public & Press
3 Proposal
3.1 This application seeks permission for the demolition of an existing warehouse
building and the construction of a data centre with associated facilities. The
Gross External Area (‘GEA’) of the proposed development is 1,914 sq.m.
3.2 The proposed 1MW data centre would provide a gross floor area (GFA) of
approximately 1,778 sq.m, over two storeys with plant located at roof level. The
building would have a parapet height of around 14.7 metres and would house
data halls, electrical and mechanical plant rooms, a loading bay, maintenance
and storage space, and office administration areas (Figure 4 and 5). An
emergency generator (one unit) and flue would be situated within an external
compound adjacent to the data centre building.
3.3 Additionally, the proposal includes several ancillary structures, such as a
sprinkler tank, pumphouse, security guard house, a kiosk substation, and a
medium voltage (MV) building (Figure 3). The development would also include
provisions for access, car parking (8 spaces), and bicycle parking (8 spaces),
along with hard and soft landscaping, boundary treatments, lighting, and all
associated works, including underground foul and stormwater drainage systems
and utility cabling.
3.4 During the course of the application, minor amendments were submitted. The
amendments submitted conceal the plant equipment at roof level by raising the
parapet and pulls back the fence line from Silverdale Road.
Hillingdon Planning Committee–12thMarch 2025
PART 1–Members, Public & Press
Figure 3: Proposed Site Plan (please note –a larger version of plan can be
found in the Committee Plan Pack)
Hillingdon Planning Committee–12thMarch 2025
PART 1–Members, Public & Press
Figure 4: Proposed Elevations(please note –a larger version of plan can be
found in the Committee Plan Pack)
Figure 5: Proposed Ground Floorplans (please note –a larger version of plan
can be found in the Committee Plan Pack)
Hillingdon Planning Committee – 12thMarch 2025
PART 1 – Members, Public & Press
4 Relevant Planning History
There is no relevant planning history related to the site.
5 Planning Policy
A list of planning policies relevant to the consideration of the application can be
found in Appendix 3.
6 Consultations and Representations
6.1 A total of 19 no. letters were sent to neighbouring properties, a site notice was
displayed to the front of the site and an advert was posted in the local paper. All
forms of consultation expired on 24 February 2024.
6.2 It is noted that no representations were received from neighbouring occupiers.
6.3 Consultee responses received are summarised in Table 1(below). Full copies
of the responses have also separately been made available to Members.
Table 1: Summary of Consultee Responses
Consultee and Summary of Comments
Planning Officer
Response
External Consultation
Canal and Rivers Trust
Based on the information available our
substantive response (as required by the
Town & Country Planning (Development
Management Procedure) (England) Order
2015 (as amended)) is that the Trust has no
comment to make on the proposal.
Noted.
Thames Water
Thames Water has no objection to the
proposed development regarding wastewater
network and sewage treatment infrastructure.
However, surface water drainage should
follow the sequential approach in line with
Policy SI 13 of the London Plan 2021. If
discharge to a public sewer is proposed, prior
approval from Thames Water Developer
Services is required.
The Thames Water
comments are noted.
Please refer to Informative
10.
Hillingdon Planning Committee – 12thMarch 2025
PART 1 – Members, Public & Press
The developer must also demonstrate
measures to minimise groundwater
discharges into the public sewer, as
unauthorised discharge is illegal under the
Water Industry Act 1991. An informative is
recommended regarding the need for a
Groundwater Risk Management Permit.
National Air Traffic Services (NATS)
NATS has no safeguarding objection to the
proposed development based on the
information provided. However, they request
re-consultation if any changes are made to the
proposal that may affect their assessment.
The NATS comments are
noted.
Heathrow Airport Safeguarding
Heathrow Airport Safeguarding has no
objection to the proposed development.
However, as the site falls within Heathrow
Airport’s crane circle, the crane operator must
submit details to the CAA Airspace
Coordination and Obstacle Management
Service (ACOMS) before installation. No
cranes should operate on-site until Heathrow’s
Works Approval Team has issued a crane
permit.
The Heathrow Airport
Safeguarding comments are
noted. Please refer to
Informative 9.
Ministry of Defence
The Ministry of Defence (MOD) has no
objection to the proposed development
following their review, confirming no
detrimental impact on defence sites or assets.
However, any future amendments to the
development, such as changes in location,
dimensions, or materials, may require further
assessment to ensure no impact on MOD
safeguarding requirements. The MOD should
be consulted if any revised or additional plans
are submitted.
The Ministry of Defence
comments are noted.
London Fire Brigade
The London Fire Brigade (LFB) has reviewed
the fire safety documents for the proposed
The London Fire Brigade
comments are noted.
Hillingdon Planning Committee – 12thMarch 2025
PART 1 – Members, Public & Press
development. They advise ensuring that the
plans comply with Part B of the Building
Regulations and that the application is
submitted to Building Control, who may
consult the Fire Authority. The applicant
should also follow the guidance in Approved
Document B, particularly regarding fire
brigade access and water provisions. Any
deviations from these standards should be
discussed with the LFB's Water Office or Fire
Safety Regulation team for further
assessment.
It is noted that the
development should accord
with the relevant Building
Regulation requirements.
Fire safety matters are also
to be addressed through
Condition 24.
Transport for London (TfL)
Transport for London (TfL) has no objections
to the proposed development concerning
London Underground/DLR infrastructure.
However, as the site is adjacent to National
Rail (NR) infrastructure, the applicant is
advised to contact NR directly to assess any
potential impacts on the railway. This
response pertains solely to railway
engineering and safety matters.
The TfL comments are
noted.
Please refer to paragraphs
7.75 – 7.97 for consideration
of transport matters.
