Read the text of this document (61 pages)
Hillingdon Planning Committee – 11th June 2025
PART 1 – Members, Public & Press
Report of the Head of Development Management and Building Control
Committee Report
Case Officer: Emilie Bateman 76760/APP/2024/2720
Date Application
Valid:
10.12.2024 Statutory / Agreed
Determination
Deadline:
12.06.2025
Application
Type:
Full Ward: Colham &
Cowley
Applicant: Simply Develop (UK) Ltd.
Site
Address:
12-18 Pield Heath Road & 2 Pield Heath Avenue
Proposal: Partially retrospective demolition of four dwellings (Nos.
12, 14, and 16 Pield Heath Road and 2 Pield Heath
Avenue) and one Bed and Breakfast (No. 18 Pield Heath
Road), and the subsequent erection of a part two storey,
part three storey (plus basement) care home (Class C2),
with car parking, landscaping, and associated works.
Summary
of Rec:
GRANT planning permission subject to section 106
legal agreement and conditions
Reason
Reported to
Committee:
Required under Part 1 of the Planning Scheme of
Delegation (Major application recommended for
approval)
Hillingdon Planning Committee – 11th June 2025
PART 1 – Members, Public & Press
Summary of Recommendation:
GRANT planning permission subject to the completion of a
satisfactory section 106 legal agreement to secure the heads of
terms set out below, and subject to the conditions as set out in
Appendix 1.
That delegated powers be given to t he Director of Planning, Regeneration
and Environment to grant planning permission subject to the following:
A) That the Council enter into a legal agreement with the applicant under
Section 106 of the Town and Country Planning Act 1990 (as amended) or
any other legislation to secure the following:
I. Secure use of the building as a care home, falling within the C2 use
class.
II. Air Quality Mitigation contribution of £52,754.
III. A Carbon Offset contribution of £204,970; or a reduced figure if
greater on-site carbon savings are shown to be implementable
through an updated Energy Strategy.
IV. London Healthy Urban Development Unit (HUDU) financial
contribution of £215,217 to fund enhanced or new health facilities
within the London Borough of Hillingdon.
V. A full Travel Plan to be approved in writing by the Local Planning
Authority.
VI. An Employment/ Constructi on Training Scheme secured in
accordance with the Council's Planning Obligations SPD.
VII. A Section 278 agreement to implement the proposed off-site
Highways Works.
VIII. A Project Management and Monitori ng Fee, equalling 5% of the total
financial contributions to be paid under this agreement.
B) That in respect of the applicati on for planning permission, the applicant
meets the Council's reas onable costs in preparat ion of the Section 106
Agreement and any abortive work as a result of the agreement not being
completed.
C) That officers be authorised to negotiate and agree the detailed terms of
the proposed agreement and conditions of approval.
D) That, if the Legal Agreement has not been finalised within 6 months (or
such other time frame as may be agr eed by the Director of Planning,
Re
generation and Environment ), dele gated authorit y be given to the
Hillingdon Planning Committee – 11th June 2025
PART 1 – Members, Public & Press
Director of Planning, Regeneration and Environment to refuse planning
permission for the following reason:
'The applicant has failed to mitigate the impacts posed by the proposed
development (in respect of Air Quality, Carbon Offsetting, Health Facilities,
Travel Planning, Employment, Highwa ys Safety, and Project Monitoring).
The scheme therefore conflicts with Policies DMCI 7 of the Hillingdon Local
Plan: Part 2 (2020); the adopted Pla nning Obligations Supplementary
Planning Document (2014); Policy DF 1 of the London Plan (2021); and
paragraphs 56-58 of the National Planning Policy Framework (2024).'
E) That if the applicati on is approved, that the pe rmission is subject to the
Conditions as set out in Appendix 1.
1 Executive Summar
y
1.1 This application seeks permission for the proposed demolition of the existing
buildings and structures across the si te and the subsequent erection of a part
two, part three-store
y (plus basement level), 81-bedroom care home.
1.2 The proposed development is considered acceptable in land use terms, and it is
noted that part of the site benefits from a recent planning permission (ref.
76760/APP/2022/1889) for a 60-bed care home.
1.3 The development is considered to hav e an acceptable impact on the surrounding
area and is consistent with the objectiv es of the Hilling don Local Plan and the
London Plan.
1.4 Subject to the planning conditions and obligations recommended, the proposed
development is considered acceptable with respect to design, heritage,
residential amenity, environmental issues, transport, and sustainability.
1.5 For the reasons outlined above and within the main body of the report, this
application is considered to comply with the Development Plan and is
recommended for approval, subject to secu ring the planning conditions set out
in Appendix 1 and a Section 106 legal agreement.
2 The Site and Localit y
2.1 The application site comprises five indi vidual curtilages (Nos.12, 14, 16 and 18
Pield Heath Road and No. 2 Pield Heath Avenue), four of which are residential
uses (C3 use class), and one of which (No. 18) is a Bed and Breakfast (C1 use
class
).
2.2 No. 2 Pield Heath Avenue and Nos. 12 and 18 Pield Heath Road were both built
as single-storey bungalows, much like the vast majority of properties on Pield
Heath Avenue, althou gh most have now been extended to accommodate
Hillingdon Planning Committee – 11th June 2025
PART 1 – Members, Public & Press
habitable accommodation within the lofts pace. Pield Heath Road, on the other
hand, has a much more varied streetsene with much greater variation in both the
scale and design of developments, incl uding examples of one, two and three-
storey buildings.
2.3 The character of the immediate ar ea surrounding the application site is
residential, notwithstanding that part of the application site is in use as a Bed and
Breakfast. Moorcraft Park, a large area of public open space, sits opposite the
site.
2.4 The site forms part of the declared Hillingdon Air Quality Management Area. The
site also sits in between two declar ed Air Quality Focus Areas, including the
Uxbridge Road Focus Area to the east and Hillingdon Hospital Focus Area to the
west. Green Belt land is also designated a short distance to the south. The site
has a moderate Public Transport Accessibilit
y Level (PTAL) of 3.
Fi
gure 1: Location Plan (application site edged red)
Hillingdon Planning Committee – 11th June 2025
PART 1 – Members, Public & Press
Figure 2: Street View Image of the Application Property
3 Proposal
3.1 This application seeks permission for the proposed demolition of the existing
buildings and structures across the si te and the subsequent erection of a part
two, part three-storey (plus basement level), 81-bedroom care home.
3.2 The building would be laid out with its main frontage facing Pield Heath Avenue
and a secondary frontage facing Pield Heath Road, appearing as a three-storey
building across most of its length, and stepping down in height to two-storeys
adjacent to No. 4 Pield Heath Avenue to the north.
