Hillingdon Planning Committee – 17.07.2025
PART 1 – Members, Public & Press
Report of the Head of Development Management and Building Control
Committee Report
Case Officer: Alan Corcoran 957/APP/2024/2765
Date Application
Valid:
19.11.2024 Statutory / Agreed
Determination
Deadline:
18.06.2025
Application
Type:
Full Ward: Uxbridge
Applicant: PJN Properties Ltd
Site Address: Island Site, Eskdale Road, Uxbridge, UB8 2RT
Proposal: Redevelopment of site to provide new
commercial buildings for use within Classes
E(g)(iii) / B2 / B8 together with associated
infrastructure on site, to include landscaping,
access, servicing, and parking.
Summary of
Recommendation:
GRANT planning permission subject to section
106 legal agreement and conditions
Reason Reported
to
Committee:
Required under Part 1 of the Planning Scheme of
Delegation (Major application recommended for
approval)
Hillingdon Planning Committee – 17.07.2025
PART 1 – Members, Public & Press
Summary of Recommendation:
GRANT planning permission subject to the conditions set out in
Appendix 1.
Section 106 Heads of Terms are as follows:
1. Air Quality Mitigation contribution of £91,413.
2. A Carbon Offset contribution of £41,850.
3. An Employment/Construction Training Scheme secured in accordance with the
Council's Planning Obligations SPD.
4. ‘Be Seen’ post-construction energy monitoring to be carried out in accordance
with the GLA ‘Be Seen’ Energy Monitoring Guidance London Plan Guidance
Documents (2021).
5. A Project Management and Monitoring Fee, equalling 5% of the total financial
contributions to be paid under this agreement.
1 Executive Summary
1.1 The Site (‘Island Site’) consists of an existing block of single-storey buildings with
a floor area of 3,571 sq. m . facing Eskdale Road. T he Site is within the wider
Uxbridge Industrial Estate, which is designated as a Strategic Industrial Location
(SIL). It is on Potentially Contaminated Land and within an Air Quality
Management Area (AQMA) and Archaeological Priority Areas (Colne Valley).
1.2 The proposal consists of demolishing the existing 3,571 sq. m. buildings and
constructing 2,850 sq. m. of replacement warehouse floor space (two units),
including 445 sq. m. of ancillary office accommodation.
T he proposed built
footprint would be 721 sq. m. less than the existing, and there would be no change
of use. These would be two equally sized
warehouse-style units with mezzanine
levels.
1.3 The principle of redeveloping commercial buildings for use within Classes E(g)(iii)/
B2/B8 within a Strategic Indu strial Location (SIL) is supported. The building’s
height, scale, and mass are well -suited to the surrounding industrial estate
context. The Local Planning Authority has worked with the Applicant to refine the
development’s design during the full planning application process, securing
additional planting and relocation and reduction of car parking to ensure highway
safety. Following receipt of r evisions, there are no objections from the Council’s
Urban Design Officer, Landscape Officer, or Highways Officers. While located on
Potentially Contaminated Land, the Council’s Land Contamination Officer has no
concerns subject to the recommended condition. Similarly, whilst within an
Archaeological Priority Area (Colne Valley), Historic England’s Greater London
Archaeological Advisory Service (GLAAS) has no objection subject to
recommended conditions. Noting the Air Quality Management Area (AQMA),
which the Site is within, the Council’s Air Quality Officer has no objections subject
Hillingdon Planning Committee – 17.07.2025
PART 1 – Members, Public & Press
to an air quality mitigation contribution of £91,413 (contained within the Section
106 Heads of Terms) and planning conditions, which have been recommended.
1.4 The Local Planning Authority received no comments from the public regarding the
proposal.
1.5 The proposal is acceptable and would be co nsistent with the National Planning
Policy Framework, The London Plan, and the Hillingdon Local Plan.
1.6 The planning application is therefore recommended for approval subject to the
conditions contained in Appendix 1 and Section 106 Heads of Terms detailed on
the previous page.
2 The Site and Locality
2.1 The Site (‘Island Site’) consists of an existing block of single -storey buildings
facing Eskdale Road. The existing buildings (3,571 sq. m.) consist of an ad-hoc
arrangement of dated brick -built warehouse buildings. Various commercial
operators, including offices, light industrial, general industrial, and
warehousing/distribution, have previously occupied the units.
2.2 The entirety of the Site is within the wi der Uxbridge Industrial Estate, which is
designated as a Strategic Industrial Location (SIL). It is on Potentially
Contaminated Land and within an Air Quality Management Area (AQMA) and
Archaeological Priority Area (Colne Valley). The Site is not Listed n or located
within a Conservation Area or Area of Special Local Character. The Environment
Agency’s Flood Map confirms it is within Flood Zone 1 - the lowest probability of
flooding.
2.3 There is no on-site parking. Pavement parking is prevalent in the area. The closest
bus stop is along St John’s Road (circa eight -minute walk), which supports the
Number 3 and 583 bus routes. The Site has a Public Transport Accessibility
(PTAL) of 0, where a score of 0 indicates very poor access to public transport and
6 indicates excellent access.
2.4 The Industrial Estate comprises a mix of commercial uses of varying designs and
massings, including new warehouses to the east of the Site and south of Ashely
Road, along with older-style warehouses surrounding the Site.
2.5 The closest residential is located to t he east of the Site adjacent to Cowley Mill
Road (approximately 100 metres north).
2.6 The nearest residential properties are Cowley Mill Road (approximately 100
metres north) and Hilton Close (approximately 120 metres north-east).
Hillingdon Planning Committee – 17.07.2025
PART 1 – Members, Public & Press
Figure 1: Location Plan (application site edged red)
Figure 2: Aerial View of the Application Site
Figure 3: Street View Images of the Application Property
Hillingdon Planning Committee – 17.07.2025
PART 1 – Members, Public & Press
View from Eskdale Road
View from Eskdale Road
3 Proposal
3.1 The application seeks planning permission to redevelop the Site to provide new
commercial buildings for use within Classes E(g)(iii)/B2/B8 together with
associated infrastructure on site, to inc lude landscaping, access, servicing, and
parking.
3.2 The Applicant would demolish the existing 3,571 sq. m. buildings and construct
2,850 sq. m. of replacement warehouse floor space (two units), including 445 sq.
m. of ancillary office accommodation. As such, the proposed built footprint would
be 721 sq. m. less than the existing, and there would be no change of use. These
would be two equally sized (approximately 43 metres wide and 29 metres deep)
warehouse
-style units with mezzanine levels (approximately 237 sq. m. each). The
building heights would be approximately 11 .5 metres to the ridge (an increase in
height of 2.75m from the existing ridge height) and 9.7 metres to the eaves height.