Network Rail
Network Rail requires the applicant to engage
with their Asset Protection team due to the
development's proximity to railway
infrastructure. Key requirements include
ensuring scaffolding, cranes, and foundations
do not affect the railway, providing a 1.8m
trespass-proof fence, and consulting Network
Rail on any ground level changes or
excavation works. Buildings should be at least
2 metres from the boundary, and any
landscaping near the railway must be
approved. Lighting must not interfere with
railway signalling. All work near Network Rail
land must be done in accordance with their
guidelines.
The Network Rail
Safeguarding comments are
noted. Please refer to
Informative 1.
London Borough of Ealing
On 13 December 2024 our determination in
this instance is No Objection.
Noted.
Hillingdon Planning Committee – 12thMarch 2025
PART 1 – Members, Public & Press
Internal Consultation
Planning Policy Officer
No objection in principle subject to detail.
The Planning Policy Officer
comments are noted.
Matters relating to the
principle of development are
addressed in paragraphs
7.1 – 7.17 of this report.
Urban Design Officer
03-12-24 Initial Comments
The Urban Design Officer raised several
concerns regarding the development’s design,
particularly the use of fencing and greening.
Key points included the need to rationalise the
two lines of fencing, with a suggestion to
replace the palisade fence with a mesh
solution. They also recommended integrating
a green living wall with the public realm and
adding trees to improve the frontage.
Further concerns were raised about the
limited use of rear spaces for greening and
biodiversity, with suggestions to connect these
areas to the railway line and create staff
amenity spaces.
The Officer also requested clear identification
of tree root protection zones and expressed
concerns over underground utilities potentially
impacting key green areas.
10-02-25 Response and Revised Proposals
In response to the feedback, the applicant has
made several improvements. The fence line
has been set back, and the palisade fence
has been replaced with weldmesh fencing,
addressing visual concerns. Public access is
restricted by fencing due to security concerns.
The Urban Design Officer
comments are noted.
Matters relating to design
are addressed in
paragraphs 7.18 – 7.29 of
this report.
The final design details of
the materials and landscape
scheme are proposed to be
secured by Conditions 18
and 20.
Hillingdon Planning Committee – 12thMarch 2025
PART 1 – Members, Public & Press
The building’s appearance has been
enhanced by raising the parapet level to better
conceal rooftop services.
Greening efforts have been acknowledged,
with a recommendation to add more trees,
especially to the south and near Silverdale
Road. An updated Tree Survey has been
provided. Utilities plans have been supplied
and provide confidence in landscaping.
The changes sufficiently address the
concerns, and the Urban Design Officer
recommends conditioning the following to
ensure high-quality design:
Fence colour
Green wall / screen details
Detailed landscaping strategy (number,
type, and distribution of species - trees
and other greening)
Signage and lighting
Access Officer
The Access Officer has no accessibility
concerns regarding the proposal. However,
they recommend attaching an informative to
any planning permission, highlighting the
requirements of the Equality Act 2010.
The Access Officer
comments are noted.
Please refer to Informative
12.
Highways Officer
The Highways Officer has reviewed the
Transport Statement (TS) and supports the
conclusion that the proposed development
would not significantly impact the local
highway network. Key points include:
The site is well-located for sustainable
transport, with good access to local
amenities and public transport, despite
its low PTAL rating.
The proposed development would
generate fewer vehicle trips compared
to the current use.
The site’s access, layout, and internal
arrangements are suitable for the
The Highways Officer
comments are noted.
Matters relating to transport
are addressed in
paragraphs 7.75 – 7.97 of
this report.
Please see the ‘Summary of
Recommendation’ section of
this report for confirmation
of the heads of terms to be
secured in a section 106
legal agreement.
Hillingdon Planning Committee – 12thMarch 2025
PART 1 – Members, Public & Press
forecast traffic, including HGV and car
access.
Compliance with parking and cycle
parking standards has been
demonstrated, with provision for EV
charging.
A contribution towards the Healthy
Streets initiative is required to improve
pedestrian and cyclist access, reducing
car dependency and enhancing safety.
The Highway Authority raises no objections
subject to conditions regarding cycle parking,
EV charging, construction management, and
informatives. A financial contribution towards
Highway Improvement works and travel plan
to encourage sustainable modes of transport,
to be secured by S106 Legal Agreement.
Please refer to Conditions 4
(cycle parking), 8 (EVCP)
and 17 (construction
management and logistics
plan).
Please refer to Heads of
Terms nos. 2 (highways
improvement / healthy
streets contribution) and 3
(travel plan).
Air Quality Officer
The proposed development, located within the
LBH Air Quality Management Area and Hayes
Focus Area, does not meet air quality neutral
or positive standards as required by the
London Plan and LBH’s Air Quality Local
Action Plan.
Mitigation measures are necessary to reduce
emissions, with a calculated total cost of
£70,024 to offset the development’s impact.
This amount should be secured through a
Section 106 agreement to support air quality
improvements in the local area. Additionally,
no extra backup generators should be
deployed without separate planning approval.
No objection, subject to conditions and
contribution.
The Air Quality Officer
comments are noted.
Please see the ‘Summary of
Recommendation’ section of
this report for confirmation
that £70,024 is proposed to
be secured via a Section
106 legal agreement.
Please also refer to
Conditions 14 (low emission
zone for non-road mobile
machinery), 15 (low
emission strategy) 16
(reducing demolition and
construction emissions), 26
(generator emissions), 28
(cleanest backup generator
specifications) and 29
(testing and maintenance
regime annual hours).
Flooding and Drainage Specialist
The Flooding and Drainage Specialist raises
no objection, subject to conditions. At the
Discharge of Condition stage, the applicant
should investigate the potential for
incorporating rainwater harvesting on-site or
The Flooding and Drainage
Specialist comments are
noted.
