Hillingdon Planning Committee – 16th December 2025
PART 1 – Members, Public & Press
Report of the Head of Development Management and Building Control
Planning Committee Report
Case Officer: Ed Laughton 41573/APP/2024/2838
Date Application
Valid:
28.10.24 Statutory / Agreed
Determination
Deadline:
31.10.25
Application
Type:
Full Ward: Heathrow
Villages
Applicant: Heathrow Airport Limited
Site Address: Heathrow Airport
Proposal: Enabling works to allow implementation of full
runway alternation during easterly operations at
Heathrow Airport including the creation of a new
'hold area' at the western end of the northern
runway, the construction of new access and exit
taxiways, the construction of an acoustic noise
barrier to the south of Longford Village and
temporary construction compounds.
The proposed development is subject to an
Environment Impact Assessment (Notice under
Article 19 of the Town and Country Planning
(Environmental Impact Assessment) Regulations
2017).
Summary of
Recommendation:
GRANT planning permission subject to section
106 legal agreement and conditions
Reason Reported
to Committee:
Required under Part 1 of the Planning Scheme of
Delegation (Major application recommended for
approval)
Hillingdon Planning Committee – 16th December 2025
PART 1 – Members, Public & Press
Summary of Recommendation:
GRANT planning permission subject to the completion of a
satisfactory section 106 legal agreement to secure the heads of
terms set out below, and subject to the conditions as set out in
Appendix 1.
It is recommended that delegated powers be given to the Director of
Planning and Sustainable Growth to grant planning permission subject to
the following:
A) That the Council enter into a legal agreement with the applicant under
Section 106 of the Town and Country Planning Act 1990 (as amended) or
any other legislation to secure the following:
Noise
Mitigation
Updated noise assessment
Prior to the commencement of easterly alternation operations,
Heathrow Airport Ltd. (HAL) will provide to the Council (i) an
updated noise assessment based upon the latest forecasts
and associated route allocations for the current fleet and (ii) a
map and list of properties (including addresses) which fall
within Categories B, C, D1 and D2 and to which an offer will
be made.
Engagement
Prior to the commencement of operations, HAL will provide
details of how the property owners of Categories, A, B, C, D1
and D2, as well as the schools requiring insulation will be
informed of the relevant eligibility and implementation criteria
in accordance with a scheme agreed with the Council.
Noise mitigation for residential properties
Eligible properties
• Category A: Any properties exposed to harmful ground
noise and vibration from departure roll on runway 09L will be
identified prior to commencement of operations and will be
eligible for up to £10,000 towards the cost of mitigating the
effects of noise induced vibration predicted as a result of the
Development (in addition to any eligibility under HAL’s
existing Quieter Neighbourhood Support scheme (QNS)).
Hillingdon Planning Committee – 16th December 2025
PART 1 – Members, Public & Press
• Category B: Properties forecast to be exposed to noise
levels of 69 dB LAeq, 16hr and above as a result of the
Development (and which do not already qualify for HAL’s
existing Home Relocation Assistance Scheme (HRAS)) will
be eligible for a sum comprising 1% of the unblighted sale
price plus £10,000 up to a maximum of £20,000 to be paid on
completion of the property sale.
• Category C: Properties that become eligible for the QNS
once the QNS boundary is updated to account for the
Development will be eligible to receive the full noise insulation
package up to £34,000 (unless where additional mitigation
measures are required in exceptional circumstances) towards
noise insultation costs.
• Category D1: Properties forecast to be exposed to air
noise levels of 60 to 63 dB LAeq, 16hr and an increase of
3dB or more as a result of the Development will be eligible to
receive up to £12,000 towards noise insulation costs.
• Category D2: Properties forecast to be exposed to air
noise levels of 54 to 60 dB LAeq, 16hr and an increase of 3
dB or more as a result of the Development will be eligible to
receive a fixed amount of £3,000 towards noise insultation
costs.