The units would be clad with Micro Rib composite cladding (charcoal RAL 7024
and silver RAL 9006) and Curvewall composite cladding (charcoal RAL 7024) and
Hillingdon Planning Committee – 17.07.2025
PART 1 – Members, Public & Press
have profiled roof cladding (grey). There would be powder-coated aluminium-
framed windows and doors (basalt RAL 7012).
3.3 Each of the two service yards (Unit 1 an d Unit 2) would contain 12 car parking
spaces, including one disable person bay and four active electric vehicle charging
points. Each service yard would also contain sixteen secure and covered cycle
parking spaces and a bin enclosure. Addit ional planting is proposed to the north
and south of the Site. The Site would be enclosed by a 2.4m high perimeter paladin
fence. Alterations to the access arrangements are proposed, with the one existing
access closed and two points of access created on Eskdale Road.
Figure 4: Proposed Plan (please note – larger version of plan can be found in
the Committee Plan Pack)
Proposed Site Plan
Hillingdon Planning Committee – 17.07.2025
PART 1 – Members, Public & Press
Proposed Landscape Plan
Proposed Front and Side Elevations
Hillingdon Planning Committee – 17.07.2025
PART 1 – Members, Public & Press
Proposed Rear and Side Elevations
Proposed 3-D Visual from the Service Yard
4 Relevant Planning History
4.1 A list of the relevant planning history related to the property can be found in
Appendix 2.
5 Planning Policy
5.1 A list of planning policies relevant to the consideration of the application can be
found in Appendix 3.
Hillingdon Planning Committee – 17.07.2025
PART 1 – Members, Public & Press
6 Consultations and Representations
6.1 The Council sent consultation letters to 91 neighbouring properties on 22-11-24.
The Council also advertised the application with a site notice and press notice on
04-12-24. The initial consultation expired on 27-12-24.
6.2 The Council received no representations in response to public consultation.
Consultee responses received are summarised in Table 2 (below). Full copies of
the responses have also separately been made available to Members.
Table 1: Summary of Representations Received
Representations Summary of Issues
Raised
Planning Officer
Response
N/A N/A N/A
Table 2: Summary of Consultee Responses
Consultee and Summary of Comments
Planning Officer
Response
External Consultee Comments
Greater London Archaeological Advisory Service
(GLAAS):
No objection subject to condition and informative
regarding a Written Scheme of Investigation.
A condition and
informative have been
recommended in line
with GLAAS’
recommendations.
Internal Consultee Comments
Urban Design Officer:
No objection
. Request to amend boundary treatment.
A c
ondition has been
recommended in line
with the Urban Design
Officer’s
request.
Landscape Officer:
No objection
subject to landscape maintenance plan.
A c
ondition has been
recommended in line
with the Landscape
Hillingdon Planning Committee – 17.07.2025
PART 1 – Members, Public & Press
Officer’s
recommendations.
Economic Development:
No objection subject to an Employment/Construction
Training Scheme secured in accordance with the
Council's Planning Obli gations SPD via a S106
Agreement.
This request is a
recommended Heads
of Terms to be
secured in the S106
Agreement.
Accessibility Officer:
No objection subject to a condition regarding one fire
evacuation lift per unit.
A condition has been
recommended in line
with the Accessibility
Officer’s
recommendations.
Refuse and Recycling Officer:
No objection.
Noted.
Planning Policy Officer:
No objection
subject to condition regarding use
restriction.
A condition has been
recommended in line
with the Planning
Policy Officer’s
recommendations.
Highways Officer:
No objection subject to
a condition regarding vehicle
access to the south.
A condition ha
s been
recommended in line
with the Highways
Officer’s
recommendations
regarding the
vehicle
access to the south.
Air Quality Officer:
No objection subject to an Air Quality Mitigation
contribution of £
91,413 secured by a Section 106
Agreement and conditions regarding a Low Emission
Strategy (LES) and reducing emissions from
demolition and construction.
A S106 financial
contribution is
included in the
recommended Heads
of Terms and
conditions have been
Hillingdon Planning Committee – 17.07.2025
PART 1 – Members, Public & Press
recommended in line
with the Air Quality
Officer’s
recommendations.
Noise Pollution Officer:
No objection subject to conditions regarding the noise
impact of the proposed development on the existing
environment, as well as
an informative regarding
external noise.
A condition has been
recommended in line
with the Noise
Officer’s
recommendations.
Environmental Health Officer (Land
Contamination):
No objection subject to a condition regarding land
contamination.
A condition has been
recommended in line
with the Land
Contamination
Officer’s
recommendations.
Environmental Specialist (Energy and
Biodiversity):
No objection subject to a carbon offset contribution of
£41,850 and ‘be seen’ energy monitoring obligation
secured by a S106 Agreement and condition
regarding
energy, biodiversit y, and habitat
management.
A S106 financial
contribution and ‘be
seen’ obligation are
included in the
recommended Heads
of Terms.
Recommended
conditions secure
energy, biodiversity,
and
habitat
management.
Flood Risk and Drainage Consultant:
No objection subject to Sustainable Water
Management and Sustainable Drainage Scheme
Evidence
planning conditions.
Conditions have been
recommended in line
with the Flood Risk
and Drainage
Consultant’s
recommendations.
Hillingdon Planning Committee – 17.07.2025
PART 1 – Members, Public & Press
7 Planning Assessment
Principle of Development
7.1 The Site (‘Island Site’) consists of an existing block of single-storey buildings with
a floor area of 3,571 sq. m. facing Eskdale Road. The Site is within the wider
Uxbridge Industrial Estate, which is designated as a Strategic Industrial Location
(SIL).
7.2 The proposal consists of demolishing the existing 3,571 sq. m. buildings and
constructing 2,850 sq. m. modern replacement warehouses (two units), including
445 sq. m. of ancillary office accommodat ion. The proposed built footprint would
be 721 sq. m. less than the existing, and there would be no change of use.
7.3 SIL areas are suitable for intensification and enhancement of land for industrial
purposes. The Council’s Policy Team has reviewed the proposal and have no
policy objections subject to a condition regarding a use restriction to ensure no
wider use with in Use Class E is permitted other than light industrial E(g)(iii). An
appropriate condition is recommended in line with the Policy Team
recommendation.
7.4 The principle of redeveloping commercial buildings for use within Classes E(g)(iii)/
B2/B8 within a Strategic Industrial Location is supported and in accordance with
Policy E5 of The London Plan and Policies DME 1 and DME 2 of Hillingdon Local
Plan - Part 2.