Hillingdon Planning Committee – 12thMarch 2025
PART 1 – Members, Public & Press
provide justification for its non-inclusion.
Additionally, the applicant should provide the
proposed runoff volume for the 1 in 100 year,
6-hour storm event.
Matters relating to flood and
water management are
addressed in paragraphs
7.66 – 7.72 of this report.
Please also refer to
Conditions 3 (compliance
with supporting
documentation) and 21
(sustainable water
management).
Noise Specialist
The Noise Specialist raises no objection,
subject to conditions and informative.
Construction noise should consider flexible
working hours, especially near the mosque
and commercial properties. Operational noise
must not exceed 40 dB(A) between 2300-
0700 and 50 dB(A) between 0700-2300 at any
noise-sensitive premises, including places of
worship. Emergency equipment testing should
be coordinated with local premises. The
CEMP can be incorporated into the CMP
condition with aim to minimise noise impacts
during construction.
The Noise Specialist
comments are noted.
Matters relating to noise are
addressed in paragraphs
7.42– 7.46 of this report.
Please also refer to
Conditions 7 (noise rating
limits), 14 (construction
management and logistics
plan) and Informative 2
(noise levels and testing of
emergency equipment).
Contaminated Land Officer
The Contaminated Land Officer has no
objection but recommends a condition
requiring a contamination remediation scheme
(including asbestos) to be approved by the
LPA before development commences,
excluding demolition and initial ground works.
Any new contamination discovered must be
addressed with an updated scheme. A
verification report confirming remediation
completion must be submitted prior to
discharging the condition. Imported soils must
be tested for contamination.
The Contaminated Land
comments are noted.
Matters relating to land
contamination are
addressed in paragraphs
7.73 – 7.74 of this report.
Please also refer to
Condition 22 (contaminated
land).
Waste Strategy Officer
No comment/ objections
Noted.
Hillingdon Planning Committee – 12thMarch 2025
PART 1 – Members, Public & Press
Tree Officer
No concerns, subject to compliance with Tree
Survey demonstrating existing trees would be
retained on site.
Please refer to Condition 5
(trees to be retained).
7 Planning Assessment
Land Use Principles
Industrial Use
7.1 This application seeks permission to demolish an existing warehouse (Use Class
B8) and construct a two-storey data centre with plant at roof level, housing data
halls, plant rooms, office space, and a loading bay, alongside an external
compound with an emergency generator, ancillary structures, parking,
landscaping, and associated infrastructure. The principle of the proposed
development is inherently linked with the site's designation.
7.2 The application site is located within the Silverdale Road Industrial Area,
designated as a Strategic Industrial Location (SIL) in the Hillingdon Local Plan.
SILs are key locations for industrial, logistics, and digital infrastructure uses,
ensuring that such areas continue to support London's economic and
employment needs. Policy E4 of the London Plan recognises data centres as an
emerging industrial-type activity that falls within the broader B8 (storage and
distribution) classification, making the proposed use appropriate within this
designated SIL.
7.3 Policy E7 of the London Plan encourages the intensification of industrial land,
particularly in SILs, to optimise capacity while ensuring that existing industrial
functions are not compromised. While the proposal results in a marginal net
reduction in industrial floorspace, with the existing warehouse measuring
2,278.45 sq.m and the proposed data centre and ancillary structures measuring
1,914 sq.m, the high-value nature of data infrastructure justifies the change. The
modernisation and specialisation of the site ensure that it continues to serve an
industrial function while adapting to emerging technological needs, aligning with
strategic planning objectives.
Office Use
7.4 The proposal includes office floorspace to support the administrative and
operational requirements of the data centre. Policy E7 of the London Plan
generally resists standalone office development within SILs unless it is directly
ancillary to industrial or logistics functions.
7.5 Given the industrial designation of the site, it is necessary to ensure that the
office component remains subordinate to the primary data centre use. A planning
Hillingdon Planning Committee – 12thMarch 2025
PART 1 – Members, Public & Press
condition (Condition 9) would be imposed to restrict the use of office floorspace
to ensure that it remains ancillary to the data centre, thereby maintaining the
strategic industrial function of the site in accordance with the London Plan and
Hillingdon Local Plan policies.
Economy and Employment Use
7.6 The National Planning Policy Framework 2024 (NPPF)emphasises the
importance of economic growth, recognising technology and data infrastructure
as key drivers of productivity. This proposal strengthens the borough’s industrial
capacity, bringing long-term economic benefits.
7.7 The London Plan (2021) supports digital infrastructure as part of London’s
economic development. Policy E4 identifies data centres as suitable for Strategic
Industrial Locations (SILs), while Policy E7 encourages the modernisation of
industrial land to support technology-based employment.
7.8 The proposal wouldgenerate employment both during construction and
operation. While data centres may have a lower direct employment density than
other industrial uses, they support highly skilled jobs, including data
infrastructure management, cybersecurity, and maintenance roles. Additionally,
indirect employment through supply chain services, security, and specialist
contractors further enhances the economic benefits of the scheme. The
development is expected to contribute to local employment and skills
development, in line with Policy E11 of the London Plan (2021) and relevant
policies in the Hillingdon Local Plan.
7.9 Policy E11 of the London Plan (2021) states that development proposals should
support employment, skills development, apprenticeships, and other education
and training opportunities in both the construction and end-use phases, including
through Section 106 obligations where appropriate. In accordance with this, the
Council's Planning Obligations Supplementary Planning Document (2014)
requires that developments with estimated construction costs of over £2 million
and a construction period of three months or more deliver an in-kind employment
and training scheme or financial contributions towards training and employment
in the borough. An employment strategy and construction training scheme are
proposed to be secured by a Section 106 legal agreement.
