Read the text of this document (93 pages)
Hillingdon Planning Committee – 09.04.2025
PART 1 – Members, Public & Press
Report of the Head of Development Management and Building Control
Committee Report
Case Officer: Alan Corcoran 78696/APP/2024/867
Date Application
Valid:
02.05.2024 Statutory / Agreed
Determination
Deadline:
30.05.2025
Application
Type:
Full Ward: Uxbridge
Applicant: DNA Uxbridge Ltd
Site Address: 148 – 154 High Street, Uxbridge
Proposal: Demolition of existing buildings and construction
of a mixed -use development comprising a hotel
(Use Class C1), residential co -living
accommodation ( Use Class Sui Generis), and
commercial floorspace ( Use Class E) and
ancillary work, including public realm
improvements, a new pocket park, basement
parking, and associated infrastructure.
Summary of
Recommendation:
GRANT planning permission subject to section
106 legal agreement and conditions
Reason Reported
to Committee:
Required under Part 1 of the Planning Scheme of
Delegation (Major application recommended for
approval)
Hillingdon Planning Committee – 09.04.2025
PART 1 – Members, Public & Press
Summary of Recommendation :
GRANT planning permission subject to the completion of a
satisfactory section 106 legal agreement to secure the heads of
terms set out below, and subject to the conditions as set out in
Appendix 1.
Section 106 Legal Agreement Heads of Terms:
It is recommended that delegated powers be given to the Director of Planning and
Sustainable Growth to grant planning permission subject to the following:
1. That the application be referred back to the Greater London Authority.
2. That should the Mayor not issue a direction under Article 7 of the Order that
he is to act as the Local Planning Authority for the purposes of determining the
application, delegated powers be given to the Director of Planning and
Sustainable Growth to approve this application subject to:
A) That the Council enter into a legal agreement with the applicant under Section
106 of the Town and Country Planning Act 1990 (as amended) or any other
legislation to secure the following:
1. In lieu affordable housing contribution of £3,618,409. The S106 agreement shall
include an Early and Late-Stage Viability Review mechanism.
2. Air Quality Mitigation contribution of £88,533.
3. A Carbon Offset contribution of £276,260.
4. London Healthy Urban Development Unit (HUDU) financial contribution of
£414,307 to fund enhanced or new health facilities within the London Borough of
Hillingdon.
5. An Employment/Construction Training Scheme secured in accordance with the
Council's Planning Obligations SPD.
6. Residential Parking Permits restriction (excluding Blue Badge holders).
7. A Healthy Streets/Active Travel Zone contribution of £61,996 within the London
Borough of Hillingdon .
8. A £4,500 contribution towards implementing traffic orders within the London
Borough of Hillingdon .
9. A £105,000 contribution to Transport for London (TfL) towards measures to
improve the bus infrastructure and waiting environment within the London Borough
of Hillingdon.
10. A Section 278 Agreement to implement the proposed off-site Highways Works,
including (but not limited to) York Stone paving and installation of street trees, on
Bakers Road, Belmont Road, High Street (the full width of the pedestrianised area
of the Hi gh Street between Belmont Road and Cocks Yard but excluding the
existing tegula block paving), and Cocks Yard.
11. A Section 38 Agreement to transfer land in front of the building line on Belmont
Road (not under colonnade) and Bakers Road to Hillingdon Council.
12. Public Square to remain publicly accessible in perpetuity .
Hillingdon Planning Committee – 09.04.2025
PART 1 – Members, Public & Press
13. ‘Be Seen’ post-construction energy monitoring to be carried out in accordance
with the GLA ‘Be Seen’ Energy Monitoring Guidance London Plan Guidance
Documents (2021).
14. A replacement delivery loading bay within Bakers Road shall be agreed with
the Council in consultation with Transport for London and implemented by the
developer on Bakers Road prior to the removal of the existing Bakers Road delivery
loading bay.
15. A Section 247 stopping up order agreement for the developer to take ownership
and ongoing maintenance of the public access through Cocks Yard , to secure
continued public access between Bakers Road and the High Street and associated
management and maintenance.
16. A town centre public car park season ticket restriction .
17. A Project Management and Monitoring Fee, equalling 5% of the total financial
contributions to be paid under this agreement.
B) That in respect of the application for planning permission, the applicant meets
the Council's reasonable costs in preparation of the Section 106 Agreement and
any abortive work as a result of the agreement not being completed.
C) That officers be authorised to negotiate and agree the detailed wording of the
heads of terms, the proposed Legal Agreement and conditions of approval.
D) That, if the Legal Agreement has not been finalised within 6 months (or such
other time frame as may be agreed by the Director of Planning and Sustainable
Growth), delegated authority be given to the Director of Planning and Sustainable
Growth to refuse planning permission for the following reason:
'The applicant has failed to mitigate the impacts posed by the proposed
development (in respect of affordable housing, air quality, carbon offsetting, health,
employment/construction training, Highway s safety, sustainable t ravel, public
access, energy monitoring, parking restrictions and public access ). The scheme
therefore conflicts with Policies DMCI 7 of the Hillingdon Local Plan: Part 2 (2020);
the adopted Planning Obligations Supplementary Planning Document (2014);
Policy DF1 of the London Plan (2021); and paragraphs 56 -58 of the National
Planning Policy Framework (2024).'
E) That if the application is approved, that the permission is subject to the
Conditions as set out in Appendix 1.
1 Executive Summary
1.1 The Site is within the Uxbridge Metropolitan Town Centre, Primary Shopping Area
(Uxbridge), and Office and Hotel Growth Location (Uxbridge Town Centre)
designations. Policy SA 26 of Hillingdon Local Plan: Part 2 - Site Allocations and
Designations (2020) also designates the Site for 'New Homes', stating 'The site is
considered suitable for residential -led mixed-use development.'
1.2 The proposal consists of the demolition of the existing three-storey development
that contains 1,524 sq. m. of office floor space (Use Class E), 3,582 sq. m. of retail
Hillingdon Planning Committee – 09.04.2025
PART 1 – Members, Public & Press
accommodation (Use Class E ), 258 sq. m. of residential use (Use Class C3 ), and
130 basement car parking spaces. Following demolition, the Applicant proposes
the construction of a mixed -use development comprising 320 co-living units (Use
Class Sui Generis), 162-bedroom hotel (Use Class C1), and 1,115 sq. m. ground
floor commercial floorspace (Use Class E) and ancillary work, including public
realm improvements, a new pocket park, basement parking, and associated
infrastructure. The development would be approximately 21,000 sq. m. and would
range in height from eight to ten storeys.