Design / Impact on the Character and Appearance of the Area
7.5 The Site is within an area of mixed commercial and industrial units. The existing
buildings onsite appear as piecemeal developments that are dated and have
reached
or are approaching the end of their operational life. The proposed
industrial units would harmonise with the local context and would be a significant
improvement to the existing Site. While the proposed development would be one
of the taller buildings in th e immediate area, its height would be respectful of its
context and comparable to neighbouring developments, e.g. a modern warehouse
opposite at the former Trimite Site, which is 16 metres tall. Further, the proposed
buildings would not compromise the amenity of the surrounding buildings or the
public realm. Therefore, the height, scale, and mass are acceptable. The design
intent outlined in the
submitted Design and Access Statement and drawing
number 11565 -M-101 is for high- quality materials consistent with large
warehouses. Th e proposed design, appearance , and external materials are
supported.
7.6 The Council’s Urban Design Officer has been consult ed and has no objections
regarding the proposed design.
7.7 The proposal complies with Paragraph 131 of the NPPF, Policies D3 of The
London Plan, Policy BE1 of the Local Plan Part 1, and Policies DMHB 11 and
DMHB 12 of the Hillingdon Local Plan - Part 2.
Hillingdon Planning Committee – 17.07.2025
PART 1 – Members, Public & Press
Residential Amenity
7.8 The Site is located centrally within the Ux bridge Industrial Estate, a designated
Strategic Industrial Location (SIL), separated by Eskdale Road from surrounding
industrial buildings and use. It
is approximately 115 metres from the nearest
residential properties located northeast of the Site . Furthermore, there would be
no change to the nature of the permitted use onsite, with it continuing to be used
within Class E(g)(iii)/B2/B8. As such, it would continue to
integrate with the uses
in the vicinity.
7.9 The proposal would not impact the outlook, privacy, daylight, or sunlight of
adjacent properties or open spaces, given its height, scale, mass, use, and
location in the centre of an industrial estate away from residential properties.
7.10 Please see relevant sections below regarding noise.
7.11 The proposed scheme is supported and complies with Policy D3 of The London
Plan and Policy DMHB 11 of the Hillingdon Local Plan - Part 2.
Highways and Parking
7.12 Eskdale Road is a two-way single carriageway road that encircles the Site with a
speed hump on each of the four sides of the Site. There are no on-street parking
restrictions and pavement parking is prevalent in the area. There is no formal on-
site car parking. The closest bus stop is along St John’s Road (circa eight-minute
walk), which supports the number 3 and 583 bus routes. The Site has a Public
Transport Accessibility (PTAL) of 0, where a score of 0 indicates very poor access
to public transport and 6 indicates excellent access.
7.13 The Council’s Highways Team has been consulted and raise no objection to the
proposed development subject to conditions regarding vehicular access.
Appropriate highways conditions are recommended in this planning assessment
and recommendation.
7.14 The proposed development would have 24 on-site car parking spaces within the
service yards towards the south of the Site – 12 per unit. Two of these bays would
be allocated for disabled person parking – one per unit. The Applicant proposed
fitting eight of the 24 spaces with active Electric Vehicle Charging infrastructure –
four per unit . Sixteen secured and covered cycle parking spaces would also be
provided within the service yard – eight per unit.
7.15 The proposed car parking and cycle parking provision align with The London Plan
and Hillingdon Local Plan standards. Conditions are recommended to ensure their
delivery and ongoing availability.
7.16 The proposed car park would provide onsite spaces that would otherwise continue
to occur along pavements around the Site. This is supported given the PTAL 0.
However, the development would result in pedestrians walking across the site
Hillingdon Planning Committee – 17.07.2025
PART 1 – Members, Public & Press
access, where vehicles wou ld be coming in and out. To reduce highway safety
risks and ensure an acceptable pedestrian environment, a condition is
recommended for the Applicant to provide a section of footway in front of the
electric substation on the southern side of the Site along with a speed hump across
the full width of the service yard accesses.
7.17 Subject to the recommended conditions, the proposal complies with Paragraph
116 of the NPPF, Policies T2, T4, T5, T6, and T7 of The London Plan, and Policies
DMT 1, DMT 2, DMT 5, and DMT 6 of the Hillingdon Local Plan - Part 2.
Air Quality
7.18 The Site is within an Air Quality Management Area (AQMA) and 240 metres south
of an Air Quality Focus Area.
7.19 The Applicant submitted an Air Quality Assessment (Rev-P02, reference ISU-
BWB-ZZ-XX-LA-RP-0001_AQA, prepared by BWB Consulting, dated
11.10.2024).
7.20 The proposed development would not be air quality neutral. Therefore, further
appropriate mitigation is required.
7.21 Mitigation measures to reduce emissions can be applied on-site or off-site. Where
this is not practical or desirable, pollutant off -setting will be applied. The level of
mitigation required associated with the operation phase of the proposed
development is
calculated using Defra’s Damage Cost Toolkit in this instance. Any
mitigation measures proposed will be ev aluated in terms of likely emission
reductions onto local air quality. Wherev er quantifiable, these are calculated and
subtracted from the overall value due. When no quantification is possible, a flat
rate discount is applied. Mitigation required to offset the proposed development's
traffic emissions is £91,413.
7.22 The Council’s Air Quality Officer has been consulted and raised no objection
subject to an a ir quality mitigation contribution of £91,413 secured by a Section
106 L3egal Agreement and conditions regarding a Low Emission S trategy (LES)
and reducing emissions from demolition and construction. This S106 financial
contribution is included in the recommended Heads of Terms and conditions have
been recommended
to be attached should Members de termine to approve the
application in line with the Air Quality Officer’s recommendations . Details of
electric vehicle charging spaces are also recommended to be secured by
condition.
7.23 Subject to legal agreement and the recommended conditions, the proposal
complies with Policies SI 1 and GG3 of The London Plan, Policy EM8 of the Local
Plan Part 1, and Policy DMEI 14 of the Hillingdon Local Plan - Part 2.
Noise
Hillingdon Planning Committee – 17.07.2025
PART 1 – Members, Public & Press
7.24 The Applicant submitted a Noise Impact Assessment (Project No 2422643,
prepared by Sharps Redmore, dated 26.11.2024) assessing the acceptability of
noise regarding plant and delivery activity. It concludes that 'having assessed the
noise impact against national design guidance, including BS 4142:2014 and WHO
Guidelines for Community Noise, the prop osed development would comply with
the requirements of paragraph 191 of the National Planning Policy Framework, to
avoid significant adverse impact.’
7.25 The Council's Noise Pollution Officer has reviewed the submission and raised no
objection subject to conditions regarding the noise impact of the proposed
development on the existing environmen t, as well as an informative regarding
external noise. An a
ppropriate condition and informative are recommended as part
of the planning assessment and planning recommendation.
7.26 A further Construction Management Plan condition is recommended to mitigate
and manage potential disturbance to residents.