7.10 Paragraph 85 of the NPPF (2024) states that significant weight should be placed
on the need to support economic growth and productivity. It is agreed that there
would be economic benefits arising from the proposed scheme and significant
weight is afforded to such benefits.
Energy Infrastructure
7.11 The NPPF (2024) emphasises the need for development to be supported by
appropriate infrastructure. Policy D2 of the London Plan requires consideration
to be given to the impact on local infrastructure capacity where planning
infrastructure capacity will be exceeded. Policy SI2 of the London Plan (2021)
Hillingdon Planning Committee – 12thMarch 2025
PART 1 – Members, Public & Press
requires major developments to demonstrate how energy infrastructure will be
integrated and supported. Given the substantial power demand associated with
data centres, the applicant has outlined a strategy to secure additional energy
capacity.
7.12 The proposal includes significant energy infrastructure requirements. The
proposed development would be powered by Scottish and Southern Electricity
(SSE) Networks through a new substation located at Silverdale Road, to the
northeast of the site. The connection would be provided at 11kV with a capacity
of up to 1,000 kVA at 50Hz.
7.13 A formal connection offer has been issued by SSE Networks (Reference Number
FBT206/1),confirming the ability to provide the necessary power for the
development. All electrical supplies would be distributed underground at 11kV
throughout the facility, ensuring a streamlined and reliable power supply. These
provisions ensure that the energy infrastructure for the development would be
robust and suitable to meet its operational requirements, supporting its long-term
sustainability.
7.14 In the unlikely event of a power loss, such as a temporary grid blackout, a 1.08
MW emergency back-up generator would automatically activate to maintain
power to essential systems until mains power is restored. Housed in an external
compound on the eastern side of the data centre, this generator ensures
continuous operations during grid outages, demonstrating that a reliable power
infrastructure is in place to support the development’s resilience. This is subject
to air quality considerations addressed in paragraphs 7.49 to 7.53 of this report.
7.15 The Council has continued to engage with the Greater London Authority's
Infrastructure Coordinate Service, who have been leading on the issue of West
London electricity capacity constraints. The relevant infrastructure providers are
continuing to deploy solutions to resolve capacity issues for residential and
mixed-use schemes in the short term. This has resulted in almost all the
residential schemes previously known to be stalled due to this issue having a
connection secured. Upgrades to the electricitytransmission network
serving West London remain planned to address the issue over the long-term.
The Greater London Authority continue to host an update on the issue of West
London Electricity Capacity Constraints on its website with full details of the latest
position (February 2025).
7.16 Therefore, the development has secured a power supply and would not
overburden the local grid capacity and is not considered to result in detrimental
impacts connected to energy infrastructure.
Conclusion
7.17 The proposal optimises the site for a future-proofed industrial use, in recognition
of the important role data centres play in economic and technological resilience.
It would ensure compatibility with surrounding industrial activities, particularly
with the ability of SILs to operate 24 hours a day. Planning obligations, including
Hillingdon Planning Committee – 12thMarch 2025
PART 1 – Members, Public & Press
commitments to employment and training, transport mitigation, and energy
infrastructure delivery, would ensure compliance with policy requirements.
Therefore, no issues are raised in principle, subject to these considerations and
the detailed assessment of the application in the following sections of this report.
Design
Impact on the Character and Appearance of the Area
7.18 Policies D3 of the London Plan (2021), BE1 of the Hillingdon Local Plan: Part 1
(2012), DMHB 11 and DMHB 12 of the Hillingdon Local Plan: Part 2 (2020) are
all directly relevant to the proposal. These policies can be read in full in the
Committee Report Part 3 - Policy Appendix, and in summary, seek to secure a
high quality of design that enhances and contributes to the area in terms of form,
scale and materials, is appropriate to the identity and context of the townscape
and would improve the quality of the public realm and respect local character.
These aims are also supported by the NPPF (2024) at chapter 12.
7.19 The existing site consists of hardstanding and a vacant single storey structure.
The site sits between Hillingdon Borough Mosque and an industrial unit, which
are to the west and east, respectively. To the south is the railway line and to the
north is Silverdale Road. The site sits within the designated SIL and is
characterised as such.
7.20 This proposed development involves the construction of a data centre building
(Use Class B8), along with several ancillary structures.
7.21 The proposed data centre, with a gross floor area of 1,914 sqm, aims to meet
the operational demands of modern data storage, while respecting the scale and
character of the surrounding industrial area. The building would be two-storey,
with plant located at roof level, and would feature a parapet height of
approximately 14.7 metres.
7.22 The site layout has been designed to ensure that the development remains
operationally efficient while maintaining appropriate boundary treatments for
security requirements. To this end, revisions were secured to revise boundary
treatments from palisade to weldmesh, balancing security requirements with
visual appearance. The proposal includes hard and soft landscaping elements,
including green walls which would help to soften the visual impact of the
development and provide a more cohesive integration with the surrounding
industrial landscape.
7.23 In terms of its design, the proposed data centre respects the overall character of
the area. While it introduces a building that is larger in scale compared to
surrounding structures, its modern industrial design and high-quality materials
ensure it would not be out of place within the context of the industrial estate.
Revisions were sought to raise the parapet by 1.54m to conceal plant equipment
at roof level to create a cleaner form. The development’s height and massing are
considered appropriate for this location.
Hillingdon Planning Committee – 12thMarch 2025
PART 1 – Members, Public & Press
7.24 The inclusion of PV panels to the proposed data centre building, is welcomed
and accords with the planning policy requirements for such proposals. It is noted
that these would not be visible from street level.