3.3 The development would creat e a partially enclosed courtyard to the centre of the
building, which is intended to be us ed as a resident garden, alongside a
wildflower
garden to the rear of No. 2 Pield Heath Avenue.
3.4 Parking is proposed in the section of the site adjacent to Pield Heath Road, with
provision for 19 spaces, including 3 disabled bays and 4 electric vehicle charging
points, alongside an ambulance bay, delivery bay, 12 cycle spaces and 4
mobilit
y scooter spaces.
Hillingdon Planning Committee – 11th June 2025
PART 1 – Members, Public & Press
Figure 3: Proposed Site Plan (please note – a larger version of plan can be
found in the Committee Plan Pack)
Figure 4: Proposed Street Facing Elevations (Pield Heath Avenue above,
Pield Heath Road below) (please note – a larger version of plan can be found in
the Committee Plan Pack)
Hillingdon Planning Committee – 11th June 2025
PART 1 – Members, Public & Press
Figure 5: Proposed Fl oor and Roof plans (please note – a larger version of
plan can be found in the Committee Plan Pack)
4 Relevant Planning History
4.1 Application reference 76760/APP/2022/1889 (Demolition of three dwellings and
one Bed and Breakfast, and the subsequent erection of a care home) was
approved on 11-12-23.
4.2 A non-material amendment (76760/ APP/2024/1470) was later approved on 01-
07-24 to make internal and external reconfigurations.
Hillingdon Planning Committee – 11th June 2025
PART 1 – Members, Public & Press
Figure 6: Previously Approved Site Plan (site not in cluding No.12 Pield
Heath Road)
Figure 7: Previously Appr oved Street Facing Elevations (site not including
No.12 Pield Heath Road). Pield Heat h Avenue above, Pield Heath Road
below).
5
Planning Policy
A list of planning policies relevant to the consideration of the application can be
found in Appendix 3.
Hillingdon Planning Committee – 11th June 2025
PART 1 – Members, Public & Press
6 Consultations and Representations
6.1 A total of 45 no. letters were sent to neighbouring properties, a site notice was
displayed to the front of the site and an advert was posted in the local paper. All
forms of consultation expired on 21
st May 2025.
6.2 Representations received in response to public consultation are summarised in
Table 1 (below). Consultee responses received are summarised in Table 2
(below). Full copies of the responses have also separately been made available
to Members.
Table 1: Summary of Representations Received
Representations Summary of Issues
Raised
Planning Officer
Response
Three individual
letters of objection
have been
received
I. Not in keeping. Discussed in paragraphs
7.9 to 7.17.
II. Concerns about further
expansion.
The acceptability of the
proposal is discussed
throughout the committee
report.
III. Overconcentration of
care homes within 1km.
Discussed in paragraph
7.6
IV. Traffic, parking and
road safety concerns.
Discussed in paragraphs
7.79 to 7.93.
V. No needs analysis for
this specific area.
Discussed in paragraph
7.7.
VI. Noise and disturbance
during construction.
A condition has been
included requiring the
submission of a
construction management
plan.
VII. Noise pollution. Discussed in paragraphs
7.44 to 7.47.
VIII. Concerns regarding the
length of consultation
period following
revisions.
The consultation period is
carried out in accordance
with statutory
requirements.
One
representation
was received in
support of the
proposal
a. Supportive of
project
b. Positive addition to
neighbourhood
Noted.
Hillingdon Planning Committee – 11th June 2025
PART 1 – Members, Public & Press
c. Enhancing
community and
contributing in a
meaningful way
Councillor Etka
Gohil (ward
Councillor).
1. Parking and
Highway Safety
Impacts:
The proposed 33%
increase in care
home capacity will
significantly
exacerbate on-
street parking
demand in the
surrounding area,
particularly on Pield
Heath Avenue,
where parking is
already constrained
due to its proximity
to Hillingdon
Hospital and local
amenities. The
increase in visitors,
staff, and
associated
deliveries will likely
lead to parking
overspill,
obstructing
driveways and
creating potential
safety hazards. This
contravenes policies
aimed at mitigating
parking stress and
ensuring highway
safety.
2. Traffic and Noise
Pollution:
The anticipated
increase in
deliveries and
associated vehicular
movements will lead
to additional traffic
Discussed in paragraphs
7.79 to 7.93.
The trip generation
represents a marginal
increase from the
previously approved
scheme. Therefore, there
is not anticipated to be an
increase in traffic and
associated noise pollution
Hillingdon Planning Committee – 11th June 2025
PART 1 – Members, Public & Press
and noise pollution
on Pield Heath
Avenue, a
predominantly
residential road.
This conflicts with
the requirement for
developments to
avoid undue harm
to residential
amenity as set out
in local and national
planning policies.
3. Unjustified Need in
This Area:
While the needs
analysis indicates a
borough-wide
demand for care
home spaces, it fails
to demonstrate a
specific need for
increased provision
in this locality.
There are already
multiple care homes
within a 1km radius,
suggesting that this
location is not
underserved.
4. Impact on
Residential
Amenity During
Construction:
The applicant has a
poor track record of
managing the
construction
process in a manner
that respects
residential amenity.
Issues have
included excessive
noise and vibration,
inadequate dust
mitigation, failure to
clean vehicle
wheels (leading to
hazardous road
that would result in undue
harm to neighbouring
amenity to warrant a
reason for refusal. A
condition has also been
submitted requiring the
submission of a delivery
and servicing plan.
Discussed in paragraph
7.7.
A condition has been
included requiring the
submission of a
construction management
plan.
Hillingdon Planning Committee – 11th June 2025
PART 1 – Members, Public & Press
conditions), and
poor vehicle
management
causing access
obstructions. The
proposed expansion
will prolong these
disruptive impacts,
contravening
policies requiring
developments to
protect the living
conditions of nearby
residents.
5. Cumulative
Environmental and
Amenity Harm:
The scale and
intensification of the
care home will
result in a
cumulative impact
on the surrounding
area, including
increased pollution,
traffic congestion,
and disruption to
residents' quality of
life. These impacts
conflict with the
council's duty to
safeguard the
environment and
maintain the
amenity of local
communities.
The environmental impacts
of the scheme are
discussed within the
relevant sections of this
report.
Table 2: Summary of Consultee Responses
Consultee and Summary of Comments
Planning Officer
Response
External Consultation
Heathrow Airport Safeguarding:
Heathrow Airport Safeguarding has no
safeguarding objections to the proposed
development. However, if a crane is required
durin
g installation, the applicant must submit
The Heathrow Airport
Safeguarding comments are
noted. Please refer to
Informative 7.