7.27 The proposal complies with Policies D13 and D14 of The London Plan.
Accessibility
7.28 The supporting Design and Access Statement, and plans demonstrate inclusive
access; however, it is unclear how the Applicant would achieve means of escape
for older and disabled people from the proposed first floor.
The installation of fire
evacuation lifts to ensure acceptable means of escape is secured by condition.
7.29 Each of the proposed two units would have 12 car parking spaces located solely
within their service yards. This car parking provision includes one disabled person
parking space per unit. This level of disabled person parking is supported.
7.30 The Council’s Accessibility Officer has reviewed the proposal and raised no
objection subject to a condition requiring a minimum of one fire evacuation lift per
each of the two units . An appropriate accessibility planning condition is
recommended as part of the planning assessment and planning recommendation.
7.31 Subject to compliance with the recommended conditions, the proposed
development complies with Policies D5 and D12 of The London Plan.
Urban Greening, Landscaping, and Public Realm
7.32 The existing site suffers from an evident lack of greening. It consists of buildings
and hardstanding encircled by paladin fencing.
7.33 During the planning process, the Council worked with the Applicant to secure
revised landscaping, namely additional planting to the south of the Site and
removal of car parking from the north of the Site. The Applicant proposes greening
around the Site’s edge , including hedgerow, traditional meadow wildflower, and
native scrub mix. The proposed plans would be a notable improvement on the
existing Site. Notwithstanding, the proposed 2.4-metre-tall paladin fence would not
Hillingdon Planning Committee – 17.07.2025
PART 1 – Members, Public & Press
be appropriate around the entire Site, nor would the large, paved staff amenity
area enclosed by a n Armco barrier (which replaced previously propose car
parking). Accordingly, a revised landscape plan condition is recommended to
secure appropriate revised boundary treatment and additional soft landscaping.
Additionally, a Landscape Management Plan to ensure appropriate landscaping
and urban greening maintenance is recommended by condition.
7.34 Policy G5 of The London Plan (2021) sets a target Urban Greening Factor Score
(UGF) score of 0.3 for predominately commercial development. The Plan explicitly
states that this UGF target excludes B2 and B8 uses, which the Site is within. The
initial proposed UGF was 0.05. The Applicant submitted a revised scheme,
following collaboration with the Council. The revised plan proposed an UGF of
0.06. The UGF is acceptable given the Site’s indus trial use and the proposed
increase in green cover.
7.35 Policy DMEI 1 of the Local Plan Part 2 requires all major development to
incorporate living roofs and/or walls. The proposal would not incorporate these
features and would not be strictly in accordance with Policy DMEI 1.
Notwithstanding, on balance, the omission of green roof and living walls is
accepted given the site’s constraints, considered planting proposal, and improved
onsite urban greening.
7.36 Subject to conditions, the proposal would comply with the aims Policy G5 of The
London Plan and Policy DMHB 14 of the Hillingdon Local Plan - Part 2.
Biodiversity
7.37 The Applicant submitted an Ecological Impact Assessment (Rev-01, report
number 17240_R01_CS_CC_TC, prepared by Tyler Grange Group Limited, dated
08.10.2024), which details that the existing Site comprises developed land of
negligible ecological importance.
7.38 The proposal would result in a gain of 0.03 habitat units and 0.15 hedgerow units.
This would be a Biodiversity Net Gain of 40.41 per cent, exceeding requirements
for onsite biodiversity gain requirements.
7.39 The Applicant identified roosting bats onsite following three surveys. The ecology
report identifies the roost as being of local ecological importance. It further states
that ‘a detailed bat mitigation strategy will need to be designed with the client to
compensate for the loss of the roost. If Natural England grants a licence, and a
maternity roost is confirmed present the works to demolish the building will need
to be timed to be outside of maternity season and only carried out between March-
April and September-October. Appropriate mitigation will be put in place pre- and
post-development, such as bat bricks and boxes and/or offsite compensation. Full
planning permission will be needed prior to a licence being applied for and a
licence application typically takes a minimum of 30 working days to process.’ As
recommended within the Applicant’s report, the Applicant has proposed an
external bat structure. Provision of this structure is recommended by condition.
Hillingdon Planning Committee – 17.07.2025
PART 1 – Members, Public & Press
7.40 The Council’s Environmental Specialist (Energy and Biodiversity) reviewed the
submitted biodiversity details and raised no objection regarding the proposed
development. A condition has been recommended regarding BNG and habitat
management.
7.41 The proposed development complies with Policy 15 of the NPPF, Policy G6 and
Paragraph 8.6.6 of The London Plan, and Policy DMEI 7 and Paragraph 6.28 of
the Hillingdon Local Plan - Part 2.
Flooding and Drainage
7.42 The Site is in Flood Zone 1 (lowest flood ri sk). It is not within a Critical Drainage
Area or impacted by Surface Water Flooding.
7.43 The Applicant submitted a Sustainable Urban Drainage Strategy and Flood Risk
Assessment (Rev-P01, report number 8393-FUR-ZZ-XX-RP-D-0901, prepared by
Furness Consulting Engineers, dated 04.10.2024).
7.44 The site’s location within Flood Zone 1 means it is unlikely to be affected by fluvial
flooding. The existing site comprises buildings and hardstanding. As such, there
are no natural forms of attenuation within the site boundary. The submission states
that ‘the proposed surface water drainage strategy comprises a series of siphonic
rainwater pipes, linear drains and gullies which pick up the surface water from the
roof and external hard landscaping area, respectively. The collected
surface water
would then be stored within the proposed below ground attenuation tank located
to the south of the building under the parking and service yard area. The water
from the tank would be pumped at a rate of 3L/s to an SDS Aqua Filter (or similar)
before discharging to the public sewer under Eskdale Road to the west of the site.
This sewer then outfalls to the River Colne.’ During the application’s assessment,
the volume of the attenuation tank has increased to 465
cubic metres. There would
still be some flooding in the 1 in 100-year event (+40 per cent climate change);
however, this is acceptable.
7.45 The Council’s Flood Risk and Drainage Consultant has reviewed the submission
and raised no objection subject to Sustainable Water Management and
Sustainable Drainage Scheme Evidence
planning conditions. Appropriate
drainage conditions are recommended as part of this planning recommendation.
7.46 Subject to the recommended conditions, the proposed development complies with
Policies SI12 and SI13 of The London Plan, Policy EM6 of the Hillingdon Local
Plan - Part 1, and Policies DMEI 9 and DMEI 10 of the Hillingdon Local Plan - Part
2.
Water Efficiency
7.47 To ensure the development would minimise the use of mains water, a compliance
planning condition is recommended for it to achieve at least the BREEAM
excellent standard for the ‘Wat 01’ wat er category or equivalent (commercial
Hillingdon Planning Committee – 17.07.2025
PART 1 – Members, Public & Press
development), and incorporate measures such as smart metering, water saving,
and recycling measures, including retrofitting.