1.3 The principle of development is supported. The building’s height, scale, and mass
are appropriate for its town centre location at a highly accessible (Public Transport
Accessibility Level – PTAL – 6a) public transport interchange. The Council has
worked with the Applicant to refine the development’s design during pre-application
and the full planning application process, securing floor plan and site/landscape
amendments, high -quality external materials , and architectural detailing. The
proposed development would cause less than substantial harm to the neighbouring
Conservation Area and nearby Listed Buildings , but the public benefits of the
proposed scheme would outweigh this. The quality of co -living accommodation
complies with The London Plan and London Plan Guidance. Whilst the proposal
would have some impact upon neighbouring amenity, on balance, the identified
overshadowing impact would not be so significant as to justify a refusal of planning
permission. The Council’s Highways Team, the G reater London Authority , and
Transport for London support the car-free (except for nine disabled person parking
spaces in the basement) nature of the proposed development and raise no
highways objections , subject to the recommended conditions and legal agreement
heads of terms, which are included in this recommendation .
1.4 One comment of support, nine objections, and three neutral comments have been
received from members of the public. These are duly addressed in this
assessment.
1.5 The proposal has been assessed in accordance with the development plan, whilst
it is noted that there are some shortfalls in compliance this is not unusual for a
major scale development. The proposal would result in some harm however
Officers consider the harm to be limited. Paragraph 11 of the NPPF 2025
recognises the challenges developments will have in achieving compliance with the
development plan in its entirety and encourages a balanced approach to be taken
to weighing the benefits of the proposal against the harm identified. In this case the
proposal would bring forward the regeneration of a corner of the high street, further
enhancing the vitality of this area and the Town Centre as whole. This would result
in employment retention, the optimisation of a brownfield site to provide a
contribution towards local housing stock, an affordable housing contribution and
the delivery of a new public square. All of these benefits are considered to outweigh
the limited harm identified by Officers and as such the proposal would accord with
paragraph 11 of the NPPF.
On balance, the proposal is acceptable and would be consistent with the
overarching aims of the National Planning Policy Framework, The London Plan,
and Hillingdon Local Plan.
Hillingdon Planning Committee – 09.04.2025
PART 1 – Members, Public & Press
1.6 The planning application is therefore recommended for approval , subject to the
conditions contained in Appendix 1 , the Section 106 Heads of Terms detailed
above, and Stage II referral to the Greater London Authority.
2 The Site and Locality
2.1 The 0.38-hectare application Site (148 -154 High Street) is located on a prominent
plot fronting a pedestrianised section of Uxbridge High Street to the west, Belmont
Road to the north, Bakers Road to the east, and Cocks Yard (a pedestrian route
connecting Bakers Road and High Street ) to the south.
2.2 The existing three-storey building comprises approximately 1,524 sq. m. of office
floor space and 3,582 sq. m. of retail accommodation (Use Class E). Retail units
include Greggs, WH Smith, Post Office, Oxfam, Card Factory, and The Carpet
Centre. It also contains 258 sq. m. of residential use (Use Class C3). A service yard
occupies the centre of the Site, with access to a public basement car park available
from Baker's Road, comprising 130 parking spaces.
2.3 The Site is within the Uxbridge Metropolitan Town Centre, Primary Shopping Area
(Uxbridge), and Office and Hotel Growth Location (Uxbridge Town Centre)
designations. Policy SA 26 of Hillingdon Local Plan: Part 2 - Site Allocations and
Designations (2020) also designates the Site for 'New Homes', stating 'The site is
considered suitable for residential -led mixed-use development.'
2.4 The Site is within an Air Quality Management Area and an Air Quality Focus Area.
It is also within the wider Uxbridge Archaeological Priority Area (APA) and
Potentially Contaminated Land area. It is in Flood Zone 1 (lowest flood risk) and is
not within a C ritical Drainage Area. Surface Wa ter Flooding impacts a small
(approximately 170 sq. m.) area towards the centre of the Site.
2.5 There are no listed buildings on the Site, and it is not within a Conservation Area
or Area of Special Local Character (ASLC). Notwithstanding, the Site is within the
wider Uxbridge Archaeological Priority Area (APA) and between a two-part
Conservation Area (Old Uxbridge/Windsor Street ). The Conservation Area is
approximately 13 metres to the north and south of the Site. There are several Listed
Buildings within the Conservation Area, and three War Memorials are located within
75 metres of the Site. North Uxbridge ASLC is approximately 130 metres north of
the Site.
2.6 The Site has a Public Transport Accessibility Level (PTAL) of 6a, where a score of
0 indicates very poor access to public transport and 6 indicates excellent access.
Notably, Uxbridge London Underground station is approximately 50 metres
southeast of the Site, and commuters can access it from Bakers Road. It provides
access to the Metropolitan and Piccadilly lines. Additionally, there are several bus
stops on Belmont Road and Bakers Road.
2.7 The Pavilions, on the opposite side of the High Street to the west, contain s
residential units above retail. This building is up to eight storeys in height. To the
east, on the opposite side of Bakers Road, are several large properties comprising
residential, office, and hotel uses. These buildings vary between five and nine
Hillingdon Planning Committee – 09.04.2025
PART 1 – Members, Public & Press
storeys in height . To the north, on the opposite side of Belmont Road, is a two to
three-storey terrace used as a bank and a restaurant. To the south is 155-162 High
Street, a three -storey block containing several large retail units and a fast -food
restaurant. Beyond that is Market Square and Uxbridge Underground Station.
Figure 1: Location Plan (application site edged red)
Figure 2: Aerial View of the Application Site
Hillingdon Planning Committee – 09.04.2025
PART 1 – Members, Public & Press
Figure 3: Street View Images of the Application Property
Junction of Bakers Road and Belmont Road
Hillingdon Planning Committee – 09.04.2025
PART 1 – Members, Public & Press
Bakers Road
Belmont Road
Hillingdon Planning Committee – 09.04.2025
PART 1 – Members, Public & Press
High Street
Cocks Yard (a pedestrian route connecting Bakers Road and High Street)
3 Proposal
Hillingdon Planning Committee – 09.04.2025
PART 1 – Members, Public & Press
3.1 The proposal consists of the demolition of the existing buildings and construction
of a mixed-use development comprising a hotel (Use Class C1), residential co -
living accommodation (Sui Generis), and commercial floorspace (Use Class E) and
ancillary work, including public realm improvements, a new pocket park, basement
parking, and associated infrastructure.
3.2 The development would range in height from eight to ten storeys, over basement
and have a gross internal floor area of approximately 21,000 sq. m.