Hillingdon Planning Committee – 11th June 2025
PART 1 – Members, Public & Press
details including height, operating radius, and
dates to the CAA Airspace Coordination and
Obstacle Management Service (ACOMS).
Cranes must not be operated on site until a
crane permit has been issued by Heathrow
following CAA notification. Further guidance is
available in CAA CAP1096.
London Fire Brigade:
London Fire Brigade raised no objection at
this stage but advises that the development
must comply with Part B of the Building
Regulations, particularly in relation to fire
brigade access and water supplies. The
applicant is encouraged to consult Building
Control or an Approved Inspector, who may
refer the application to the Fire Authority.
If there are any deviations from Approved
Document B (Volume 1 and 2, Section B5),
particularly regarding hydrants or access, this
information must be submitted to the relevant
LFB teams for further review. Additional
consultation may be required if material
amendments are made to the proposal.
The London Fire Brigade
comments are noted.
It is noted that the
development should accord
with the relevant Building
Regulation requirements.
Fire safety matters are also
to be addressed through
Condition 9.
Met Police (Designing Out Crime):
Metropolitan Police Designing Out Crime
Officer (DOCO) advises that the site is subject
to a Secured by Design (SBD) condition,
which should be retained and applied to the
entire site. The applicant has not yet engaged
with the DOCO/SBD team.
Secured by Design is
secured by Condition 23.
The applicant has been
reminded of the need to
engage with the DOCO at
the earliest stage to address
crime prevention through
design and ensure the
condition can be
discharged.
Ministry of Defence:
Ministry of Defence (MOD) has reviewed the
application and raises no objection, confirming
that the proposed development will not impact
the operation or capability of defence sites or
assets. The MOD notes that their assessment
is based on the current submitted documents,
and any amendments to the development may
alter their position.
The Ministry of Defence
comments are noted.
Hillingdon Planning Committee – 11th June 2025
PART 1 – Members, Public & Press
National Air Traffic Services:
National Air Traffic Services (NATS) has
assessed the proposal and raises no
safeguarding objection, confirming that the
development does not conflict with their
technical safeguarding criteria. This response
applies specifically to the current submission
.
The NATS comments are
noted.
Thames Water:
Thames Water raised no objection regarding
the capacity of the foul or surface water
sewerage network infrastructure based on the
submitted information. They recommend that
petrol/oil interceptors be installed in all
parking, washing, and repair areas to prevent
pollution of local watercourses.
The site is located within 15 metres of
Thames Water's underground assets, and the
applicant should refer to Thames Water's
guidance on working near their infrastructure
to avoid potential damage. An informative is
requested to this effect.
In terms of water supply, the site falls within
the area served by Affinity Water, and the
applicant should contact them directly for
related matters.
The Thames Water
comments are noted.
Please see Informative 1.
Transport For London (TfL):
TfL have no strategic transport comments
regarding this application but expect that any
permission is in line with relevant London Plan
Policies.
The TfL comments are
noted.
Please refer to paragraphs
7.79 to 7.93. for
consideration of transport
matters.
Internal Consultation
Planning Policy Officer:
Principle of C2 on site and demolition of
existing residential units is set through recent
permission ref. 76760/APP/2022/1889.
The Planning Policy Officer
comments are noted.
Matters relating to the
principle of development are
addressed in paragraphs
7.1 to 7.8 of this report.
Hillingdon Planning Committee – 11th June 2025
PART 1 – Members, Public & Press
Urban Design Officer:
19-12-24 Initial Comments:
The Urban Design Officer raised concerns
regarding the quality and coherence of the
proposed scheme. The south-east elevation
appears disjointed due to a blank rendered
brick flank wall. The north extension is
generally acceptable. Concerns regarding loss
of Category A tree. Recommends a one-for-
one tree replacement and enhanced planting,
particularly within the car park to soften its
impact. The main entrance lacks prominence
and architectural expression and could benefit
from a more refined design. Materials are
broadly acceptable, but render should be
limited and use a roughcast finish. Dormer
detailing and landscaping may be secured by
condition.
Revisions were received which addressed the
blank flank wall. Entrance and dormer details
were received. Materials would be secured by
condition.
The Tree Officer raised an objection to the
loss of the Category A tree and revisions were
sought to address this.
29-04-25 Response and Revised
Proposals:
In response to the feedback, the applicant has
made several improvements and has
simplified the roof form. The Category A tree
has been retained within the scheme and
updated Tree Survey has been provided. The
changes sufficiently address the concerns,
subject to conditions to ensure high-quality
design.
The Urban Design Officer
comments are noted.
Matters relating to design
are addressed in
paragraphs 7.9 to 7.17 of
this report.
Please also refer to
paragraphs 7.54 to 7.56 for
consideration of tree and
landscaping matters.
The final design details of
the materials and landscape
scheme are proposed to be
secured by Conditions 16
and 14.
Access Officer:
The Accessibility Officer raised no
fundamental objections to the proposed 81-
bedroom care home, noting that some pre-
application advice had been incorporated. The
building provides step-free access from both
Pield Heath Avenue and Pield Heath Road,
and includes 19 car parkin
g spaces, three of
The Access Officer
comments are noted.
Matters relating to car
parking are addressed in
paragraphs 7.79 to 7.93 of
this report.
Hillingdon Planning Committee – 11th June 2025
PART 1 – Members, Public & Press
which appear to be fully accessible. Concerns
were raised regarding the number of car
parking spaces and the lack of provision for
door-to-door transport vehicles. To ensure
compliance with relevant accessibility
standards, conditions are recommended
requiring the inclusion of a fire evacuation lift
in line with London Plan policies D5 and D12,
and the provision of at least one accessible
ensuite guestroom in accordance with the
Care Inspectorate Design Guide (2022).
Please refer to Condition 18
and Condition 21.
Highways Officer:
A Transport Statement supports the
application for an 81-bed care home at 12–18
Pield Heath Road and 2 Pield Heath Avenue,
Uxbridge.
The site, mostly cleared except for No. 12,
was previously a B&B and four houses. Two
existing access points (from Pield Heath Road
and Pield Heath Avenue) will be retained and
upgraded into a one-way system, reducing
vehicle conflict and improving safety.
The scheme provides 19 parking spaces
(including disabled and EV bays), an
ambulance bay, and delivery space, in line
with local and London Plan standards. A
parking ratio of 1:4.3 matches a previous 60-
bed approval. Cycle and mobility scooter
parking are also included.
With a PTAL of 3 and good access to public
transport, the development supports
sustainable travel. Trip generation is expected
to remain low, with a minor increase over the
previous scheme, posing no network impact.