In respect of Category A, C and D1 properties, the actual
amount to be offered by HAL will be determined following an
independent survey and assessment.
Schools insultation
HAL will offer a package of bespoke insulation and
ventilation measures of up to £2.5m per school to:
• Littlebrook Nursery
• Khosla House
• Cranford Community College
• Cedars Primary School
Parks and Gardens
Within 3 months from implementation of the planning
permission, HAL will make a financial contribution to the
Council of £250,000 (in total) towards the enhancement of
Berkeley Meadows, Avenue Park and Cranford Park.
Monitoring
Hillingdon Planning Committee – 16th December 2025
PART 1 – Members, Public & Press
Prior to commencement of easterly alternation, a monitoring
plan will be agreed with the Council. The monitoring plan will
set out how and when (annually) the Council will be informed
of the progress of delivering the noise insulation measures
outlined above (excluding Parks and Gardens).
Dispute Resolution
Prior to commencement of easterly alternation, a dispute
resolution process will be agreed between HAL and the
Council.
Ground
Noise and
Vibration
HAL will monitor actual ground noise and vibration levels
impacted by Operations and use results to inform the
development of the Ground Noise and Vibration Management
Plan.
The location and methodology for assessing ground noise
and vibration will be agreed in writing alongside approaches
to mitigation.
Temporary
Rehousing
HAL will provide temporary rehousing to any occupied
households for which the predicated construction noise levels
exceed specified thresholds.
Air Quality HAL will pay £100,000 to the Council as an air quality
contribution to mitigate air quality impacts in Longford.
Mitigation measures are to be identified in an Air Quality
Action Plan for Longford (LAQAP) funded by HAL and
produced by LBH.
An Ultrafine Particles (UFP) Monitoring and Action Plan is to
be secured.
(Details related to this Heads of Term remain under
discussion with the applicant at the time of writing and an
update shall be provided to Members through the Planning
Committee Addendum/at the Planning Committee).
Noise
Barrier
Maintenance
HAL shall undertake an inspection of the noise barrier on a
biennial basis commencing one year after its completion. A
report shall be prepared and submitted to the local planning
authority setting out the findings of the inspection. Works to
the noise barrier will be undertaken to ensure it maintains
operational efficacy in line with the design parameters.
Construction
Noise
HAL will submit a Section 61 application under the Control of
Pollution Act 1974 for prior consent of the noise parameters
for the construction period.
Employment
/Constructio
n Training
Scheme
An Employment/ Construction Training Scheme secured to
meet the objectives of the Council's Planning Obligations
SPD.
Hillingdon Planning Committee – 16th December 2025
PART 1 – Members, Public & Press
Project
Management
& Monitoring
Fee
A Project Management and Monitoring Fee, equalling 5% of
the total contributions to be paid under this agreement.
B) That in respect of the application for planning permission, the applicant meets
the Council's reasonable costs in preparation of the Section 106 agreement and
any abortive work as a result of the agreement not being completed.
C) That officers be authorised to negotiate and agree the detailed terms of the
proposed agreement and conditions of approval.
D) That, if the Legal Agreement has not been finalised within 9 months (or such
other time frame as may be agreed by the Director of Planning and Sustainable
Growth), delegated authority be given to the Director of Planning and
Sustainable Growth to refuse planning permission for the following reason:
'The applicant has failed to mitigate the impacts posed by the proposed
development (in respect of Noise and Vibration Impacts, Air Quality and
Construction Training). The scheme therefore conflicts with Policy DMCI 7 of the
Hillingdon Local Plan: Part 2 – Development Management Policies (2020); the
adopted Planning Obligations Supplementary Planning Document (2014); Policy
DF1 of the London Plan (2021); and paragraphs 56
-58 of the National Planning
Policy Framework (2024).'
E) That if the application is approved, that the permission is subject to the
Conditions as set out in Appendix 1, subject to authorised negotiation by officers.