7.48 Subject to the recommended condition, the proposal complies with Policy SI 5 of
The London Plan.
Energy and Sustainability
7.49 The Applicant has submitted an Energy and Sustainability Statement (Rev-B,
prepared by Envision, dated October 2024).
7.50 Air Source Heat Pumps (ASHP) would be used to generate heating, cooling, and
hot water for the proposed development. 340 sq. m. of photovoltaic roof-mounted
panels are also proposed. To bring the development's carbon savings up to 100
per cent, the remaining carbon emissions are to be offset through a carbon offset
payment. A carbon offset payment, priced at £95 per tonne of CO2 per year (over
30 years) to be paid via a Section 106 to the Council is £41,850.
7.51 The Council’s Environmental Specialist (En ergy and Biodiversity) reviewed the
submitted details and raised no objection subject to a carbon offset contribution of
£41,850 and ‘be seen’ energy monitoring obligation secured by a S106 Agreement
and condition regarding energy.
7.52 Subject to legal agreement and the recommended conditions, the proposal would
comply with Policies SI2 and SI3 of The London Plan, Policy EM1 of the Hillingdon
Local Plan
- Part 1, and Policies DMEI 2 and DMEI 3 of the Hillingdon Local Plan
- Part 2.
Waste Management
7.53 The Applicant proposes sufficient provision for waste and recycling within timber-
clad bin enclosures towards the vehicle entrance/exit of each of the two service
yards.
7.54 The Council’s Waste Services Team has reviewed the submitted documents and
raised no objection to the proposed development.
7.55 Subject to condition, the proposal would co mply with Policy SI 7 of The London
Plan and DMHB 11 of the Hillingdon Local Plan - Part 2.
Land Contamination
7.56 The Site is within a Potentially Contaminated Land area.
7.57 The Applicant submitted a Contamination Assessment (Desk Study/Preliminary
Risk Assessment Report, prepared by Jomas Associates LTD, dated 21.08.2024)
that concluded ‘an intrusive investigation is recommended to confirm the
preliminary geo
-environmental ri sks identified and to provide geotechnical
information for use in design. The investigation should assess the thickness of any
Hillingdon Planning Committee – 17.07.2025
PART 1 – Members, Public & Press
Made Ground and allow samples of Made Ground and natural soils to be taken
for laboratory analysis. A programme of soil gas monitoring should be undertaken
due to the proximity of historic landfill sites.’
7.58 The Council’s Land Contamination Officer has been consulted and advised that
they have no objection to the proposed development. The Officer recommended
a land contamination condition which has been attached.
7.59 Subject to condition, the proposal complies with Policies DMEI 11 and DMEI 12 of
the Hillingdon Local Plan - Part 2.
Fire Safety
7.60 The Applicant submitted a Fire Safety Statement (prepared by The Ratcliffe
Groves Partnership, dated 11.10.2024), detailing the key fire safety features of the
building. This is based on compliance with Approved Document B (fire safety)
Volume 2: Buildings other than dwellings, 2019 edition incorporating 2020 and
2022 amendments and incorporates additional amendments not yet in use
typically 2025 and 2026 amendments to Volume 2.
7.61 The technical aspects of the materials to be used in any development, in relation
to fire safety, are considered under the Building Act (1984) and specifically the
Building Regulations, Approved Document B amended version (2022). These
require minimum standards for any development, although the standards would
vary between residential and commercial uses and in relation to new build and
change of use/conversions. The Regulations cover a range of areas including
structure and fire safety. Any person or organisation carrying out development can
appoint either the Council’s Building Control Service or a Private Approved
Inspector to act as the Building Control Body (BCB), to ensure the requirements
of the Building Regulations are met. The BCB carry out an examination of
drawings for the proposed works and make site inspections during construction
work to ensure the works are carried out correctly. On completion of work the BCB
would issue a Completion Certificate to co nfirm that the works comply with the
requirement of the Building Regulations.
7.62 The fire strategy will be subject of further review during the detailed design stages
to ensure compliance with relevant building design requirement including the
relevant Building Regulation s and other recommendations
, including BS 9999:
2017, Fire safety in the design, management and use of buildings - Code of
practice.
7.63 The proposal complies with the aims of Policy D12 of The London Plan.
Archaeological Impact
7.64 The Site is within an Archaeological Priority Areas – Colne Valley.
Hillingdon Planning Committee – 17.07.2025
PART 1 – Members, Public & Press
7.65 Accordingly, the Applicant submitted a Desktop Archaeological Statement,
(prepared by First Plan, dated November 2024) and an Archaeological Desk-
Based Assessment, (prepared by Compass Archaeology, dated 31.01.2025).
7.66 The Local Planning Authority consulted Historic England’s Greater London
Archaeological Advisory Service (GLAAS), which reviewed the submission and
stated that ‘the development could cause harm to archaeological remains and field
evaluation is needed to determine appropriate mitigation. However, although the
NPPF envisages evaluation being undertaken prior to determination, in this case
consideration of the nature of the development, the archaeological interest and/or
practical constraints are such that I c
onsider a two-stage archaeological condition
could provide an acceptable safeguard. This would comprise firstly, evaluation to
clarify the nature and extent of surviving remains, followed, if necessary, by a full
investigation.’ GLASS concluded they had no objection to the proposed
development subject to condition and informative regarding a Written Scheme of
Investigation.
7.67 A Written Scheme of Investigation condition and informative is recommended.
7.68 Subject to condition, the proposal complies with the NPPF, Policy HC1 of The
London Plan, and Policy DMHB 7 of the Hillingdon Local Plan - Part 2.
Planning Obligations
7.69 Policy DMCI 7 of the Local Plan Part 2 states to ensure development is
sustainable, planning permission will only be granted for development that clearly
demonstrates there will be sufficient infrastructure of all types to support it.
Infrastructure requirements will be predominantly addressed through the Council's
Community Infrastructure Levy (CIL). P lanning obligations will be sought on a
scheme
-by-scheme basis to secure the provision of affordable housing in relation
to residential development schemes, where development has infrastructure needs
that are not addressed through CIL, and to ensure that development proposals
provide or fund improvements to mitigate site
-specific impacts made necessary by
the proposal. Applications that fail to secure an appropriate Planning Obligation to
make the proposal acceptable will be refused.
7.70 The Community Infrastructure Levy Regulation 2010 (Regulations issued
Pursuant to the 2008 Act) and the NPPF have put three tests on the use of
planning obligations into law. It is unlawful (since 6 April 2010) to request planning
obligations that do not meet the following tests:
i. necessary to make the development acceptable in planning terms
ii. directly related to the development, and
iii. fairly and reasonable related in scale and kind to the development
7.71 The effect of the Regulations is that the Council must apply the tests much more
strictly and can only request planning obligations that are genuinely necessary
and directly related to the development. Should the Council request planning
Hillingdon Planning Committee – 17.07.2025
PART 1 – Members, Public & Press
obligations that do not meet the policy tests, the Council would have acted
unlawfully and could be subject to a High Court challenge.