No safety concerns were identified in the five-
year collision data review.
A Travel Plan will encourage sustainable
transport for staff and visitors. The access,
parking and servicing arrangements are
considered safe and policy compliant.
The Highway Authority raises no objections
sub
ject to conditions regarding Parking
The Highways Officer
comments are noted.
Matters relating to transport
are addressed in
paragraphs 7.79 to 7.93 of
this report.
Please see ‘Summary of
Recommendation’ section
for confirmation that a travel
plan would be secured by a
Section 106 legal
agreement. Refer to Head of
Term V.
Please refer to Conditions 4,
14, 18, 20 and 24.
Please refer to Informative
2.
Hillingdon Planning Committee – 11th June 2025
PART 1 – Members, Public & Press
Design and Management Plan, car and cycle
parking, EV charging, construction
management, and informatives. A travel plan
to encourage sustainable modes of transport,
to be secured by S106 Legal Agreement.
Air Quality Officer:
The proposed development is located within
the LBH Air Quality Management Area and
within close proximity to the Hillingdon
Hospital and Uxbridge Road Focus Areas.
While the development meets air quality
neutral standards, it does not meet the air
quality positive standard required in or near
Focus Areas under the London Plan and
LBH’s Air Quality Local Action Plan (2019–
2024).
A total damage cost of £70,338 has been
calculated, with standard mitigation measures
applied (Travel Plan and Green Measures),
resulting in a final Section 106 contribution of
£52,754 to offset the impact. No objection,
subject to conditions and contribution.
The Air Quality Officer
comments are noted.
Please see ‘Summary of
Recommendation’ section
for confirmation that a travel
plan would be secured by a
Section 106 legal
agreement. Refer to Head of
Term II.
Please also refer to
Conditions 26 and 27.
Flooding and Drainage Specialist:
Following the receipt of additional information,
the Flooding and Drainage Specialist raises
no objection, subject to conditions.
The Flooding and Drainage
Specialist comments are
noted.
Matters relating to flood and
water management are
addressed in paragraphs
7.68 to 7.75 of this report.
See conditions 6 and 7.
Noise Specialist:
The Noise Specialist raises no objection,
subject to the re-imposition of the conditions
applied to the previous planning permission.
The Noise Specialist
comments are noted.
Matters relating to noise are
addressed in paragraphs
7.44 to 7.47 of this report.
Please also refer to
Conditions 8 and 10 of this
report.
Hillingdon Planning Committee – 11th June 2025
PART 1 – Members, Public & Press
Contaminated Land Officer:
The Contaminated Land Officer has no
objection but recommends a condition
requiring a contamination remediation scheme
(including asbestos) to be approved by the
LPA before development commences,
excluding demolition and initial ground works.
Any new contamination discovered must be
addressed with an updated scheme. A
verification report confirming remediation
completion must be submitted prior to
discharging the condition. Imported soils must
be tested for contamination.
The Contaminated Land
comments are noted.
Matters relating to land
contamination are
addressed in paragraphs
7.76 to 7.78 of this report.
Please also refer to
Condition 19.
Waste Strategy Officer:
The developer should provide 9 bulk bins
(split between refuse and recycling) and
ensure communal food waste bins are
included to serve all residents. The bin store
must be located no more than 10m from the
collection point to allow safe and efficient
access for collection crews. The access path
must be smooth, at least 2m wide, and have a
gradient of less than 1:12.
Noted.
Details secured by
Condition 15.
Tree and Landscape Officer:
15-01-25 Initial Comments:
The Trees and Landscape Officer raises
objection, clarification and amendments. All
drawings must consistently show which trees
are to be retained or removed and include
Root Protection Zones (RPZs). The A-
category tree must be retained and treated as
a constraint of the development. Southern
boundary tree planting should extend the full
length of the hedgerow, with trench extents
and construction details confirming soil
volume. The northern planting bed must be to
a minimum of 500mm. Trees on the eastern
boundary should be retained. Proposed
garden trees appear too closely spaced,
mature canopy sizes must be shown. Car park
layout should be amended to introduce more
tree and planting. The planting strip along the
southern buildin
g edge should be widened, in
Noted. The concerns raised
throughout this process
have been addressed by the
applicant.
Please also refer to
Conditions 14 and 25.
Hillingdon Planning Committee – 11th June 2025
PART 1 – Members, Public & Press
line with the previously approved condition
discharge plan.
Following the comments, the applicant team
clarified tree planting and landscaping details.
The Cat A tree is proposed to be retained.
15-05-25 Response and Revised
Proposals:
The Trees and Landscape Officer raises no
objection, subject to the following clarifications
and amendments. The removal of Leylandii
trees (T03, T04, T05, T08, T09) is acceptable,
provided they are replaced with native
species, must be confirmed in the planting
plan. Removal of the U category apple tree
(T15) is also accepted, subject to the planting
of a large replacement street tree. The
proposed tanking will impact 40% of T14’s
RPZ, which is likely to result in the tree’s loss,
only acceptable if new trees are planted in a
trench outside the tank zone with sufficient
soil volume. T13 must be retained, and
tanking adjusted accordingly. Level changes
around T01 should be avoided; an updated
landscape plan is required to address this.
Revisions and updated landscaping plans
were received.
21-05-25 Response and Revised
Proposals:
The applicant provided revised landscaping
plans which address the concerns raised,
subject to compliance and conditions.
Biodiversity Net Gain (Head of
Environmental Specialists):
The loss of the pond is regrettable and could
only be accepted if adequately justified.
Noted.
Please refer to paragraphs
7.57 to 7.64 regarding BNG
and Condition 12.
7 Planning Assessment
Land Use Principles
Use
Hillingdon Planning Committee – 11th June 2025
PART 1 – Members, Public & Press
7.1 The application proposes the demolition of existing buildings on site and the
erection of a purpose-built 81-bed care home (Use Class C2). A previous
permission (Ref: 76760/APP/2022/1889) was granted in 2023 for a 60-bed care
home on the site, and this extant permission is a material consideration in the
assessment of the current application.
7.2 The National Planning Policy Fr amework (NPPF 2024) at paragraph 124
encourages planning decisions to promote the effective use of land in meeting
the need for homes and other uses, wh ile safeguarding and improving the
environment and ensuring healthy living c onditions. Paragraph 125c further
states that substantial we ight should be given to t he value of using suitable
brownfield land within settlements for homes and other identified needs. The
application site is previ ously developed land in an es tablished residential area,
and as such, is considered suitable in principle for redevelopment to meet
housing and care needs.