3.3 The proposed development would create a new public open space measuring
approximately 2,070 sq. m. located at the site’s centre. It would deliver new and
improved pedestrian links between the surrounding streets and provide additional
publicly accessible planting, seating, and outdoor amenity space.
3.4 The proposed co-living development would deliver 320 new homes (Use Class Sui
Generis), provided as private studios measuring between 19 and 24 sq. m. and
private wheelchair -accessible studios measuring between 31 and 36 sq. m. Ten
percent of the proposed homes (32 units) would be wheelchair -accessible.
3.5 The Applicant proposes a living -kitchen-diner communal space in the northeast
corner of each floor of the co -living development that has accommodation . The
provision equates to 0.8 sq. m. of kitchen space per resident and four dining spaces
per cooking station. Further, internal co-living amenity space would be provided on
the ground floor at the junction of Belmont Road and Bakers Road. Other ancillary
co-living amenity spaces, including a gym, cinema room, and co -working spaces
are proposed in the basement. The proposed develop ment would deliver an
average amenity provision of 4.1 sq. m. per resident. E xternal amenity space is
proposed on the roof fronting Belmont Road, providing an additional two sq. m. of
external amenity space per resident. The main entrance into t he co-living
development would be at the corner of Belmont Road and Bakers Road.
3.6 The proposed hotel (Use Class C1) would comprise 162 hotel bedrooms. It would
also include an ancillary office, kitchen, bar, storage areas, and an external terrace
for guests to use. The hotel would be accessed from the corner of Belmont Road
and High Street via an access-controlled doorway with lifts and stair leading to the
eight-floor hotel reception area.
3.7 The proposed development would also provide 1,115 sq. m. of commercial
floorspace (Use Class E) along the ground floor of High Street and Belmont Road.
It would have a double -height frontage and incorporate a mezzanine level.
3.8 The building’s external material would consist mainly of brick . The Bakers Road
block would be finished in a brown clay brick (by European Building Materials –
Purple Ash variant). The ground and first floor of the Bakers Road block would be
finished in a white brick (by Wienerberger – Thorne White variant). The eighth floor
set-back of the Bakers Road block would be finished in Standing Seam Zinc
Cladding (by VMZinc – Storm Grey variant). The Belmont Road block would be a
red clay brick (by Vandersanden – Azalea variant). The hotel would be finished in
textured and smooth GRC composite cladding (by Rieder – cotton matt variant and
Hillingdon Planning Committee – 09.04.2025
PART 1 – Members, Public & Press
cotton ferro variant). Lastly, the pedestrian passageways would be clad in white
tiles (by Ibstock – White WT-10 variant).
3.9 Vehicular access on Bakers Road to basement parking would be retained, though
it would be redesigned and repositioned . The basement car park would have nine
disabled person car parking spaces (four for the co-living use and five for the hotel
use). There would also be 263 long-stay cycle parking spaces in the basement.
Twenty-four additional short-stay cycle parking spaces would be publicly
accessible at ground level on High Street, Belmont Road, and Cocks Yard.
Figure 4: Proposed Plan (please note – larger version of plan can be found in the
Committee Plan Pack)
Proposed Site Plan
Hillingdon Planning Committee – 09.04.2025
PART 1 – Members, Public & Press
Proposed Co-Living - Bakers Road Elevation
Proposed Co-Living and Retail – Belmont Road Elevation
Hillingdon Planning Committee – 09.04.2025
PART 1 – Members, Public & Press
Proposed Hotel and Retail – High Street Elevation
Proposed Planting Strategy
Hillingdon Planning Committee – 09.04.2025
PART 1 – Members, Public & Press
View of Proposed Development from Belmont Road towards High Street
4 Relevant Planning History
4.1 A list of the relevant planning history related to the property can be found in
Appendix 2.
5 Planning Policy
5.1 A list of planning policies relevant to the consideration of the application can be
found in Appendix 3.
6 Consultations and Representations
6.1 The Council sent consultation letters to 1,558 local residents, as well as The Mall
Pavilions Shopping Centre on 13-05-24. The Council also advertised the
application with a site notice and press notice on 22-05-24. The initial consultation
expired on 13-06-24.
6.2 The Council carried out a 21-day re-consultation on 12-02-25, which expired on 05-
03-25.
6.3 Representations received in response to public consultation are summarised in
Table 1 (below). Consultee responses received are summarised in Table 2 (below).
Full copies of the responses have also separately been made available to
Members.
Hillingdon Planning Committee – 09.04.2025
PART 1 – Members, Public & Press
Table 1: Summary of Representations Received
Representations Summary of Issues
Raised
Planning Officer
Response
One individual
letter of support
has been
received.
(1) Supports the proposal. Noted.
Three individual
neutral letters
have been
received.
(1) Not opposed to the
proposed development but
raised a concern regarding
lack of proposed car
parking and new co -living
residents applying for
resident's parking permits.
Discussed at paragraph
7.85 of this report.
(2) Concerns regarding
loss of retail; construction
disruption; inadequate co -
living amenity spaces;
cramped living space;
querying co -living resident
conflict management;
querying courtyard and
passageway management
and maintenance; querying
cycle prevention onsite;
and querying if public
toilets could be added.
Discussed at paragraph
7.11-7.19, 7.100, 7.72-
7.80, and 7.120-7.126 of
this report. Public toilets do
not form part of the
submitted application.
(3) Neutral comments
accepting the need to
develop the site but raise
concerns regarding noise
and parking.
Discussed at paragraph
7.81-7.91 and 7.98-7.101
of this report.
Nine individual
letters of objection
have been
received
(1) Noise pollution and
unnecessary disruption.
Discussed at paragraph
7.98-7.101 of this report.
(2) Not enough information
about the mixed communal
space and the co-living
accommodation.
Discussed at paragraph
7.72-7.80 of this report.
(3) Loss of light and
privacy.
Discussed at paragraph
7.67-7.71 of this report.
Hillingdon Planning Committee – 09.04.2025
PART 1 – Members, Public & Press
(4) The proposed building
would be too tall and over
dominant.
Discussed at paragraph
7.41-7.45 of this report.
(5) The proposal would
further overcrowd the town
centre; the proposed
building would be too tall;
overshadowing.
Discussed at paragraph
7.41-7.45, 7.61-7.65, and
7.67-7.71 of this report.
(6) Construction noise and
disruption.
Discussed at paragraph
7.100 of this report.
(7) Development scale
would be out of character
and building is
unattractive.
Discussed at paragraph
7.41-7.45 of this report.