1 Executive Summary
1.1 This planning application seeks permission for the physical works required to the
airfield at Heathrow Airport and supporting infrastructure to enable the
implementation of full runway alternation between departures and arrivals during
‘easterly’ operations. The works will therefore facilitate the ending of the Cranford
Agreement subject to further airspace change processes separate from the
planning consenting regime.
1.2 These physical works would normally be covered by permitted development
rights and as such would not require planning permission; however, since these
works would facilitate a major change to the airport’s operations, they would give
rise to likely signific ant environmental effects which removes permitted
development rights. This triggers the need for an Environmental Impact
Assessment (EIA) and
this in turn means planning permission is required. In
addition to the physical works and the likely significant environmental effects this
report also considers the mitigation required and proposed for any detrimental
impacts arising from the proposals.
1.3 The proposals do not relate to any increase in passenger numbers, and the
application does not seek to raise or al ter the 480,000 air traffic movement cap
Hillingdon Planning Committee – 16th December 2025
PART 1 – Members, Public & Press
set as part of the Terminal 5 (T5) planning consent. Consequently, these
proposals do not seek to enable any expansion in either the airport size or
operational air traffic movements. However, the proposed works would
theoretically increase potential operational capacity had that not otherwise
already been capped.
1.4 The decision to end the Cranford Agreement is described in the main body of
the report, as is the outcome of a prev ious application/appeal which concerned
development for the purpose of implemen ting alternation. Works to implement
alternation are, in consequence, supported in principle subject to securing
appropriate mitigation and compensation.
The following report sets out an
appraisal of the package of mitigation and compensation solely in the context of
ending the Cranford Agreement and enabling full al ternation when the airport
operates easterly departures. Any future consideration of Heathrow Airport
operations will be assessed separately and in accordance with the prevailing
evidence base and in the context of benefits and disbenefits
. This proposal is
therefore considered on its own merits and without any prejudice to
consideration of future Heathrow Airport related proposals.
1.5 As noted above, the proposed development is subject to an Environment Impact
Assessment under the Town and Country Planning (Environmental Impact
Assessment) Regulations 2017 [the EIA Regulations]. The planning application
is supported by a substantial number of assessments and reports, including an
Environmental Statement, to ensure that its effects are assessed appropriately.
The environmental aspects included within the Environmental Statement are:
i.
Noise and Vibration;
ii. Air Quality;
iii. People and Communities;
iv. Public Health;
v. Landscape and Visual Impact Assessment;
vi. Historic Environment; and
vii. Biodiversity.
1.6 Overall, the Local Planning Authority considers that the Environmental
Statement, as supplemented with additional information within the application
submission
, is sufficient to enable the Local Planning Authority to take a decision
in compliance with the EIA Regulations,and it has been appropriately considered
in reaching the recommendation to grant planning permission.
1.7 Heathrow Airport operates either on ‘easterly’ or ‘westerly’ operations,
depending on the wind conditions. Aircraft normally take off and land into the
wind, with the prevailing winds at Hea throw Airport coming from the west.
Because
airport operations are therefore dictated by climatic conditions the
mode of operations varies. However, in general, westerly operations occur for
approximately 70% of the time, with easterly operations occurring for about 30%.
1.8 During the day, the airport currently alternates (‘swaps’) the use of the two
runways when on westerly operations, this provides local communities with
Hillingdon Planning Committee – 16th December 2025
PART 1 – Members, Public & Press
scheduled periods of respite. The present pattern means that from 06:00 until
15:00 one runway is used by landing ai rcraft and the other runway is used for
departing aircraft, and then from 15:00 until the last departure the use of the
runways for arrivals
and departures is switched. This is known as runway
alternation.
1.9 Runway alternation has not occurred routinely at the airport during easterly
operations. Therefore, the northern runway is typically not used for scheduled
easterly departures (over the community of Cranford) and the southern runway
is typically not used for arrivals from the west.