7.3 London Plan Policy GG2 (Making the Be st Use of Land) and Policy GG4
(Delivering the Homes Londoners Need) require that development proposals
optimise the use of land, particularly in locations with good access to services
and infrastructure and promote higher density development where appropriate.
The site lies within an accessible loca tion, close to Hillingdon Hospital, which
further supports the principle of delivering health-related residential
accommodation in this location.
7.4 Policy H13 of the London Plan (Specialis t Older Persons Housing) recognises
the important role that care homes pl ay in meeting housing needs for older
people and confirms that schemes fallin g within Use Class C2 can contribute
towards borough housing targets on a 1:1 basis, with each bedroom counted as
a home. The proposed develop ment would result in a gain of 21 additional
bedrooms over the extant sc heme, equating to a net gain of 20 new dwellings
and thereb
y contributing to the borough’s housing supply.
7.5 While the current proposal involves t he loss of four dwellings (Use Class C3) and
one B&B (Use Class C1), it is noted this is one additional family sized unit than
previously approved. London Plan Policy H8 and Policy DMH 1 of the Hillingdon
Local Plan: Part Two – Development Management Policies (2020) allows for the
loss of residential units where they ar e replaced with equivalent or greater
residential floorspace and where redevel opment contributes positively to
housing delivery. The proposed scheme would deliver 3, 829 sqm of C2
floorspace, a significant uplift over t he combined 1035.9 sqm of the existing
buildings (C3 and C1), representing a net increase of 2,793.1 sqm. In this
context, alongside the overall net gain of 76 units, the loss of four dwellings and
one B&B is considered justified and acceptable.
7.6 Policy DMH 8 of the Hil lingdon Local Plan supports the provision of care homes
where they do not lead to an overconc entration of similar uses and where the
development integrates appropriately into its residential setting. Although there
are other care facilities in the wider area,
given the previous permission on site
Hillingdon Planning Committee – 11th June 2025
PART 1 – Members, Public & Press
the proposal is not considered to result in overconcentration, and the residential
character of the surrounding area would remain intact.
7.7 The applicant has submitted an updat ed Needs Assessment which outlines
continued demand for care home beds locally and refers to engagement with
Hillingdon Hospital. The assessment refe rences the Council’s most recent
Strategic Housing Market Assessment (SHMA), which underlines the borough-
specific demographic data dem onstrating the projected growth in the over-65
and over-85 age groups. It is also cons idered that there is an established
London-wide need for care home accommodation (as set out in the London
Plan). The proposal would help to address this recognised need in a suitable and
sustainable location.
Conclusion
7.8 In light of the above a nd having regard to the fallba ck position afforded by the
extant 60-bed care home permission, the pr oposed intensification of the site to
provide an 81-bed care facility is cons idered acceptable in principle. The
proposal aligns with national, regional and local planning policy objectives to
optimise land, deliver specialist housin g, and support sustainable patterns of
development. Accordingly, there is no in-principle objection to the redevelopment
of the site for a larger care home, subj ect to consideration of other material
plannin
g issues.
Design
Impact on the Character and Appearance of the Area
7.9 Policies D3 of the London Plan (2021), BE1 of the Hillingdon Local Plan: Part 1
(2012), DMHB 11 and DMHB 12 of the Hillin gdon Local Plan: Part 2 (2020) are
all directly relevant to the proposal. T hese policies can be read in full in the
Committee Report Part 3 - Policy Appendix, and in summary, seek to secure a
high quality of design that enhances and contributes to the area in terms of form,
scale and materials, is appropriate to t he identity and context of the townscape
and would improve the quality of the public realm and respect local character.
These aims are also supported b
y the NPPF (2024) at chapter 12.
7.10 The application seeks permission for the demolition of all existing buildings and
structures on site, including Nos. 2 Pield Heath Avenue and Nos. 12, 14, 16 and
18 Pield Heath Road, to facilitate the construction of a part two, part three-storey
(plus basement level), 81-bedroom care home.
7.11 The existing buildings comprise a mix of single and two-storey dwellings,
broadly representative of the prevailing built form in the surrounding area. No.
2 Pield Heath Avenue and Nos. 12 and 18 Pield Heath Road are single-storey
bungalows, consistent in scale and appearance with neighbouring properties
on Pield Heath Avenue. Nos. 14 and 16 Pield Heath Road are two-storey semi-
detached dwellings, more reflective of the broader character of Pield Heath
Road, which includes a greater variety of building heights and typologies.
Hillingdon Planning Committee – 11th June 2025
PART 1 – Members, Public & Press
7.12 While the existing buildi ngs make a modest but posit ive contribution to local
character through their consistency and verdant setting, they are not of particular
architectural or historic merit. Given the strategic policy direction to optimise land
use in sustainable locations, and subjec t to a high-quality replacement scheme
that respects the local context, the loss of these buildings is not considered
harmful in principle.
7.13 The consented scheme (ref. 76760/APP/ 2022/1889) comprises a building with
its principal frontage facing Pield Heat h Avenue and a secondary frontage to
Pield Heath Road. The current proposal seeks to extend the south-eastern wing
of the building. Similar to the cons ented scheme, the pr oposal would be a
predominantly three-storey el evation, which transitions to two storeys towards
the neighbouring residential properties on Pield Heath Avennue and Pield Heath
Road. A comparison between the street scene elevations of the approved and
proposed schemes can be seen in Figur es 4 and 7 above. Amendments were
sought during the course of this application and subsequently made to ensure a
more sensitive relationship with the surro unding built form, providing a clearer
and more gradual step down in scale that better reflects the established
residential character of the area.
7.14 Whilst the proposed scale does exceed that of the neighbouring bungalows
along Pield Heath Avenue, the site's corner location where two distinct character
areas meet, offers a degree of flexibility in accommodating the scale. Pield Heath
Road provides a suitable context for a more substantial built form, as previously
approved in the consented scheme. The proposed development responds to this
setting by aligning with and stepping down to mediate the transition to the lower-
scale residential properties.
7.15 The additional rear elem ent (adjacent to 2 Pield Heath Avenue) is single-storey
in scale and positioned along the northern boundary of the site. Revisions were
sought to refine the footprint of this part of the building in order to facilitate the
retention of a high-quality Category A tr ee, which forms an integral part of the
revised scheme.
7.16 Materials will be import ant to ensure the scheme is of a high quality and
integrates appropriately within its context, secured by condition.
7.17 Therefore, in conclusi on, the information submitted is considered to sufficiently
demonstrate that the development would not be harmful to the street scene and
would instead harmonise with the visual amenities of the area. Subject to the
recommended condition, the development is considered to accord with the
requirements of Policy BE1 of the Hilli ngdon Local Plan: Part 1 (2012), Policy
DMHB 11 of the Hillingdon Local Plan: Part 2 (2020), Policy D3 of the London
Plan
(2021), and paragraph 131 of the NPPF (2023).