7.25 The building’s primary cladding would consist of light-coloured profiled metal
panels, chosen to blend with the sky and surrounding industrial buildings. This
material selection is consistent with the industrial nature of the area. The choice
of cladding and the streamlined form would contribute to the building’s
integration within the site and the broader industrial estate.
7.26 The ancillary buildings located at the front of the site wouldbe more visible from
the main approach to the site. These proposed structures are relatively small in
scale and the use of green walls help mitigate and soften it to ensure they do not
dominate the site or its surroundings.
7.27 The final material details are to be secured by Condition 18 to ensure the delivery
of a high-quality development.
7.28 The proposed development facilitates a reduction in hard landscaping and
vehicle parking and is a notable improvement on the existing scenario.
7.29 Therefore, in conclusion, the information submitted is considered to sufficiently
demonstrate that the development would not be harmful to the street scene and
would instead harmonise with the visual amenities of the area. Subject to
appropriately worded conditions, the development is considered to accord with
the requirements of Policy BE1 of the Hillingdon Local Plan: Part 1 (2012), Policy
DMHB 11 of the Hillingdon Local Plan: Part 2 (2020), Policy D3 of the London
Plan (2021), and the NPPF (2024).
Accessibility
7.30 Policy D5 of the London Plan (2021) states that development proposals should
achieve the highest standards of accessible and inclusive design.
7.31 The proposed development involves a data centre with associated facilities,
including car parking and landscaping. The Council’s Access Officer has
reviewed the proposal and confirmed that no significant accessibility issues have
been raised.
7.32 In line with the requirements of the Equality Act 2010, which requires service
providers to make reasonable adjustments to facilitate disabled access, it is
noted that the proposal should ensure accessibility both to and within the
building. An informative is recommended for inclusion with any grant of planning
permission to remind the applicant of their obligations under the Equality Act
2010, especially in eliminating barriers that may hinder disabled access.
Hillingdon Planning Committee – 12thMarch 2025
PART 1 – Members, Public & Press
Security
7.33 Policy DMHB 15 of the Hillingdon Local Plan: Part 2 (2020) states that the
Council will require all new development to ensure safe and attractive public and
private spaces by referring to the Council's latest guidance on Secured by
Design principles. This is supported by Policy D11 of the London Plan (2021).
A secured by design condition has been recommended to achieve appropriate
accreditation. Subject to Condition 12, the proposal would accord with Policy
DMHB 15 of the Hillingdon Local Plan: Part 2 (2020) and Policy D11 of the
London Plan (2021).
Fire Safety
7.34 Policy D12 of the London Plan (2021) states that all major development
proposals should be submitted with a Fire Statement, which is an independent
fire strategy, produced by a third party, suitably qualified assessor. The
statement should detail how the development proposal will function in fire safety
terms.
7.35 A Fire Statement has been submitted which demonstrates consideration of fire
safety principles early in the development process. The London Fire Brigade
have not raised any specific objections but have advised that the development
should accord with Building Regulation requirements. This is proposed to be
secured by Condition 24. Subject to this condition, the proposed would accord
with the requirements of Policy D12 of the London Plan (2021).
Heritage
7.36 The application site is not subject to a Conservation Area designation and does
not contain any heritage assets, including statutory listed buildings or locally
listed buildings. The proposal is also not considered to adversely impact the
setting of the Grade II Listed Benlow Works Building, located over 100m to the
west of site.
Neighbouring Amenity
Impact on Neighbours
7.37 Policy DMHB 11 of the Hillingdon Local Plan: Part 2 (2020) states that
development proposals should not adversely impact on the amenity, daylight and
sunlight of adjacent properties and open space.
7.38 Given the location of the site, there are no residential properties nearby.
However, the site sits between Hillingdon Borough Mosque and an industrial
unit, which are to the west and east of the site, respectively. To the south is the
railway line and to the north is Silverdale Road.
Hillingdon Planning Committee – 12thMarch 2025
PART 1 – Members, Public & Press
7.39 The two-storey mosque located to the west of the proposed development.
Recent alterations to the ground floor, including an entrance lobby (approved
under planning permission ref. 39396/APP/2022/2561), have been made. The
submitted BRE Report indicates that non-habitable spaces, such as the entrance
lobby, do not require daylight and sunlight testing. Based on the drawings from
the local planning authority, daylight studies (VSC and DD methods) show
minimal impact on windows and rooms, ensuring compliance with BRE criteria
for daylight. Similarly, the sunlight study (APSH) confirms all assessed windows
wouldmeet the BRE Report’s sunlight amenity requirements.
7.40 It is acknowledged that the proposed parapet height has been raised marginally
(1.54m), however, given the results of the BRE Daylight/Sunlight Report, it is
considered that this would not have a significant impact on the results.
7.41 Taking into consideration the BRE Report, thesiting and extent of development
proposed, it is not considered likely that the redevelopment of the site as
presented would impact the privacy of neighbouring occupiers or the receipt of
daylight and sunlight to adjacent properties. Noise, vibration, dust and lighting
impacts are addressed in paragraphs 7.42 to 7.46 below.
Environmental Issues
Noise, Vibration, Dust and Lighting
7.42 Policy D14 of the London Plan (2021) states that development should reduce,
manage and mitigate noise to improve health and quality of life. This can be done
by separating noise generating uses from noise sensitive uses. Mitigation can
also be secured through screening, layout, orientation, uses and materials. This
is supported by Policy EM8 of the Hillingdon Local Plan: Part 1 (2012).
7.43 The Council’s Noise Specialist has confirmed that there is no objection, subject
to appropriate conditions.For operational noise, the applicant has provided
sufficient information. It is recommended that noise limits are secured by
Condition 7.