(8) Too tall and large;
heritage impacts;
increased vehicle traffic;
overpopulation and
pressure on healthcare,
education, and waste
management; and
environmental concerns,
namely, carbon emissions,
noise, and air quality;
opposes demolition of
existing retail building;
potential for vacancies;
lack of planting; flood risk;
and loss of biodiversity.
Discussed at paragraphs
7.41-7.45, 7.46-7.60, 7.61-
7.65, 7.81-7.91, 7.98-
7.101, 7.104-7.106, 7.120-
7.126, 7.135-7.138, 7.139-
7.143, 7.146-7.151, 7.156-
7.159 of this report.
(9) Loss of on-street
disabled person car
parking bays; reduced
public car parking facilities;
the proposed building
would be incongruous and
too tall.
Discussed at paragraph
7.41-7.45 and 7.81-7.91 of
this report.
Table 2: Summary of Consultee Responses
Consultee and Summary of Comments
Planning Officer
Response
External Consultee Comments
Greater London Authority:
Recommended conditions regarding the
management and maintenance of the public realm,
materials, landscaping, free drinking water, district
heating network connection, Whole Life-Cycle Carbon
Assessment, Circular Economy Statement, and
The Applicant has
submitted additional
information following
the GLA’s Stage I
comments.
Hillingdon Planning Committee – 09.04.2025
PART 1 – Members, Public & Press
Urban Greening Factor. Recommended ‘Be Seen’
energy monitoring S106 obligation.
Stage II referral to the GLA is required if approved at
Planning Committee.
Land Use Principles : Supported in strategic planning
terms, subject to further information being submitted
to demonstrate compliance with London Plan Policy
H16.
Affordable Housing : The affordable housing in lieu
payment of £3,618,409 likely represents the
maximum viable amount in this particular case.
Urban Design : Broadly supported, though some
clarifications and amendments are requested in
relation to public realm, internal quality, fire safety,
and inclusive design. Conditions and obligations are
also recommended.
Heritage: Further information is required to enable
GLA officers to assess the proposals’ impacts.
Transport: The applicant is encouraged to explore
further improvements to the pedestrian and cycling
environment and contributions should be secured.
Concerns around impacts on bus operations must be
addressed. Other clarifications are requested and
conditions and obligations are recommended.
Environment : Further information needed in relation
to energy, whole life -cycle carbon, circular economy,
urban greening and air quality. Conditions and
obligations are also recommended.
Conditions have been
recommended in line
with GLA
recommendations.
Officers consider that
the matters raised in
the GLA’s Stage I
comments have been
addressed. The Local
Planning Authority will
refer the application
back to the GLA for
Stage II (as required)
if the Planning
Committee resolves
to grant planning
permission.
Transport for London:
No objection subject to a £105,000 contribution to
Transport for London towards implementing
measures to improve the bus infrastructure and
waiting environment secured by a Section 106 and
planning conditions regarding a Delivery and
Servicing Plan, Construction Logistics Plan, and
Travel Plan.
A S106 financial
contribution is
included in the
recommended Heads
of Terms. Conditions
have been
recommended in line
with TfL
recommendations.
Greater London Archaeological Advisory Service:
No objection.
Noted.
Historic England
Hillingdon Planning Committee – 09.04.2025
PART 1 – Members, Public & Press
No objection raised.
Noted.
National Health Service
No objection subject to a London Healthy Urban
Development Unit (HUDU) financial contribution of
£414,307 to fund enhanced or new health facilities
within the London Borough of Hillingdon secured by a
S106 Agreement.
A S106 financial
contribution is
included in the
recommended Heads
of Terms.
London Fire Brigade:
No objection. Further details required at the building
regulations consultation stage.
Noted.
Metropolitan Police Design Out Crime:
No objection subject to a condition regarding 'Secured
by Design' accreditation.
Conditions have been
recommended in line
with the Metropolitan
Police’s
recommendations.
Protective Security Operations (Metropolitan
Police):
No objection raised. Recommendations regarding
Counter Terrorism Risk Assessment and Operational
Requirement including access control system,
detection, and verification, Vehicle Dynamics
Assessment and hostile vehicle mitigation measures,
laminate glazing, dynamic lockdown system, and post
and delivery design.
Conditions have been
recommended in line
with the Metropolitan
Police’s
recommendations.
Thames Water Utilities:
No objection.
Noted.
National Air Traffic Services:
No objection.
Noted.
Ministry of Defence:
No objection subject to conditions regarding a
Construction Management Plan and Bird Hazard
Management Plan.
Conditions have been
recommended in line
with Ministry of
Defence
recommendations.
Hillingdon Planning Committee – 09.04.2025
PART 1 – Members, Public & Press
Health and Safety Executive:
No objection.
Noted.
Internal Consultee Comments
Viability Consultant (BNP Paribas):
No objection raised. Recommendation of in
lieu affordable housing contribution of £3,618,409
with early and late -stage viability review mechanism
secured by S106 legal agreement.
A S106 financial
contribution is
included in the
recommended Heads
of Terms.
Daylight/Sunlight Consultant (ULS):
No objection raised. Planning policy and guidance
support the optimisation of underutilised, highly
sustainable, accessible sites. In this context, it is
necessary to ensure that development is high -quality
and delivers benefits for both new and existing
communities when assessing daylight, sunlight, and
overshadowing matters. Planning decision makers
should apply de fault daylight and sunlight standards
sensitively and flexibly so not to prevent appropriate
development coming forward on the right sites.
Noted.
Urban Design Officer:
No objection. Condition recommended regarding
GRC cladding.
Conditions have been
recommended in line
with the Urban Design
Officer’s
recommendations.
Landscape Officer:
Some concerns raised regarding the amount of shrub
planting introduced in the public square and
subsequent reduction in useable area , visibility and
reduction in natural surveillance. Preference for fewer
trees to be planted but of a larger species. Noted that
these requests conflict with the requirement to
achieve appropriate level of Urban Greening Factor.
Request for details of materials proposed for the
seating areas and proposed soil depths for planting ,
agreement to proposed use of York Stone as a hard
surfacing materi al. No objection to details of the
Unfortunately, due to
the change in levels ,
the need to retain the
basement and
location of utilities ,
larger tree planting
can’t be
accommodated.
Noted that larger
trees may also
reduce natural
surveillance. Conflict
Hillingdon Planning Committee – 09.04.2025
PART 1 – Members, Public & Press
streetscape along Belmont Road and Bakers Road ,
nor to the proposed roof terrace landscaping .
with UGF noted.