7.72 Section 106 Heads of Terms are as follows:
1. Air Quality Mitigation contribution of £91,413.
2. A Carbon Offset contribution of £41,850.
3. An Employment/Construction Training Scheme secured in accordance with the
Council's Planning Obligations SPD.
4. ‘Be Seen’ post-construction energy monitoring to be carried out in accordance
with the GLA ‘Be Seen’ Energy Monitoring Guidance London Plan Guidance
Documents (2021).
5. A Project Management and Monitoring Fee, equalling 5% of the total financial
contributions to be paid under this agreement.
Environmental Impact Assessment
7.73 No EIA Screening Opinion Request was submitted to the Council; however, given
the scale, nature, and location of the proposal an EIA would not be required as its
impact would be local.
8 Other Matters
Human Rights
8.1 The development has been assessed against the provisions of the Human Rights
Act, and in particular Article 1 of the First Protocol and Article 8 of the Act itself.
This Act gives further effect to the rights included in the European Convention on
Human Rights. In arriving at this
recommendation, due regard has been given to
the applicant's reasonable development rights and expectations which have been
balanced and weighed against the wider community interests, as expressed
through third party interests / the Development Plan and Central Government
Guidance.
Equality
8.2 Due consideration has been given to Section 149 of the Equality Act with regard
to the Public Sector Equality Duty in the assessment of this planning application.
No adverse equality impacts are considered to arise from the proposal.
Local Finance Considerations and CIL
8.3 As of 1 April 2012, all planning approvals for schemes with a net additional internal
floor area of 100 sq. m. or more were liable for the Mayoral Community
Infrastructure Levy (CIL), as legislated by the CIL Regulations 2010 and The CIL
(Amendment) Regulations 2011. From April 2019, the liability payable is £60 per
sq. m. The MCIL2 charging schedule rate, including indexation for calendar year
2025, is £71.09 per sq. m.
Hillingdon Planning Committee – 17.07.2025
PART 1 – Members, Public & Press
8.4 The London Borough of Hillingdon Council is a collecting authority for the Mayor
of London, and this liability shall be paid to the London Borough of Hillingdon
Council in the first instance.
8.5 In addition to MCIL2, the development represents Chargeable Development under
the Hillingdon CIL, which came into effect on 1 August 2014. The liability payable
is as follows:
- Industrial - £5 per sq. m.
8.6 This CIL liability is in addition to the Section 106 planning obligations.
8.7 The proposed development consists of the following floor areas:
8.8 Commercial/general industrial/storage and distribution (Use Class E(g)(iii)/B2/B8)
– 2,850 sq. m. (721 sq. m. less than the existing Site in the same use).
8.9 As there would be a 721 sq. m. loss of Use Class E(g)(iii)/B2/B8 floor space, there
would be no CIL charge required.
9 Conclusion / Planning Balance
9.1 The principle of redeveloping commercial buildings for use within Classes E(g)(iii)/
B2/B8 within a Strategic Indu strial Location (SIL) is supported. The building’s
height, scale, and mass are well -suited to the surrounding industrial estate
context. The Local Planning Authority has worked with the Applicant to refine the
development’s design during the full planning application process, securing
additional planting and relocation and reduction of car parking to ensure highway
safety. Following receipt of revisions, there a re no objections from the Council’s
Urban Design Officer, Landscape Officer, or Highways Officers. While located on
Potentially Contaminated Land, the Council’s Land Contamination Officer has no
concerns subject to the recommended condition. Similarly, whilst within an
Archaeological Priority Area (Colne Valley), Historic England’s Greater London
Archaeological Advisory Service (GLAAS) has no objection subject to the attached
conditions. Noting the Air Quality Manag ement Area (AQMA), which the Site is
within, the Council’s Air Quality Officer has no objections subject to an air quality
mitigation contribution of £91,413 (contained within the Section 106 Heads of
Terms) and planning conditions, which have been recommended.
9.2 The proposal is acceptable and would be co nsistent with the National Planning
Policy Framework, The London Plan, and Hillingdon Local Plan.
9.3 The planning application is therefore recommended for approval subject to the
conditions set out in Appendix 1 and Section 106 Heads of Terms detailed on the
previous page.
10 Background Papers
Hillingdon Planning Committee – 17.07.2025
PART 1 – Members, Public & Press
10.1 Relevant published policies and documents taken into account in respect of this
application are set out in the report. Documents associated with the application
(except exempt or confidential information) are available on the Council's
website here, by entering the planning application number at the top of this
report and using the search facility. Planning applications are also available to
inspect electronically at the Civic Centre, High Street, Uxbridge, UB8 1UW upon
appointment, by contacting Planning Services at planning@hillingdon.gov.uk.
AAPPENDICES
Planning Application
957/APP/2024/2765
Hillingdon Planning Committee -
PART 1 - MEMBERS, PUBLIC & PRESS 1 of 20
AAppendix 1: Recommended Conditions and Informatives
Conditions
1. COM3 T Time Limit
The development hereby permitted shall be begun before the expiration of three years from
the date of this permission.
REASON
To comply with Section 91 of the Town and Country Planning Act 1990.
2. COM4 A Accordance with Approved Plans
The development hereby permitted shall not be carried out except in complete accordance
with the details shown on the submitted plans, numbers:
11565-P-100-Rev-H
11565-P-101-Rev-C
11565-P-102-Rev-C
11565-P-103-Rev-C
11565-S-101-Rev-C
11565-E-101-Rev-D
11565-E-102-Rev-D
11565-M-101
11565-P-109-Rev-A
and shall thereafter be retained/maintained for as long as the development remains in
existence.
REASON
To ensure the development complies with the provisions of The London Plan (2021) and the
Local Plan Parts 1 (2012) and 2 (2020).