1.10 During easterly operations, this means t hat most arriving aircraft land on the
northern runway and most departures take off from the southern runway. This
was originally due to the Cranford Agre ement, which was established in the
1950s to prevent aircraft from taking off over Cranford (located to the east of the
Airport) when Heathrow was on easterly operations. The Cranford Agreement
ended in January 2009
; however, Heathrow Airport has not yet implemented full
runway alternation during easterly operations.
1.11 Physical works are required to the airfie ld to enable the operational changes.
Planning permission in respect of a previous scheme to introduce runway
alternation was granted at appeal under application reference
41573/APP/2013/1288. However, that consent was not implemented and
therefore in order to commence Easterly Alternation, the current application has
been submitted.
1.12 A legacy of the Cranford Agreement is that the western end of the northern
runway does not have the same extent of taxiways and holding areas as the
other runway ends. The infrastructure proposed w
ould provide the new runway
access taxiways to enable regular and routine departures on the northern
runway in an easterly direction (known as Runway 09L) with regular arrivals
occurring on the southern runway (Runway 09R) from the west, when the wind
is blowing from the east.
1.13 These works are relatively limited and relate to additional hardstanding areas for
taxiways and hold areas to serve the western end of the northern runway, plus
the construction of a noise barrier
approximately 781m in length and between
5m to 7m in height near the village of Longford. The location of the works and
further details are provided within Section 3 of this report.
1.14 If approved, the infrastructure works and the subsequent implementation of full
runway alternation during easterly operations w ould not enable any increase in
air traffic movements above the existing limit of 480,000 movements per year,
conditioned as part of the Terminal 5 planning consent (application reference
47853/93/0246).
1.15 Subject to providing an appropriate package of mitigation measures, the
principle of permitting the introduction of Easterly Alternation was established
through the formal decision by government to end the Cranford Agreement, and
Hillingdon Planning Committee – 16th December 2025
PART 1 – Members, Public & Press
through the grant of planning consent by the Secretaries of State to the previous
application, reference 41573/APP/2013/1288.
1.16 When the adverse impacts of the change in operations were examined at a
planning inquiry as part of the appeal process for application reference
41573/APP/2013/1288, the Secretaries of State agreed with the Planning
Inspector that the principle of allowing easterly alternation had been settled and
that the questions to be addressed through an application related to “…whether
or not the proposed mitigation and compensation measures for those likely to be
affected by the proposals can be regarded as ‘appropriate’.”
1.17 The redistribution of flying activity around Heathrow would result in some people
benefiting from a reduction in noise and overflying with new periods of respite
introduced. However, some areas would be adversely affected. The fact that
some adverse effects would arise from Easterly Alteration was known when the
Cranford Agreement ended and when the Secretaries of State allowed HAL’s
previous planning application in 2017.
1.18 The previous appeal decision is a material consideration in the determination of
this application. One important reason why such previous decisions are capable
of being material is that like cases should be decided in a like manner, so that
there is consistency in public decision making. The current application is made
for the purpose of introducing alternation, which is consistent with the previous
application. Subject to the sufficiency and appropriateness of mitigation and
compensation; and in the absence of a change of circumstances, the principle
of development has been treated as established. The principles raised by the
current application have already been examined through an independent inquiry
and the proposals supported by the Secretaries of State.
1.19 This application therefore includes consideration of not only the physical works
proposed to enable Easterly Alternation, but also whether the mitigation and
compensation measures proposed through the planning process for those
properties and individuals adversely impacted are appropriate.
1.20 The physical works proposed are all within the administrative boundary of the
London Borough of Hillingdon. However, the wider impacts - in particular in
relation to noise - of the proposed change, both positive and negative, in terms
of aircraft movements and flight paths cover a much broader area. Therefore, an
extended consultation process has been undertaken by the LPA for this planning
application in terms of time, breadth and platforms utilised (in comparison with
standard procedures). Full details are set out within Section 6 of this report.
1.21 The main adverse impacts of introducing Easterly Alternation relate to noise and
air pollution.