Details of soil depth
and seating materials
to be secured by
condition . Discussed
at paragraph 7.120-
7.126 of this report.
Heritage Officer:
No objection.
Noted.
Economic Development:
No objection subject to an Employment/Construction
Training Scheme secured in accordance with the
Council's Planning Obligations SPD via a S106
Agreement.
This request is a
recommended Heads
of Terms to be
secured in the S106
Agreement.
Accessibility Officer:
No objection subject to a condition regarding
wheelchair -accessible hotel rooms.
Conditions have been
recommended in line
with the Accessibility
Officer’s
recommendations.
Refuse Recycling Officer:
No objection.
Noted.
Planning Policy Officer:
No objection.
Noted.
Highways Officer:
No objection subject to Section 106 Agreement
requiring residential parking permits restriction
(excluding Blue Badge holders), a Healthy
Streets/Active Travel Zone contribution of £61,996, a
£4,500 contribution towards implementing traffic
orders; a Section 278 Agreement to implement the
proposed off -site Highways Works, including York
Stone paving and installation of street trees, on
Bakers Road, Belmont Road, High Street, and Cocks
Yard; a Section 38 Agreement to transfer land in front
of the building on Belmont Road (not under
colonnade) and Bakers Road from the developer to
A S106 financial
contribution and S278
and S38 agreements
are included in the
recommended Heads
of Terms and
conditions have been
recommended in line
with the Highways
Officer’s
recommendations.
Hillingdon Planning Committee – 09.04.2025
PART 1 – Members, Public & Press
Hillingdon Council; and conditions regarding
Residential Travel Plan, Non-Residential Travel Plan,
Cycle Lift, Construction Logistics Plan, Delivery and
Servicing Plan, Parking Design and Management
Plan, and Car Parking Restrictions.
Air Quality Officer:
No objection subject to an Air Quality Mitigation
contribution of £88,533 secured by a Section 106
Agreement and conditions regarding a low emission
strategy (LES) and reducing emissions from
demolition and construction.
A S106 financial
contribution is
included in the
recommended Heads
of Terms and
conditions have been
recommended in line
with the Air Quality
Officer’s
recommendations,
except for LES , as
disabled person
electric vehicle
charging spaces are
covered by a separate
condition.
Noise Pollution Officer:
No objection subject to conditions regarding the
impact of the existing environment on the proposed
development and the noise impact of the proposed
development on the existing environment, as well as
informatives regarding external noise and demolition
and construction.
Conditions and
informatives have
been recommended
in line with the Noise
Officer’s
recommendations.
Environmental Health Officer (Land
Contamination):
No objection subject to a condition regarding land
contamination.
A condition has been
recommended in line
with the Land
Contamination
Officer’s
recommendations.
Environmental Specialist (Energy and
Biodiversity):
No objection subject to a carbon offset contribution of
£276,260 secured by a S106 Agreement and
A S106 financial
contribution and ‘be
seen’ obligation are
Hillingdon Planning Committee – 09.04.2025
PART 1 – Members, Public & Press
conditions regarding ‘be seen’ energy monitoring and
landscape.
included in the
recommended Heads
of Terms.
Recommended
conditions secure
landscape delivery.
Metis (Lead Local Flood Authority):
No objection subject to a drainage condition.
A drainage condition
has been
recommended in line
with Metis’
recommendation.
7 Planning Assessment
Principle of Development
7.1 The Site is within the Uxbridge Metropolitan Town Centre, Primary Shopping Area
(Uxbridge), and Office and Hotel Growth Location (Uxbridge Town Centre)
designations. Policy SA 26 of Hillingdon Local Plan Part 2 designates the Site for
'New Homes', stating:
The site is considered suitable for residential-led mixed use redevelopment subject
to the following criteria:
• Provision of upper floor residential units, which must include affordable housing
and an appropriate mix of units, provided in accordance with Council standards.
Other main town centre uses, such as leisure uses, may be acceptable on upper
floors;
• Retention of ground floor retail uses fronting onto the High Street and provision
of main town centre uses, providing active frontages onto Bakers Road and
Belmont Road;
• The redevelopment should enhance the pedestrian thoroughfare of Cock's Yard
linking Uxbridge Town Centre and the Bus Interchange;
• Amenity space and car parking should be provided in accordance with the
Council's standards;
• The redevelopment should sustain and enhance the significance of the adjacent
Conservation Area and its setting;
• The Council will expect redevelopment proposals to reflect the scale and
character of the surrounding townscape and have regard to the setting of the Old
Uxbridge and Windsor Street Conservation Area and Listed Buildings. Whilst the
London Plan density guidance indicates a development potential of up to 120 units,
capacity on this site should be led by high quality design, taking account of the
site's prominent location; and
• Proposals should provide scope to incorporate the redevelopment of the land to
the south of the site (identified in yellow on the site plan), extending from Cock's
Hillingdon Planning Committee – 09.04.2025
PART 1 – Members, Public & Press
Yard to the Uxbridge Underground Station, in accordance with the principles set
out in this policy.
7.2 The proposal consists of the demolition of existing buildings and construction of a
residential-led mixed-use development comprising 320 co-living homes (13,923 sq.
m. GIA), a 162-bedroom hotel (5,827 sq. m. GIA), and re-provision of 1,115 sq. m.
of modern commercial floorspace with double-height glazed frontages.
7.3 The Council’s Policy Team ha s reviewed the proposal and concur s with the
comments below – no Policy Team objections. Similarly, the GLA has reviewed the
proposal and supports the land use principle in strategic terms , subject to
compliance with Policy H16 of The London Plan (discussed below).
Large-Scale Purpose-Built Shared Living
7.4 Policy H1 of The London Plan aims to increase housing supply and sets Hillingdon
Council a net housing completion target of 10,830 between 2019/2020 and
2028/2029. Net non -self-contained accommodation contributes towards meeting
housing targets as per Paragraph 4.1.9 of The London Plan (2021), based on a
1.8:1 ratio for co -living accommodation: self-contained home. Therefore, the
proposed 320 co-living units would be equivalent to 178 self-contained homes.
7.5 The proposed large-scale purpose-built shared living component would provide
new homes in Uxbridge Metropolitan Town Centre, aligning with Policy SA 26 of
Hillingdon Local Plan Part 2 , that states th e Site is considered suitable for
residential-led mixed-use development.