7.44 A flexible approach to construction working hours, in collaboration with the
mosque and nearby commercial premises, is recommended. The routine testing
of emergency equipment, including generators, should also be scheduled in
agreement with nearby sensitive premises (Informative 2).
7.45 A Construction Management Plan would be requiredto show how noise impacts
would be minimised during the construction phase. This would include
agreements on working hours with affected premises, including places of
worship. This would be secured by Condition 17.
7.46 Therefore, subject to conditions, the development would accord with Policy EM8
of the Hillingdon Local Plan: Part 1 (2012), Policy DMHB 11 of the Hillingdon
Local Plan: Part 2 (2020) and Policy D14 of the London Plan (2021).
Hillingdon Planning Committee – 12thMarch 2025
PART 1 – Members, Public & Press
Odour
7.47 Policy EM8 of the Hillingdon Local Plan: Part 1 (2012) states that the Council will
seek to safeguard and improve all land, water, air and noise quality.
7.48 It is noted that paragraph 201 of NPPF (2024) states that the focus of planning
decisions should be on whether proposed development is an acceptable use of
land, rather than the control of processes or emissions (where these are subject
to separate pollution control regimes). Planning decisions should assume that
these regimes will operate effectively.
Air Quality
7.49 Policies SI 1 of the London Plan (2021), EM8 of the Hillingdon Local Plan: Part
1 (2012) and DMEI 14 of the Hillingdon Local Plan: Part 2 (2020) are all directly
relevant to the proposal. These policies can be read in full in the Committee
Report Part 3 - Policy Appendix. In summary, thesse seek to safeguard and
improve air quality in order to protect existing and new sensitive receptors. These
aims are also supported by the NPPF (2024) at chapter 15.
7.50 The proposed development is located within the LBH Air Quality Management
Area, and the Hayes Focus Area where additional emissions may exacerbate
existing poor air quality.
7.51 According to the London Plan, developments must be air quality neutral at
minimum, with LBH requiring air quality positive contributions in Focus Areas as
per the LBH Air Quality Local Action Plan 2019-2024. Policy DMEI 14 of the
emerging Hillingdon Local Plan (Part 2) further supports this, emphasizing the
need for contributions to local air quality improvement.
7.52 The proposed data centre (Class B8), including an emergency generator and
associated flue, is not air quality neutral or positive, as required. Therefore,
mitigation measures are necessary to reduce the impact of emissions.
7.53 I n accordance with the LBH Local Action Plan, the total emissions associated
with the development must be mitigated. The level of required mitigation for the
operational phase, calculated using Defra's Damage Cost Approach, amounts
to £70,024. This would be secured via a S106 agreement to ensure the
development meets the necessary air quality standards, alongside Condition 16
for the reduction of emissions during construction, a low emissions strategy and
zone (Conditions 14 and 15), and generator fuel, testing and maintenance
conditions (Conditions 27, 28 and 29). Subject to this obligation and conditions,
the development would accord with Policy EM8 of the Hillingdon Local Plan: Part
1 (2012), Policy DMEI 14 of the Hillingdon Local Plan: Part 2 (2020), Policy SI 1
of the London Plan (2021) and the NPPF (2024).
Hillingdon Planning Committee – 12thMarch 2025
PART 1 – Members, Public & Press
Trees and Landscaping
7.54 Policies G1 and G5 of the London Plan (2021), DMEI 1, DMHB 11 and DMHB
14 of the Hillingdon Local Plan: Part 2 (2020) are all directly relevant to the
proposed development. These policies can be read in full in the Committee
Report Part 3 - Policy Appendix. In summary, these policies seek to safeguard
existing trees and deliver high quality landscaping in order to enhance amenity,
biodiversity and green infrastructure. These aims are also supported by the
NPPF (2024) at chapter 12.
7.55 With regard to landscaping, it is acknowledged that the proposals would commit
to a significant improvement in soft landscaping and planting. The details of the
boundary treatments would be secured under Condition 20. Revisions have
secured weldmesh fencing instead of palisade fencing.
7.56 The Arboricultural Impact Assessment submitted confirms the retention of trees
on site. All trees are to be retained and protected. Further, the proposed site plan
submitted commits to the planting of new trees.
7.57 The final details of hard and soft landscaping are proposed to be secured by
Condition 20 to ensure that the landscape scheme to be delivered is high quality
and retained in the long term. Subject to this condition, the proposal would
accord with Policies DMHB 11 and DMHB 14 of the Hillingdon Local Plan: Part
2 (2020).
Biodiversity
7.58 The Environment Act 2021 has established that all planning permissions granted
in England have to deliver at least 10% BNG from January 2024. Paragraph 187
of the NPPF (2024) also states that planning decisions should contribute to and
enhance the natural and local environment by: d) minimising impacts on and
providing net gains for biodiversity, including by establishing coherent ecological
networks that are more resilient to current and future pressures. This is
supported by Policy G6 of the London Plan (2021) and Policy DMEI 7 of the
Hillingdon Local Plan: Part 2 (2020).
7.59 The existing site comprises entirely the existing warehouse and hardstanding.
The submitted Preliminary Ecological Appraisal, prepared by E3P, confirms that
the sealed tarmac surface of the site only has small areas of colonisation.
Overall, no habitat with biodiversity value, and no priority or linear habitats were
identified within the site boundary. Additionally, much of the surrounding area
comprising further industrial units and associated hardstanding, all of which are
anticipated to provide minimal ecological value.
7.60 In line with The Biodiversity Gain Requirements (Exemptions) Regulations 2024,
any sites with less than 25 m2 of on-site habitat that has biodiversity value
greater than zero are exempt from Biodiversity Net Gain. Since the site is
exclusively developed land including the building and hardstanding with no
biodiversity value/habitat units, a Biodiversity Net Gain report will not be
required.