Hillingdon Planning Committee – 11th June 2025
PART 1 – Members, Public & Press
Accessibility
7.18 Policy D5 of the London Plan (2021) stat es that development proposals should
achieve the hi
ghest standards of accessible and inclusive design.
7.19 The Council’s Access Officer has review ed the proposal and confirmed that no
si
gnificant accessibility issues have been raised, subject to conditions.
Security
7.20 Policy DMHB 15 of the Hillingdon Local Plan: Part 2 (2020) states that the
Council will require all new development to ensure safe and attractive public and
private spaces by referring to the Council's latest guidance on Secured by
Desi
gn principles. This is supported by Policy D11 of the London Plan (2021).
7.21 A secured by design condition has been recommended to achieve appropriate
accreditation and would be consistent wit h the previous planning permission.
Subject to condition, the proposal would accord wit h Policy DMHB 15 of the
Hillingdon Local Plan: Part 2 (2020) and Policy D11 of the London Plan (2021).
Fire Safety
7.22 Policy D12 of the London Plan (2021) states that all major development
proposals should be submitted with a Fire Statement, which is an independent
fire strategy, produced by a third party, suitably qualified assessor. The
statement should detail how the development proposal will function in fire safety
terms.
7.23 Buildings should be designed to incor porate appropriate features which reduce
the risk to life and the risk of serious inju ry in the event of a fire by being
constructed in an appropriate way to minimise the risk of fire spread. This should
include appropriate fire alarm systems, passive and active fire safety measures,
suitable and convenient means of escape and an associated robust evacuation
strategy which can be periodically updated and published, and which all
occupants can have confidence in. These measures should be set out in a Fire
Strate
gy, prepared by a suitably qualified fire engineer.
7.24 In support of the application, a Fire Statement has been submitted which shows
that a Fire Tender can gain access to the site and manoeuvre around it
adequately. In addition, the plan shows a ll the main escape routes from the
building. Further details of fire safety will be needed at the detailed design stage
of the development process, and these details would be secured by way of
condition. The London Fire Brigade have not raised any specific objections but
have advised that the development s hould accord with Building Regulation
requirements. The final comprehens ive Fire Statement and details
(accompanied by the Building Control Notice) shall be secured by condition.
Subject to this condition, the proposed w ould accord with the requirements of
Polic
y D12 of the London Plan (2021).
Hillingdon Planning Committee – 11th June 2025
PART 1 – Members, Public & Press
Heritage
7.25 The proposed development would not have an impact on any designated or non-
designated heritage assets.
Green Belt
7.26 The northern edge of part of the Green Belt around Colham Green is defined by
Pield Heath Road, and consequently the proposal would sit opposite the Green
Belt. The proposal would fall fully outside the extent of the Green Belt and would
be visually separated by a row of existi ng established trees which line the
southern side of Piled Heath Road. As such, the proposal would have no impact
on the permanent openness of the Green Belt and is acceptable in this regard.
Residential Amenity
Sunlight & Da
ylight Impacts
7.27 Policy DMHB 11 of the Hillingdon Local Plan: Part 2 (2020) states that
development proposals should not adversely impact on the amenity, daylight and
sunlight of adjacent properties and open space.
7.28 Furthermore, the Mayor's Housing SPG sets out that proposals should limit the
harm to neighbouring properties, whilst reco gnising that to comply with policies
seeking the optimal use of land, so me development proposals may be allowed
even where harm has been identified. When assessing impacts related to the
loss of natural light, the Mayor's Hous ing SPG advises that avoiding harm to
habitable rooms is the priority, which ar e usually defined as any room used or
intended to be used for sleeping, cooking, living or eating purposes. Enclosed
spaces such as bathrooms or toilet facilities, service rooms, corridors, laundries,
hallways, utility rooms or si milar spaces are excluded from this definition of
habitable rooms.
7.29 A standardised method of assessment fo r calculating the le vel of impact to
neighbouring buildings is prescribed wit hin the BRE's guide to good practice,
titled 'Site Layout Planning fo r Daylight and Sunlight'. This guidance document
discusses various methods of assessing a proposals impact on access to natural
light, and sets out a number of threshol ds which, if exceeded, would probably
have a noticeable impact on natural li
ght to neighbouring properties.
7.30 It is noted that Sunlight and Day light assessment is based on earlier plans
submitted during this planning applicati on. However, the revisions secured
reduce the scale of the proposal closest to No. 10 Pield Heath Road.
7.31 In addition, when comparing the proposed single storey element adjacent to the
boundary with No. 4 Pield Heath Avenue, the ex isting site situation consists of
multiple single storey outbuildings built up to the shared boundary.
Hillingdon Planning Committee – 11th June 2025
PART 1 – Members, Public & Press
7.32 Fifty-three windows have been assessed within Nos. 1, 3, 4, 5, 7, 9 and 13 Pield
Heath Avenue and No. 10 Pield Heath Road for impacts on levels of daylight
(VSC) and sunlight (APSH), whilst seven gardens (Nos. 1, 3, 5, 7, 9 and 4 Pield
Heath Avenue and No. 10 Pield Heath Road) have been assessed for
overshadowing impacts. The results of this assessment are set out in the
submitted Da
ylight and Sunlight Report (October 2024).
7.33 The results of the submitted assessm ent demonstrate that the proposal would
have a negligible impa ct on any tested window in terms of impacts to daylight,
with all windows expected to retain upwards of 90% of their current daylight.
7.34 In terms of sunlight, the report demonstrates that none of the south facing
neighbouring residential wi ndows will see a noticeab le loss in sunlight.
Additionally, no gardens would exper ience a significant increase in
overshadowing because of the developm ent, with all seven gardens tested
meetin
g BRE guidance standards.
Privacy and Outlook
7.35 There is likely to be some loss of privacy naturally associated with an increase
in density and height, and some level of mutual overlooking is common in
residential areas from windows at first floor level. This is experienced to a lesser
extent on Pield Heath Avenu e as a result of the si ngle-storey scale of the
dwellings, however most properties have been extended into the roof space and
therefore some level of mutual overlooking already exists. Notwithstanding this,
it is recognised that efforts have been made to limit overlooking into neighbouring
properties through the placement and ori entation of windows and separation
distances between facing windows servi ng habitable rooms would exceed 21
metres. The proposed terrace at second floor level has the potential to result in
overlooking, so a condition requiring det ails of privacy screening to be used
along its northern and eastern perimeters is recommended.