3. COM5 G General compliance with supporting documentation
The development hereby permitted shall not be carried out except in complete accordance
with the details shown on the submitted documents, references:
Planning Statement-V2, reference 24322/MM/TH, prepared by First Plan, dated 14.10.2024;
Environmental Noise Assessment, Project No 2422643, prepared by Sharps Redmore,
dated 26.11.2024;
SuDs Strategy and Flood Risk Assessment-Rev-P01, report number 8393-FUR-ZZ-XX-RP-
D-0901, prepared by Furness Consulting Engineers, dated 04.10.2024;
Fire Safety Statement, prepared by The Ratcliffe Groves Partnership, dated 11.10.2024;
The Statutory Biodiversity Metric, prepared by C Stewart, dated 08.10.2024;
Hillingdon Planning Committee -
PART 1 - MEMBERS, PUBLIC & PRESS 2 of 20
Air Quality Assessment-Rev-P02, reference ISU-BWB-ZZ-XX-LA-RP-0001_AQA, prepared
by BWB Consulting, dated 11.10.2024;
Transport Statement, prepared by ttp Consulting, dated October 2024;
Framework Travel Plan, prepared by tpp Consulting, dated October 2024;
Energy and Sustainability Statement-Rev-B, prepared by Envision, dated October 2024;
Ecological Impact Assessment_Rev-01, report number 17240_R01_CS_CC_TC, prepared
by Tyler Grange Group Limited, dated 08.10.2024;
Desk Study/Preliminary Risk Assessment Report, prepared by Jomas Associates LTD,
dated 21.08.2024;
Archaeological Desk-Based Assessment, prepared by Compass Archaeology, dated
31.01.2025;
Letter, reference 8393/HP/HC-P1:12.02.25, RE Drainage, prepared by Furness Consulting
Engineers, dated 12.02.2025;
Letter, reference: 8393/HP/HC-P1:03.04.25, RE Drainage, prepared by Furness Consulting
Engineers, dated 04.04.2025;
Thereafter the development shall be retained/maintained in accordance with these details for
as long as the development remains in existence.
REASON
To ensure that the development complies with the objectives of The London Plan (2021) and
the Local Plan Parts 1 (2012) and 2 (2020).
4
4. OM19 C Construction Management Plan
Prior to the commencement of development (including demolition, site clearance, and initial
ground investigation works), a Construction Management Plan shall be submitted to, and
approved by the Local Planning Authority. The plan shall detail:
(i) The phasing of development works.
(ii) The hours during which development works will occur.
(iii) A programme to demonstrate that the most valuable or potentially contaminating
materials and fittings can be removed safely and intact for later re-use or processing.
(iv) Measures to prevent mud and dirt tracking onto footways and adjoining roads (including
wheel washing facilities).
(v) Traffic management and access arrangements (vehicular and pedestrian) and parking
provisions for contractors during the development process (including measures to reduce
the numbers of construction vehicles accessing the site during peak hours).
(vi) Measures to reduce the impact of the development on local air quality and dust through
minimising emissions throughout the demolition and construction process.
(vii) The storage of demolition/construction materials on site.
(ix) Measures to demonstrate compliance with the GLA's Control of Dust and Emissions
from Construction and Demolition SPG.
The approved details shall be implemented and maintained throughout the demolition and
construction process.
Hillingdon Planning Committee -
PART 1 - MEMBERS, PUBLIC & PRESS 3 of 20
REASON
To reduce the impact on air quality during construction, protect amenity, and ensure
highways safety and to ensure that construction work and construction equipment on the site
in compliance with Policies T7, GG3, and SI 1 of The London Plan (2021) and the GLA's
Control of Dust and Emissions during Construction and Demolition SPG.
5
5. NONSC C Construction Logistics Plan (CLP)
Prior to the commencement of development (including demolition, site clearance, and initial
ground investigation works) a Detailed Construction Logistics Plan (CLP) shall be submitted
to and approved by the Local Planning Authority. The approved CLP shall be implemented
and monitored throughout the demolition and construction programme.
REASON
To protect amenity and ensure highways safety in compliance with Policy T7 of The London
Plan (2021).
6. NONSC D Delivery and Servicing Plan
Prior to the first use of the development hereby approved, a Delivery and Servicing Plan
shall be submitted to, and approved in writing by the Local Planning Authority. The approved
Plan shall be adhered to throughout the lifetime of the development.
REASON
To ensure appropriate delivery and servicing arrangements in compliance with Policy T7 of
The London Plan (2021).
7. NONSC C Cycle Parking
Prior to the first use of the development hereby approved, at least 16 cycle parking spaces
(eight per unit) shall be installed in accordance with the approved plans and shall be made
available for use. The 16 cycle parking spaces shall thereafter be permanently retained on
site, maintained, and be kept available for use.
REASON
To ensure appropriate cycle parking provision in accordance with Policy T5 of The London
Plan (2021) and Policies DMT 2 and DMT 5 of the Local Plan Part 2 (2020).
8. NONSC E Electric Vehicle Charging Points
(i) Prior to the first use of the development hereby approved, active electric vehicle charging
facilities shall be installed and made available for use at eight car parking spaces (four per
unit). The active electric vehicle charging infrastructure shall thereafter be permanently
retained on site, maintained, and be kept available for use.
(ii) Prior to the first use of the development hereby approved, passive electric vehicle
Hillingdon Planning Committee -
PART 1 - MEMBERS, PUBLIC & PRESS 4 of 20
charging facilities shall be installed at 16 car parking spaces (eight per unit). The passive
electric vehicle charging infrastructure shall thereafter be permanently retained on site and
be available for upgrading to active electric vehicle charging.
REASON
To ensure an appropriate level of onsite electric vehicle charging facilities are provided in
accordance with Policy T6 of The London Plan (2021).
9
9. NONSC D Disabled Person Parking
Prior to the first use of the development hereby approved, two disabled person car parking
spaces (one per unit) shall be provided in accordance with the approved plans and made
available for use. The two disabled person parking spaces shall be available for use upon
first use and thereafter be permanently retained on site and be kept available for use.
REASON
To ensure an appropriate level of onsite disabled person parking is provided in accordance
with Policy T6 of The London Plan (2021).
10. NONSC L Landscape Plan
Notwithstanding the details shown on plans hereby approved:
(a) Prior to the first use of the development hereby permitted, a revised Landscape Plan
shall be submitted to and approved by the Local Planning Authority. The Plan shall include:
(i) a pedestrian refuge in the centre of the vehicular site accesses to the south of the Site.
(ii) a speed hump across the full length of the vehicular Site accesses to the south of the
Site.
(iii) revised boundary treatment.
(iv) revised staff amenity area to the north of the Site.
The approved landscaping scheme (except planting, seeding, and turfing) shall be
implemented prior to the first use and thereafter retained as such in perpetuity.
(b) All planting, seeding, and turfing in the approved landscaping scheme shall be
implemented in the nearest planting season (1 October to 28 February inclusive) following
first use of the approved development. The new planting and landscape operations shall
comply with the requirements specified in BS3998:2010 - 'British Standard
Recommendations for Tree Work'.
Thereafter, areas of amenity space shall be permanently retained and any trees or other
planting which die within a period of five years from the completion of development, are
removed, or become seriously damaged or diseased shall be replaced in the next planting
season with others of similar size and species in accordance with the details approved by
the Local Planning Authority.