7.6 Furthermore, Policy H16 of The London Plan states large-scale purpose -built
shared living development must contribute towards mixed and inclusive
neighbourhoods and be in an area well -connected to local services and
employment by walking, cycling, and public transport. The additional uplift in homes
would contribute towards mixed and inclusive neighbourhoods, providing a housing
option for single -person households who cannot or choose not to live in self -
contained homes or Houses in Multiple Occupation (HMO s). The application Site,
located on the High Street and Primary Shopping Area within the Uxbridge Town
Centre, benefits from a Public Transport Accessibility Level (PTAL) of 6a, where a
score of 0 indicates very poor access to public transport and 6b indicates excellent
access. Notably, Uxbridge London Underground station is approximately 50 metres
southeast of the Site. It provides access to the Metropolitan and Piccadilly lines.
Additionally, there are several bus stops on Belmont Road and Bakers Road. A s
such, the site is in an area very well connected to local services and employment
by walking, cycling, and public transport. A condition is attached to ensure the
accommodation would remain as rented co-living units (and units would not
become self-contained homes or be sold ) under single management with lease
terms of at least three months. An Operational Management Plan would ensure the
shared living accommodation is appropriately managed and maintained to ensure
the long-term quality.
7.7 The NPPF, London Plan, and Local Plan supports the principle of large-scale
purpose-built shared living component in this Town Centre location with excellent
Hillingdon Planning Committee – 09.04.2025
PART 1 – Members, Public & Press
public transport connec tions, subject to the recommended planning conditions to
ensure compliance with Policy H16 of The London Plan . Overall, the principle of
the proposal accords with Policy H1 , GG4 of the London Plan (2021) and
paragraph 77 of the NPPF 2024.
Hotel
7.8 A hotel is classified as a town centre use. This proposed hotel would be in Uxbridge
Metropolitan Town Centre, within an area designated for Office and Hotel Growth
Location (Uxbridge Town Centre). It would be well -connected to public transport
and enhance and extend the visitor accommodation supply, adding 162 hotel
bedrooms to the town centre.
7.9 It should be noted that a standalone application for a hotel (application reference
72722/APP/2019/347) was submitted in 2019. The Applicant withdrew their
application prior to determination; however, at the time, Planning Officers
considered the principle of the proposed hotel within this location would be
supported given it was within a hotel growth designation and town centre, provided
the Applicant could robustly justify the loss of the office space. Council Planning
Officers subsequently reviewed the A pplicant’s submitted marketing evidence
justifying the loss of the office space and found it acceptable.
7.1
0
The principle of the hotel component is supported considering the site’s planning
designations, accessible and sustainable location, and nature of the visitor
accommodation. As such the proposal accords with Policy E10 of The London
Plan, Policy E2 of the Hillingdon Local Plan Part 1, and Policies DME 4 and DME
5 of the Hillingdon Local Plan Part 2.
Retail
7.1
1
The proposal comprises the demolition of the existing 3,582 sq. m. of retail
accommodation (Use Class E) and the construction of 1,115 sq. m. of new ground
floor retail floor space (Use Class E), representing a loss of 2,467 sq. m. of retail
floor space with the Town Centre and Primary Shopping Area.
7.1
2
The GLA has stated in their Stage 1 comments that the proposed reduction in retail
floor space does not raise strategic concerns, noting that the site is currently under-
occupied and acknowledging the constraints associated with providing a new public
square.
7.1
3
The Site is within Uxbridge Town Centre. Therefore, the proposed retail use is
acceptable and in accordance with policy.
7.1
4
The Site is within a Primary Shopping Area. Forty-eight per cent of the total frontage
of the site would be allocated for commercial uses. This includes most of the
frontage along Uxbridge High Street, which is the focus of retail activity. A notable
proportion of the frontage along Belmont Road would also be in commercial use.
As Policy SA 26 of the Hillingdon Local Plan Part 2 designates the Site for 'New
Homes', stating 'The site is considered suitable for residential -led mixed -use
development,' a reduction in retail frontage (as stated in Policy DMTC 2 ) is
Hillingdon Planning Committee – 09.04.2025
PART 1 – Members, Public & Press
accepted in this case to facilitate the proposed mixed uses and having regard to
the matters discussed below .
7.1
5
Unit 9a Belmont Road (688 sq. m.) and Cocks Yard kiosks 1 -4 (72 sq. m.) are
vacant.
7.1
6
It is well known that high streets have faced significant challenges post COVID-19
where vacancy rates remain higher than pre -covid. As such , planning for retail
provision has changed with layouts now being formed by more flexible and
modestly sized units. The existing building does not present a valued contribution
to the Town Centre or the Conservation Area therefore its replacement is
welcomed. Taking into consideration the challenges and retail design changes
which are informed by the market, t he harm derived by the shortfal l in retail
reprovision is not considered to be substantial and could be accepted providing the
applicant provides evidence of clear public benefits to outweigh the harm .
7.1
7
It is noted that the principal purpose of the policies which seek to retain
retail/commercial uses within Town Centre’s is to safeguard the vibrancy and
vitality which is generated by them. The application would provide active
commercial frontages around almost the entire ground floor plate, with double
height frontages provided , thus creating a more attractive street frontage to what
exists at present. The units have been designed to incorporate mezzanines should
the end user w ish to implement on e, which would modestly increase the usa ble
internal area. Furthermore, the co-living element has been designed with the active
frontage at ground floor level and all of the commercial units would have a front
and back which would allow entry and exit from the high street to the new public
open space and vice versa.
7.1
8
The applicant has engaged in the pre -application advice process where Officers
considered what type of land uses would be most desirable and result in the
greatest public benefit. The High Street and wider Town Centre lack attractive
public open space, therefore a greater emphasis has been placed on unlocking the
site’s potential to address this need.
7.1
9
Notwithstanding the net loss of 2,467 sq. m. of retail floor space, on balance, the
benefits of the proposed development outweigh this harm. Planning benefits would
include much-improved quality of the modern replacement retail floor space on
Belmont Road and High Street , including double -height facades and mezzanine
floors, adding 320 co-living homes and a further 162 new hotel bedrooms to support
the functioning of the town centre, and developing a landscaped public square with
improved and new pedestrian links. There are also offsite public realm
improvements and an in lieu affordable housing contribution of £3,618,409 which
would be secured through the S106 legal agreement.
Loss of Office Space
7.2
0
As previously stated, the site is designated within a ‘Hotel and Office Growth
Location’ and the existing development includes approximately 1,524 sq. m. of
office floor space (Use Class E) within Bakers House and Belmont Chambers.
Hillingdon Planning Committee – 09.04.2025
PART 1 – Members, Public & Press
7.2
1
The development plan seeks to safeguard office space within dedicated locations,
usually town centres, thus recognising the contribution offices make to employment
and the vitality of town centres , due to the footfall the employment generates. As
such, the loss of office space must be robustly justified.