7.36 It is further considered, by reason of its relatively modest and varied height
across the plot, together with sufficient s eparation distances, that the proposal
would not result in a significant loss of outlook or lead to a sense of enclosure
for neighbouring residents, notwithstanding that the proposed building would
clearly be more visible than the exis ting buildings from the surrounding
properties.
Summary
7.37 Taking into considerati on the BRE Report, the siting and extent of development
proposed, it is considered that the proposal would not have a significant impact
on the amenit
y of neighbouring residential properties.
Living Conditions fo r Future Occupiers
7.38 Policy D3 of the London Plan states that proposals should deliver appropriate
outlook, privac y and amenit y, provide convenientl y located green and open
Hillingdon Planning Committee – 11th June 2025
PART 1 – Members, Public & Press
spaces for social interaction, play, relaxation and physical activity, help prevent
or mitigate the impacts of noise and poor air quality, and achieve indoor and
outdoor environments that are comfortable and inviting for people to use.
7.39 As the proposal is for a care home, ther e are no relevant in ternal or external
amenity space standards. However, as a form of residential accommodation, it
is nonetheless important to ensure that the resultant development would provide
a high quality of life.
7.40 The proposed layout of r ooms is considered sensible, and appears to be fit-for-
purpose, with the communal areas located broadly in the middle of the building
and the bedrooms either side, which mi nimises corridor lengths and reduces
walking times within the building. Additionally, all bedrooms are provided with an
en-suite bathroom. The bedroom sizes are like the previously approved
application. Whilst not shown on these pr oposed floor plans, the floor plans for
the earlier scheme showed indicative space for a bed, desk and chair to
demonstrate that there would be sufficient internal space for future occupants. It
is reasonable to anticipate the same level and quality of accommodation.
7.41 The proposed basement level would further provide space for activities, shown
on
Drawing No. 300 (Rev. A) as a cinema, pr ivate family room, sensory room, arts
and crafts room, hair and nail salon. In addition, the basement level would
provide essential space for mechanical plant, laundry, kitchen and ancillary
supportin
g offices.
7.42 External amenity space would be provi ded in the form of a communal garden at
ground floor level, creating a partially enclosed courtyard to the east of the
proposed building, in addition to a small te rrace at second floor level. This is
considered to represent an appropriate le vel of provision, which would provide
valuable and usable external amenity space for future occupiers.
7.43 Overall, it is considered that the living conditions fo r future occupiers would be
acceptable.
Environmental Issues
Noise Impacts
7.44 Policy D14 of the London Plan (2021) states that developm ent should reduce,
manage and mitigate noise to improve health and quality of life. This can be done
by separating noise generating uses from noise sensitive uses. Mitigation can
also be secured through screening, layout, orientation, uses and materials. This
is supported b
y Policy EM8 of the Hillingdon Local Plan: Part 1 (2012).
7.45 In support of the applic ation, a Noise Impact Assessment (September 2024) has
been submitted, which assesses the existing noise conditions at the application
site and the potential suitabi lity of the noise environm ent for the proposed care
home use.
Hillingdon Planning Committee – 11th June 2025
PART 1 – Members, Public & Press
7.46 This report, whilst relatively generic in its approach, identifies that there are some
noise constraints associated with the si te. However, the assessment further
demonstrates that noise levels around the site should be manageable to allow
an appropriate acoustic environment within the development without significantly
increasing the noise profile of the ar ea. To comply with national policy and
industry good practice, the Council’s No ise Officer has recommended that the
same conditions secured in the earlier planning permission be reapplied to this
application. These conditions include further discussion on good acoustic design
as an update to the Noise Impact Assessment, a sound insulation scheme and
details of any building services mechani cal plant associated with the operation
of the care home with potential to emit sound external to the buildin
g.
7.47 Therefore, subject to conditions, t he development would accord with Policy EM8
of the Hillingdon Local Plan: Part 1 (2012), Policy DMHB 11 of the Hillingdon
Local Plan: Part 2
(2020) and Policy D14 of the London Plan (2021).
Odour
7.48 Policy EM8 of the Hillingdon Loc al Plan: Part 1 (2012) states that the Council will
seek to safe
guard and improve all land, water, air and noise quality.
7.49 It is noted that paragraph 201 of the NPPF (2024) st ates that the focus of
planning decisions should be on whet her proposed development is an
acceptable use of land, rather than the control of processes or emissions (where
these are subject to separate polluti on control regimes). Planning decisions
should assume that these regimes will operate effectively.
Air Quality
7.50 Policies SI 1 of the London Plan (2021), EM8 of the Hillingdon Local Plan: Part
1 (2012) and DMEI 14 of the Hillingdon Local Plan: Part 2 (2020) are all directly
relevant to the proposal. These policie s can be read in full in the Committee
Report Part 3 - Policy Appendix, and in summary, seek to safeguard and improve
air quality in order to protect existing and new sensitive receptors. These aims
are also supported b
y the NPPF (2024) at chapter 15.
7.51 According to the London Plan, developm ents must be air quality neutral at
minimum, with LBH requiring air quality positive contributions in Focus Areas as
per the LBH Air Quality Local Action Plan 2019-2024. Policy DMEI 14 of the
emerging Hillingdon Local Plan (Part 2) fu rther supports this, emphasizing the
need for contributions to local air quality improvement.
7.52 The proposed development is loca ted within the London Borough of Hillingdon
AQMA and within the catchment area of two AQFAs (Hillingdon Hospital FA, 345
metres away) and (Uxbridge Road, 452 metres away), bringing additional traffic
emissions which will add to current poor air quality.
Hillingdon Planning Committee – 11th June 2025
PART 1 – Members, Public & Press
7.53 In accordance with the LBH Local Acti on Plan, the total emissions associated
with the development must be mitigated. The level of required mitigation for the
operational phase, calculated using De fra's Damage Cost Approach, amounts
to ££52,754. This will be secured vi a a S106 agreement to ensure the
development meets the necessary air quality standards (please refer to S106
Head of Term II), alongside condition 26 and 27 for the reduction of emissions
during construction and specifications for the use of non-road mobile machinery
during construction, the development would accord with Policy EM8 of the
Hillingdon Local Plan: Part 1 (2012), Policy DMEI 14 of the Hillingdon Local Plan:
Part 2 (2020), Policy SI 1 of the London Plan (2021) and the NPPF (2025).