Hillingdon Planning Committee – 12thMarch 2025
PART 1 – Members, Public & Press
7.61 The proposal is considered to accord with the NPPF (2024), Policy G6 of the
London Plan (2021) and Policy DMEI 7 of the Hillingdon Local Plan: Part 2
(2020).
Urban Greening Factor
7.62 Policy G5 of the London Plan (2021) states that major development proposals
should contribute to the greening of London and that the target score for
commercial development is 0.3.
7.63 In line with Policy G5 of the London Plan (2021), major development proposals
are expected to contribute to the greening of London. The applicant should
maximise greening opportunities on the site.
7.64 The landscape strategy has been carefully scrutinised, including the review of
the development and its ancillary structures, along with tracking plans to ensure
that all hard standing areas are essential. As a result, the scheme optimises the
potential for urban greening.
7.65 The proposed development achieves an Urban Greening Factor (UGF) score of
0.146, which, although below the target of 0.3 for commercial developments,
demonstrates a meaningful contribution to greening. This factor, along with the
development's efforts to maximise landscaping, is considered positively in the
overall planning balance.
Flood Risk
7.66 The application site is location in Flood Zone 1, meaning that the site is at very
low risk of fluvial flooding. The proposed commercial use is considered to fall
under the ‘less vulnerable’ classification. Accordingly, the proposal is appropriate
in this location. The development is considered to accord with Policy SI 12 of the
London Plan (2021), Policy EM6 of the Hillingdon Local Plan: Part 1 (2012) and
Policy DMEI 9 of the Hillingdon Local Plan: Part 2 (2020).
Drainage
7.67 Policy SI 13 of the London Plan (2021) also requires that development proposals
utilise sustainable urban drainage systems (SuDS) unless there are practical
reasons for not doing so. It further states that development proposals should aim
to achieve greenfield run-off rates and ensure that surface water run-off is
managed as close to its source as possible. This is supported by Policy EM6 of
the Hillingdon Local Plan: Part 1 (2012) and Policy DMEI 10 of the Hillingdon
Local Plan: Part 2 (2020).
7.68 The proposed development would remove some impermeable hardstanding and
replace it with soft landscaping, resulting in a net benefit to drainage. A below-
ground attenuation tank and two raingardens are proposed. The Council's
Flooding and Drainage Specialist has confirmed no objection to the proposed
drainage strategy, subject to the necessary planning conditions.
Hillingdon Planning Committee – 12thMarch 2025
PART 1 – Members, Public & Press
7.69 Conditions 21 and 30have been recommended to secure the final details and
implementation of the drainage scheme. Subject to these conditions, the scheme
would accord with Policy EM6 of the Hillingdon Local Plan: Part 1 (2012), Policy
DMEI 10 of the Hillingdon Local Plan: Part 2 (2020) and Policy SI 13 of the
London Plan (2021).
Water Infrastructure
7.70 Policy SI 5 of the London Plan (2021) states that all major developments should
incorporate measures to reduce water use, ensure there is sufficient wastewater
infrastructure capacity, and minimise the risk of misconnections between the foul
and surface water networks. This includes adopting water-saving technologies
and ensuring proper management of wastewater infrastructure.
7.71 During the consultation process, Thames Water has confirmed no objection to
the proposed development in respect of wastewater network and sewage
treatment works.
7.72 Drainage has been addressed in paragraphs 7.67 – 7.69. Therefore, subject to
Conditions 21 and 30, the proposed development would accord with Policy SI 5
of the London Plan (2021).
Land Contamination
7.73 Policy DMEI 12 of the Hillingdon Local Plan: Part 2 (2020) statesthat
development on potentially contaminated sites shall assess conditions and
demonstrate that the site can be safely remediated. Planning conditions and
S106 legal agreements can be used to secure the appropriate level of detail
required.
7.74 A phase 1 contaminated land study has been submitted for consideration and is
considered sufficient and acceptable for the initial stage of the planning process.
Condition 22 is proposed to secure further details of a remediation strategy.
Subject to such a condition, the proposal is not considered contrary to Policy
DMEI 12 of the Hillingdon Local Plan: Part 2 (2020).
Transport
7.75 Policies T4, T6, T6.2 of the London Plan (2021), DMT 1 and DMT 2 of the
Hillingdon Local Plan: Part 2 (2020) are all directly relevant to the proposed
development. These policies can be read in full in the Committee Report Part 3
- Policy Appendix. In summary, these policies seek to deliver development which
is sustainable in transport terms and safeguards highway and pedestrian safety.
These aims are also supported by the NPPF (2024) at chapter 9, including
paragraph 116 of the NPPF (2024) which states that development should only
be prevented or refused on highways grounds if there would be an unacceptable
impact on highway safety, or the residual cumulative impacts on the road
network would be severe.
Hillingdon Planning Committee – 12thMarch 2025
PART 1 – Members, Public & Press
Proposed Operation
7.76 The site is located within Silverdale Industrial Estate, Hayes, and is accessible
via a spur road off Silverdale Road, which connects to Pump Lane. Silverdale
Road is a no-through route and serves only commercial and industrial units. The
site is approximately 850 metres from Hayes and Harlington Station, which
provides access to the Elizabeth Line. Public transport accessibility is limited, as
reflected by the site’s low PTAL rating.
7.77 The proposal seeks full planning permission for the redevelopment of Unit 4,
Silverdale Industrial Estate, Hayes, to provide a data centre development (Use
Class B8). The site currently comprises a vacant warehouse with associated
hardstanding, access lanes, and a small service yard. The proposal includes the
demolition of existing buildings and the construction of a new data centre.