7.2
2
The submitted Financial Viability Appraisal notes that the office accommodation
has been marketed to let. The Applicant has submitted further evidence to support
this point. Evidence has been provided from Levy Real Estate, which demonstrates
that the offi ce floorspace has been actively marketed since January 2023 – over
two years. The Applicant has also submitted an interest schedule detailing the
interest received regarding the existing office space. The enquiries from interested
parties did not progress as the potential occupants sought smaller spaces. The
existing offices are dated and of poor quality. Due to lack of interest in the Site, the
Site has remained predominantly vacant for over 12 months. The Applicant has
also undertaken an online market review of available office floorspace along
Uxbridge High Street and the immediate surrounding area. This market review has
identified 18 vacant office spaces. This review highlights a significant proportion
(ranging between 5,441 sq. m. and 29,792 sq. m.) of availa ble office floorspace in
this immediate location.
7.2
3
Surrounding employment uses would not be undermined , as the proposed
development would introduce 320 co -living units, a new hotel, and modern retail
units to the town centre. The Applicant has demonstrated that the offices have been
actively marketed for two years without success, and it is no longer a viable use in
the context of ongoing office vacancies in the area. The proposal complies with
Policy DME 3 of the Local Plan Part 2 and the loss of office space is supported in
this instance.
Loss of Self-Contained Housing
7.2
4
The existing development contains 258 sq. m. of residential (Use Class C3)
floorspace.
7.2
5
Policy DMH 1 of the Local Plan Part 2 states that t he net loss of existing self -
contained housin g will be resisted unless the housing is replaced with at least
equivalent residential floorspace.
7.2
6
Whilst the proposal would result in the loss of 258 sq. m. of residential (Use Class
C3) floorspace, this would be replaced by 13,819 sq. m. of co-living floorspace (Use
Class Sui Generis). Whilst this is not conventional C3 housing, it is a significant
uplift in residential floorspace – Paragraph 4.1.9 of The London Plan (2021)
equates the proposed 320 co -living units (non -self-contained communal
accommodation) to be equivalent to 178 single homes based on a 1.8:1 ratio .
Notably, the replacement shared living accommodation would contribute
significantly to the borough’s housing targets in a h ighly accessible, allocated site
in Uxbridge town centre. In addition, the scheme makes a £3,618,409 affordable
housing contribution in lieu , secured through the Section 106 agreement.
Hillingdon Planning Committee – 09.04.2025
PART 1 – Members, Public & Press
7.2
7
For the reasons explained above, the loss of residential (Use Class C3) floor space
is supported in this instance , despite the conflict with Policy DMH 1 of the Local
Plan Part 2.
Comprehensive Redevelopment
7.2
8
Policy SA 26 of The Local Plan Part 2 Site Allocations and Designations states that
proposals on this designated Site should provide scope to incorporate the
redevelopment of the land to the south (identified in yellow on the site plan below),
extending from Cock's Yard to the Uxbridge Underground Station, in accordance
with the principles detailed in Policy SA 26. Policy DMHB 11 of The Local Plan Part
2 further states that development will be required to ensure the design safeguards
the satisfactory redeve lopment of any adjoining sites with development potential.
Regarding proposals for major development sites, the Council expects developers
to prepare master plans and design codes and agree on these with the Council
before developing detailed designs.
Application Site (red line) and land to the south (shaded yellow)
7.2
9
It is considered that t he design and layout of the proposed development duly
consider the potential redevelopment of the land to the south. It has been
sufficiently demonstrated through the planning application submission, that t he
proposal would not compromise the redevelopment potential of the land to the
south of the Site, and there would be scope for any future redevelopment to the
south to integrate with Cocks Yard and the proposed public square. Council officers
endeavoured to get both the application Site and the land to t he south to come
forward as a master plan application, but due to land ownership complexities, this
could not be achieved. Officers are satisfied that the submitted application would
allow for the optimisation of the land to the south in accordance with Po licy SA 26
of The Local Plan Part 2 and Policy DMHB 11 of The Local Plan Part 2.
Hillingdon Planning Committee – 09.04.2025
PART 1 – Members, Public & Press
Housing Mix
7.3
0
Policy H10 of The London Plan states that schemes should generally consist of a
range of unit sizes. Decision -makers should have regard to , amongst other
considerations:
- the need to deliver a range of unit types at different price points across London
- the nature and location of the site, with a higher proportion of one and two bed
units generally more appropriate in locations which are closer to a town centre or
station or with higher public transport access and connectivity
- the aim to optimise housing potential on sites
- the ability of new development to reduce pressure on conversion, sub -division
and amalgamation of existing stock
- the need for additional family housing and the role of one and two bed units in
freeing up existing family housing.
7.3
1
Policy DMH 2 of The Local Plan Part 2 states that the Council will require residential
developments to provide a range of different housing sizes to reflect the Council's
latest information on housing need.
7.3
2
Family housing is defined within the glossary of The London Plan. It outlines that it
must generally be of a size that has three or more bedrooms.
7.3
3
The Council's latest information on housing need indicates a substantial borough -
wide requirement for larger affordable and private market units, particularly three -
bedroom properties, as identified in the Strategic Housing Market Assessment
(2016).
7.3
4
The proposed development would provide 320 co -living units (equivalent to 178
self-contained homes) within Uxbridge town centre. This would strengthen the
borough's housing stock for single -person households by providing an alternative
housing product for those who cannot or choose not to live in self-contained homes
or Houses in Multiple Occupation. It would contribute to reducing pressure on
conversion, sub -division, and amalgamation of existing housing stock and could
free up existing family housing. The denser, one-bedroom nature of the proposed
development would be appropriate and is supported in this sustainable, highly
connected town centre location, immediately adjacent to Uxbridge station and bus
interchange, with a PTAL of 6a. It would optimise housing potential on -site, led by
design and within the context of other site constraints (e.g. reproviding commercial
floor space). This type of housing does not currently exist in the town centre. It
would not give rise to any over -concentration of large -scale purpose -built shared
living accommodation in this location, and it would aid the borough in delivering a
range of unit types.
7.3
5
Noting that this would be the first purpose -built co -living scheme of its kind in
Hillingdon since the adoption of the GLA’s Large-scale Purpose-built Shared Living
Guidance , Officers have reviewed examples of similar developments as part of the
financial viability assessment process and find this site to be an optimal location for
this type of housing.