Trees and Landscaping
7.54 Policies G1 and G5 of the London Plan (2021), DMEI 1, DM HB 11 and DMHB
14 of the Hillingdon Local Plan: Part 2 (2020) are all directly relevant to the
proposed development. These policies ca n be read in full in the Committee
Report Part 3 - Policy Appendix, and in su mmary, seek to safeguard existing
trees and deliver high quality landsc aping in order to enhance amenity,
biodiversity and green infrastructure. Th ese aims are also supported by the
NPPF (2025) at chapter 12.
7.55 There are several trees within the ca r park, courtyard and around the edges,
none of which are protected by TPOs or Conservation Area designations. An
Arboricultural Report has identified and a ssessed the loss of trees required to
redevelop the site. Revisions were sought to retain a Category A tree, however,
it is recognised that where trees are still to be lost, it is necessary to facilitate
redevelopment, and overall, subject to suitable replacement landscaping, none
of the other existing tr ees to be lost could be co nsidered a constraint to
development due to their relativel
y limited landscape value.
7.56 The final details of hard and soft landscaping are proposed to be secured by
condition to ensure that the landscape scheme to be delivered is high quality and
retained in the long term. S ubject to this condition, the proposal would accord
with Policies DMHB 11 and DMHB 14 of the Hillingdon Local Plan: Part 2 (2020).
Biodiversity Net Gain
7.57 The Environment Act 2021 has establishe d that all planning permissions granted
in England have to deliver at least 10% BNG from January 2024. Paragraph 187
of the NPPF (2025) also states that planning decisions should contribute to and
enhance the natural and loca l environment by: d) minimising impacts on and
providing net gains for biodiversity, including by establishing coherent ecological
networks that are more resilient to cu rrent and future pressures. This is
supported by Policy G6 of the London Pl an (2021) and Policy DMEI 7 of the
Hillin
gdon Local Plan: Part 2 (2020).
7.58 The submitted Biodiversity Metric calc ulations indicate a post-development net
gain of +0.53 habitat uni ts and +0.06 hedgerow unit s, equating to a 94.96%
increase in habitat biodiversity and a 66.49% increase in hedgerow biodiversity
Hillingdon Planning Committee – 11th June 2025
PART 1 – Members, Public & Press
compared to the baseline. These gains are primarily delivered through the
creation of new grassland habitats, t he planting of scattered trees, and the
integration of introduced shrub areas across the site.
7.59 Despite the overall net gain in units, t here was initial concern that the proposal
did not meet the trading rules of the Biodiversity Metric due to the loss of a pond
habitat. However, the updated metric confirms that off-site BNG units would be
purchased to address this shortfall, thereby ensuring compliance with the trading
rules.
7.60 The applicant team have provided a detailed justificat ion for the exclusion of a
pond within the on-site scheme. The applicant has stated that as an experienced
operator of care homes nati onally, they highlight si gnificant health and safety
risks associated with incorporating a pond in a care home environment. This
includes the potential risk of drowni ng, infection control concerns, and
accessibility limitations for residents with complex needs, including severe
dementia and limited mobilit
y.
7.61 The operator notes that the Equality Act, which encompasses the Disability
Discrimination Act (DDA), requires equal access and service provision for all
residents. The inclusion of a pond would necessitate restricted access to parts
of the garden area, which would be incom patible with a barrier-free, fully
accessible landscape that supports residents’ well-being and therapeutic use of
outdoor space. The resulting desi gn without the pond allows for a
comprehensive and inclusive landscapi ng scheme, which better serves the
needs of all future residents.
7.62 On balance, whilst the loss of the on-si te pond is noted, officers consider the
justification provided, including the safeguarding of vulnerable residents and the
operator’s duty of care, to be accept able. The associated BNG outcomes,
supported by off-site compensation, ensure that biodiversity objectives are met
without compromising resident welfare.
7.63 A 30-year Habitat M anagement and Monitoring Plan (HMMP) would be secured
via condition to ensure the long-term delivery of biodiversity enhancements, both
on- and off-site.
7.64 Taking into account the off-site unit purchase, the scheme is considered to
comply with national and local policy, including the National Planning Policy
Framework (NPPF 2024), the London Borough of Hillingdon Local Plan, and the
statutory requirement for a minimum 10% Biodiversity Net Gain under the
Environment Act 2021.
Urban Greening Factor
7.65 Policy G5 of the London Pl an (2021) states that ma jor development proposals
should contribute to the greening of London and that the ta rget score for
commercial development is 0.3. Resident ial developments have a target score
of 0.4.
Hillingdon Planning Committee – 11th June 2025
PART 1 – Members, Public & Press
7.66 In line with Policy G5 of the London Plan (2021), ma jor development proposals
are expected to contribute to the gr eening of London. The applicant should
maximise greening opportunities on the site.
7.67 The proposed development is predict ed to achieve a UGF score of 0.36 as
shown on Drawing No 9155 P02 which is likely to manifest as a range of benefits
such as improved health for future o ccupiers, climate change adaption and
biodiversity conservation. Whilst this is marginally below the policy target of 0.4
for a purely residential development as set out in Policy G5 of the London Plan,
the proposal would incor porate a range of vegetatio n and planting as well as
green roofs to optimise t he amount of greening propos ed on the site. While
separate, it is also noted that the proposal would m eet Biodiversity Net Gain
(BNG) requirements, albeit with some o ff-site provision. On-balance, it is
considered that the proposed greening for the site is acceptable. A condition has
been included to secure compliance with the UGF details. The proposal would
therefore generally accord with Policy G5 of the London Plan (2021) and Policy
DMHB 14 of the Hillingdon Local Plan: Part 2 (2020).
Flood risk
Drainage
7.68 Policy SI 13 of the London Plan (2021) al so requires that development proposals
utilise sustainable urban drainage system s (SuDS) unless there are practical
reasons for not doing so and should aim to achieve greenfield run-off rates and
ensure that surface water run-off is managed as close to its source as possible.
This is supported by Policy EM6 of the Hillingdon Local Plan: Part 1 (2012) and
Polic
y DMEI 10 of the Hillingdon Local Plan: Part 2 (2020).
7.69 The application site falls within flood z one 1, which is at the lowest risk of
flooding, and is also not located in an area identified as being at risk of surface
water flooding. Moreover, the application site is already extensively developed
with limited attenuation of run off.
7.70 The proposed drainage strategy is considered to be proportionate to the
scheme's size and maximises the opportuni ties available for sustainable water
mana
gement on-site.
7.71 A drainage assessment has been provi ded detailing the drainage measures
which include a below-ground attenuatio n tank. The Council's Flooding and
Drainage Specialist has confirmed no objection to the proposed drainage
strategy, subject to the necessary
Text extracted automatically from the PDF, so layout, tables and images are not shown. Only the start of this long document is shown here. Open the original PDF on LB Hillingdon’s website.