Hillingdon Planning Committee -
PART 1 - MEMBERS, PUBLIC & PRESS 5 of 20
REASON
To ensure the development delivers high-quality design to enhance visual amenities of the
locality, improved landscaping and urban greening, a safe pedestrian environment, and
mitigates transport impacts in accordance with Policies G5, G7, T5, and D8 of The London
Plan (2021) and Policies DMHB 11, DMHB 12, and DMHB 14 of the Local Plan Part 2
(2020).
1
11. NONSC L Landscape Management Plan
Prior to first use of the development hereby approved, a Landscape Management Plan for a
minimum period of five years from the implementation of final planting, shall be submitted to,
and approved in writing by the Local Planning Authority. Thereafter, the development shall
be managed and maintained strictly in accordance with the approved details.
REASON
To ensure landscaping and urban greening measures are appropriately maintained in
accordance with Policy G5 of The London Plan (2021) and Policies DMHB 12 and DMHB 14
of the Local Plan Part 2 (2020).
12. NONSC U Urban Greening Factor
(a) Urban Greening Factor measures to achieve a minimum Urban Greening Factor score of
at least 0.06 shall be implemented in the nearest planting season (1 October to 28 February
inclusive) following first use of the approved development at the latest.
(b) Within six months of implementation of Urban Greening Factor measures, details of
onsite green infrastructure shall be submitted to, and approved in writing by the Local
Planning Authority to verify the UGF score of at least 0.06 has been attained.
The approved Urban Greening Factor measures to achieve a score of at least 0.06 shall
permanently be maintained as such thereafter.
REASON
To ensure appropriate levels of high-quality landscaping and urban greening measures are
provided in accordance with Policy G5 of The London Plan (2021).
13. NONSC E Ecology
(a) Prior to the commencement of development (including demolition, site clearance, and
initial ground investigation works), a Natural England licence confirming permission to
demolish the buildings shall be submitted to and approved by the Local Planning Authority.
Thereafter, demolition shall only occur outside of bat maternity season and be carried out
between March to April and/or September to October.
(b) A Bat Mitigation Strategy shall be submitted to and approved by the Local Planning
Hillingdon Planning Committee -
PART 1 - MEMBERS, PUBLIC & PRESS 6 of 20
Authority prior to the commencement of development (including demolition, site clearance,
and initial ground investigation works). Approved mitigation measures shall be implemented
in accordance with the Strategy and permanently retained thereafter.
(c) Any bird nesting clearance shall be carried out in accordance with Ecological Impact
Assessment_Rev-01, report number 17240_R01_CS_CC_TC, prepared by Tyler Grange
Group Limited, dated 08.10.2024.
(d) At least two bird boxes shall be installed onsite prior to the first use of the development
hereby permitted. Thereafter, the bird boxes shall be retained onsite in perpetuity.
REASON
To mitigate potential harm to bats and enhance the site for roosting bats in accordance with
Policies G5 and G6 of The London Plan (2021), Policy EM7 of Hillingdon's Local Plan Part 1
(2012), and Policy DMEI 7 of Hillingdon's Local Plan Part 2 (2020).
1
14. NONSC B Biodiversity and HMP
(a) Biodiversity measures to achieve a 40.41 per cent onsite Biodiversity Net Gain
Assessment shall be implemented in the nearest planting season (1 October to 28 February
inclusive) following the first use of the approved development.
(b) Prior to the first use of the development hereby permitted, a 30-year site Habitat
Management Plan (HMP) shall be submitted to, and approved in writing by the Local
Planning Authority. The HMP shall include:
(i) Description and evaluation of the features to be managed;
(ii) Aims, objectives, and targets for management;
(iii) Description of the management operations necessary to achieving aims and objectives;
(iv) Prescriptions for management actions;
(v) Preparation of a works schedule, including annual works schedule;
(vi) Details of the monitoring needed to measure the effectiveness of management;
(vii) Details of the timetable for each element of the monitoring programme; and
(viii) Details of the persons responsible for the implementation and monitoring.
The approved HMP shall be strictly adhered to, and development shall commence and
operate in accordance with it.
(c) The Applicant shall report the state of the Biodiversity Net Gain requirements of the
development to the Council in years one (post-completion), three, five, ten, 20 and 30, with
biodiversity reconciliation calculations at each stage.
REASON
To ensure the development delivers onsite biodiversity net gain and secures the protection
and effective management of on-site habitat in accordance with Policy G6 of The London
Plan (2021), Policy EM7 of the Local Plan Part 1 (2012), and Policies DMEI 7 and DMHB 14
Hillingdon Planning Committee -
PART 1 - MEMBERS, PUBLIC & PRESS 7 of 20
of the Local Plan Part 2 (2020).
115. NONSC A Accessibility
The development hereby approved shall include a minimum of one fire evacuation lift per
unit, designed to meet the technical standards detailed in BS EN 81-76, BS 9991 and/or BS
9999, which shall be operational upon first use of the development and maintained and
retained for the life of the development.
REASON
To ensure the development can accommodate robust emergency evacuation procedures,
including measures for those requiring step-free egress in accordance with Policies D5 and
D12 of The London Plan (2021).
16. NONSC E Energy Strategy
Prior to first use of the development hereby approved, the development shall incorporate
measures detailed within Energy and Sustainability Statement-Rev-B, prepared by Envision,
dated October 2024. Thereafter, the approved measures shall be maintained in perpetuity.
REASON
In the interest of addressing climate change and to secure environmentally sustainable
development in accordance with Policies SI2 and SI3 of The London Plan (2021).
17. NONSC P Photovoltaic Panels
The 340 sq. m. of Photovoltaic Panels shall be installed and operational prior to first use of
the development hereby approved, and thereafter shall be maintained in good working order
in accordance with the manufacturer's instructions and cleaned at least annually unless self-
cleaning panels are installed.
REASON
To ensure that the installed Photovoltaic Panels generate renewable energy at their full
potential in accordance with Policy SI2 of The London Plan (2021).
18. NONSC N Non-Road Mobile Machinery
All Non-Road Mobile Machinery (NRMM) of net power of 37kW and up to and including
560kW used during demolition, site preparation, and construction shall comply with the
emission standards set out in Chapter 7 of the GLA's supplementary planning guidance
'Control of Dust and Emissions During Construction and Demolition' dated July 2014 (SPG),
or subsequent guidance. Unless it complies with the standards set out in the SPG, no
NRMM shall be on site, at any time, whether in use or not, without the prior written consent
of the Local Planning Authority. The developer shall keep an up-to-date list of all NRMM
used during the demolition, site preparation and construction phases of the development on
Text extracted automatically from the PDF, so layout, tables and images are not shown. Only the start of this long document is shown here. Open the original PDF on LB Hillingdon’s website.