Hillingdon Planning Committee – 09.04.2025
PART 1 – Members, Public & Press
7.3
6
Whilst it's acknowledged the proposed scheme would not provide a range of unit
sizes as stated in Policy H10 of The London Plan and Policy DMH 2 of The Local
Plan Part 2, the proposed development would broadly comply with The London
Plan for the reasons de tailed above and is appropriate and supported within this
highly accessible town centre location.
Affordable Housing
7.3
7
The development proposes purposed-built shared living accommodation (referred
to as Co -Living), which is not a traditional housing typology. Notwithstanding this
point, the development proposes a residential product which, in accordance with
The London Plan and Large -Scale Purpose -Built Shared Living London Plan
Guidance, is subject to affordable housing requirements. This differs from
traditional C3, because the affordable housing provision secured by the authority
can be either an upfront cash -in-lieu payment to the local authori ty or an in -
perpetuity annual payment to the local authority. In either case, the Applicant must
provide a contribution which is equal to 35 percent of the units, or if this is not viable,
submit a financial viability assessment (FVA) that the Local Planning Authority and
the GLA robustly test.
7.3
8
The Council appointed BNP Paribas Real Estate (BNPP) to independently review
and provide specialist viability advice to the Council regarding the submitted
Financial Viability Assessment (reference 2024-055, prepared by Newsteer, dated
March 2024). BNPP’s advice conclud ed that the proposed development, with 100
per cent private housing , would generate a Residual Land Value of £13,148,558,
providing a surplus of £3,618,409 against the viability benchmark. Accordingly , the
Applicant has agreed to pay the Council an in -lieu affordable housing contribution
of £3,618,409. The S106 legal agreement shall include early and late-stage viability
review mechanism s to ensure that if the scheme’s viability improves , then the
Council would capture an appropriate uplift in value .
7.3
9
The GLA’s Viability Advisor has also reviewed the submission and stated that the
affordable housing in lieu payment of £3,618,409 (as agreed between the Applicant
and Planning Officers ) likely represents the maximum viable amount in this
particular case.
7.4
0
Officers consider the Applicant’s affordable housing offer to be the maximum
reasonable at this stage . T he late-stage review mechanism will ensure this is
carried through the implementation of the development . The proposed
development complies with Policy H16 of The London Plan , The Large-Scale
Purpose-Built Shared Living London Plan Guidance and Policy DMH 7 of the
Hillingdon Local Plan Part 2.
Design / Impact on the Character and Appearance of the Area
7.4
1
The applicant has engaged in lengthy pre-application discussions to bring forward
a scheme which would enhance the Town Centre. This also includes a pre -
application Design Review Pannel which Officers also attended. This has resulted
in a scheme which delivers a balance of residential and commercial uses located
Hillingdon Planning Committee – 09.04.2025
PART 1 – Members, Public & Press
around a public square. The site is subject to physical constraints such as a
moderate level change from the high street up to the corner of Bakers Road. A
ramp is also required to be constructed to provide access to the basement level car
park and this is a significant constraint on the proposed design of the public square,
as the landscaping needs to be elevated above ground level to provide soil depths
for planting.
7.4
2
The proposed building's location, arrangement, and uses on the site are logical and
appropriate in urban design terms . The proposal comprises active uses at the
ground floor level fronting the surrounding streets with regular building entrances
and a central public courtyard lined by extensive ground -floor glazing and
overlooked by upper-floor windows. This is supported.
Existing and Proposed View from Belmont Road towards High Street
7.4
3
Regarding the proposed development's massing and visual impact, Officers agreed
on short, medium, and long -range viewpoints with the Applicant for them to test
and for the Council to assess. The Applicant duly submitted a document (Additional
Views Assessment V.01, prepared by Child Graddon Lewis, dated November
2024) illustrating the proposed development within its urban setting. The proposed
built form, massing, and height of the development are appropriate for the
surrounding town centre context, within an area highly accessible by public
transport (PTAL of 6a). The immediate surrounding context includes large buildings
similar to the proposal's height and scale. The neighbouring Premier Inn hotel and
adjacent mixed -use building are nine storeys tall, whi lst the office block at the
corner of Bakers Road and Belmont Road is five storeys. Notably, given the land
level changes, these buildings on higher ground to the Site’s northeast, on Bakers
Road, appear more prominent and would appear similar in height to the proposed
ten-storey development that would be on lower ground . Armstrong House and
Middlesex House on top of The Pavilions shopping centre, to the Site’s southwest,
are eight storeys in height . The proposed massing along the north side of the
development fronting Belmont Road steps down from ten storeys to eight to provide
visual interest and reduce the perceived massing of the site against the lower -
density buildings on the opposite side of Belmont Road. This design approach is
supported and is contextually appropriate . The building’s location, scale, and
design would reinforce the spatial hierarchy and aid the legibility and wayfinding of
Uxbridge Town Centre.
Hillingdon Planning Committee – 09.04.2025
PART 1 – Members, Public & Press
7.4
4
The building's design and appearance would vary depending on the use (hotel,
commercial, co-living) and the street that it fronts (Belmont Road, Bakers Road,
High Street), utilising a well-considered and coherent selection of colours within the
same family of materials to appropriately articulate the facades. During the planning
process, the Council has secured external material details, including white tile
specifications for the treatment of the two pedestrian passageways and bricks,
mortar, and cladding specifications to ensure high quality variety to the building’s
elevational treatment s. The Applicant has provided examples of the external
material’s use on architectural award -winning buildings in sensitive locations
(within a Conservation Area with several nearby Listed buildings). The Council also
secured further architectural detailed study drawings that illustrate the facade's
detailing and ensure the elevations would be layered and not appear flat. The
massing is further softened by the chamfered corners at the building’s junction with
High Street, Belmont Road, and Bakers Road, colonnade design feature at ground
level, and recessed mansard design of the hotel's upper two storeys. The mixture
of building height s and building line and variety of secured materials and colours,
along with the detailed architectural elements , would contribute to achieving an
appropriate high -quality design and appearance to reflect the development’s
prominent, central location near to heritage assets.
7.4
5
The proposal complies with Paragraph 131 of the NPPF, Policies D3, D6, and D9
of The London Plan , Policy BE1 of the Local Plan Part 1 , and Policies DMHB 11
and DMHB 12 of the Local Plan Part 2.
Heritage
7.4
6
Section 66(1) of the Planning (Listed Buildings and Conservation Areas) Act 1990,
imposes a statutory duty on Local Planning Authorities requiring that in considering
whether to grant planning permission for
Text extracted automatically from the PDF, so layout, tables and images are not shown. Only the start of this long document is shown here. Open the original PDF on LB Hillingdon’s website.