7.78 The proposed data centre would replace a vacant warehouse and is expected
to generate fewer vehicle trips than the existing land use. The site would employ
8–11 staff, working in shifts (07:00–19:00 for day shifts and 19:00–07:00 for night
shifts), ensuring staff movements fall outside peak hours. Visitor and
maintenance trips would take place between 08:00–15:00.
Staff and Visitor Car Parking
7.79 Policy T6.2 of the London Plan (2021) states that car parking provision at Use
Classes Order B2 (general industrial) and B8 (storage or distribution)
employment uses should have regard to these office parking standards and take
account of the significantly lower employment density in such developments.
7.80 Policy T6.2, Table 10.4, of the London Plan (2021) outlines car parking
requirements for Class B8 as follows:
- Outer London Opportunity Areas - Up to 1 space per 500m2 gross internal area
(GIA)
- Outer London - Up to 1 space per 100m2 (GIA)
7.81 Vehicular access to the site would be provided via a separate in/out
arrangement, linking to the access road and Silverdale Road. A loading bay is
proposed on the northern frontage and swept path analysis confirms that a 10-
metre rigid HGV can enter and exit in a forward gear. Deliveries would be
scheduled to avoid congestion, and site access would not be obstructed by
parked vehicles.
7.82 A total of eight car parking spaces are proposed, including one disabled bay.
This is within the maximum London Plan standards and Hillingdon’s parking
requirements, which allow for a maximum of 19–36 spaces. A lower provision is
considered appropriate given the shift-based working patterns and aligns with
the Mayor’s Transport Strategy to encourage sustainable transport use.
Furthermore, the forecast staff numbers set out earlier in this section indicates
that parking demand would be lower than a typical B8 development.
Hillingdon Planning Committee – 12thMarch 2025
PART 1 – Members, Public & Press
Disabled Person Car Parking
7.83 Policy T6.5, Table 10.6, of the London Plan (2021) states that 5% of all car
parking spaces should be provided as designated disabled persons parking bays
and 5% should be provided as enlarged parking bays which are capable of being
converted to disabled persons parking. This would require the provision of 1no.
disabled persons parking bays.
7.84 The development proposes 1no. disabled persons parking bay. This is accepted
and secured by Condition 2.
Electric Vehicle Charging Points (EVCPs)
7.85 Policy T6 of the London Plan (2021) states that new developments with car
parking should make provision for electric vehicles or other Ultra-Low Emission
vehicles.
7.86 Policy T7 of the London Plan (2021) states under point (B)(3) that development
should provide rapid charging points for freight vehicles. In support of this, Policy
T6.2 of the London Plan (2021) states under point (F) that all operational parking
must provide infrastructure for electric or other Ultra-Low Emission vehicles.
7.87 A total of 3no. active EVCPs are proposed to be provided to serve staff and
visitor car parking. The remaining 5no. staff and visitor spaces would be provided
with passive electric vehicle charging infrastructure. This is accepted and is
secured by Condition 8.
Cycle Parking
7.88 The published London Plan (2021) Table 10.2 - Minimum Cycle Parking
Standards requires that B8 developments provide 1no. long stay secure and
undercover cycle parking space per 500m2 and 1no. short stay secure cycle
space per 1000m2. This requires that at least 3no. long stay and 2no. short stay
cycle parking spaces are provided.
7.89 A cycle store with five Sheffield stands (providing ten cycle parking spaces) is
proposed at the western extent of the site which is secure and sheltered. There
would be natural surveillance of the cycle parking due to parking being near the
building entrances. This is accepted and is to be secured by Condition 4.
Trip Generation
7.90 The proposed redevelopment would result in a reduction in vehicle trips during
the peak hours at the site when compared to the existing land use and floor area.
Therefore, the development proposals would not result in a significant
detrimental impact on the operation of the local highway network.
Hillingdon Planning Committee – 12thMarch 2025
PART 1 – Members, Public & Press
Vehicle and Pedestrian Access
7.91 Vehicular access to the site is proposed via a separate in/out arrangement onto
the adjacent access road. In turn, the site retains wider access via a bellmouth
junction with Silverdale Road to the north.
7.92 The site would comprise an internal service yard, which wouldbe provided with
car parking along its western extent. A single dedicated loading bay would be
provided on the northern frontage of the data centre, which would accommodate
any deliveries by HGVs. Deliveries would be infrequent and scheduled in
advance and therefore HGVs would not block access for other site vehicles. The
accompanying Outline Delivery and Servicing management Plan (DSMP) sets
out the principles which would be in place to manage deliveries, with details to
be secured by Condition 25.
7.93 Swept path analysis, demonstrates that a 10-metre rigid can access and egress
the site in a forward gear, utilising the loading bay provided. Furthermore, the
drawing shows that a car is able to pass an HGV waiting within the loading bay,
indicating that deliveries and servicing would not prevent access to the site.
Highways Improvement (Healthy Streets Contribution)
7.94 To reduce reliance on private car use and provide genuine travel choices for
those working at and visiting the site, a developer contribution of £29,700 is
required, secured by a Section 106 legal agreement. This may fund key transport
improvements along routes to Lidl supermarket, Hayes and Harlington Station,
and the Grand Union Canal Cycle Quietway. The improvements could include
tactile paving at key junctions and footway enhancements, as well as the
installation of new street furniture and trees. These measures are necessary to
mitigate the risk of on-street parking and traffic disruption, in accordance with
London Plan Policies T4 and T2. The contribution wouldsupport sustainable
travel options and enhance pedestrian safety in the area.
Travel Plan
7.95 A detailed and finalised Travel Plan is