Noise
1.22 As stated above, the proposed development facilitates a change in the pattern
of aircraft movements during easterly operations. Specifically, an increase in the
Hillingdon Planning Committee – 16th December 2025
PART 1 – Members, Public & Press
number of aircraft departing to the east on the northern runway and arriving on
the southern runway during easterly operations, with commensurate decrease
in the number of aircraft departing to the east on the southern runway and
landing to the east on the northern runway during the same mode of operations.
In turn, there would be changes in the noi se environment around the airport,
caused by that change in operations.
1.23 The submitted Environmental Statement, including its assumptions and baseline
data has been robustly interrogated and its findings reviewed by an independent
noise specialist on behalf of the LPA.
1.24 The Noise Policy Statement for England (NPSE) sets the framework for
managing noise impacts, aiming to avoid significant adverse effects, mitigate
impacts, and improve quality of life. The relevant key thresholds are:
- LOAEL (Lowest Observed Adverse Effect Level): Point where noise
begins to cause measurable harm.
- SOAEL (Significant Observed Adverse Effect Level): Higher threshold
requiring strong mitigation.
1.25 The health impacts of aviation include links to noise sleep disturbance, chronic
annoyance, cardiovascular disease, metabolic disorders, mental health issues,
and cognitive effects in children. Annoyance is recognized as a health- related
outcome, not just inconvenience.
1.26 The Civil Aviation Authority’s CAP 15 06 (Survey of Noise Attitudes) shows
increasing sensitivity to aircraft noise and annoyance at lower levels than before.
The World Health Organisation (WHO) highlights annoyance and sleep
disturbance as critical health outcomes.
1.27 There is no adopted land use planning policy document that sets a confirmed
level for either LOAEL or SOAEL. This application presents LOAEL at 51 dB
LAeq,16hr and SOAEL at 63 dB LAeq,16hr, and as matters stand , these
threshold levels have been accepted for the purpose of this application.
1.28 However, at a recent inquiry for Gatwick the Examiner challenged this, proposing
lower thresholds for LOAEL at 45 dB and SOAEL at 54 dB. The Secretary of
State indicated some support for this position but ultimately accepted 51 dB and
63 dB as LOAEL and SOAEL respectively.
1.29 A recent planning decision at Luton concur red with the final position at Gatwick
of maintaining 51/63 dB daytime and 45/55 dB night-time.
1.30 In terms of overall noise impacts it is recognised that there will be benefits and
disbenefits to residents in the areas surrounding Heathrow. Ending the Cranford
Agreement improves equity in terms of predictable respite periods and would
improve operational efficiency for HAL. The introduction of Easterly Alternation
would result in approximately 62,100 people benefitting from reduced noise,
Hillingdon Planning Committee – 16th December 2025
PART 1 – Members, Public & Press
while 39,600 would experience an increase. It has been predicted that 15,400
people would face moderate adverse effects (>3 dB above LOAEL).
1.31 In addition to providing predictable respite periods, HAL have proposed the
compensation measures set out in this report. It should be noted that the noise
modelling is based on 2028 fleet assumptions, and should the application be
approved that the legal agreement will require a reassessment be undertaken
with updated fleet mix details before implementation. The updated noise
assessment would include modelling for ‘with’ and ‘without’ Easterly Alternation
scenarios, to be carried out by the Environmental Research and Consultancy
Department (ERCD) as part of the UK Civil Aircraft Noise Contour Model
(ANCON). The updated noise assessment shall be based on the latest forecasts
and associated route allocations for the then current fleet.
1.32 In conclusion on noise, despite there being an evolving evidential position on
aircraft noise and responses to it, the threshold levels proposed have been
properly justified and are accepted for the purpose of this application. Subject to
the further assessment discussed above being undertaken, H AL’s general
mitigation package is considered adequate and consistent with precedent.
Air Pollution
1.33 The site lies within an Air Quality Management Area and a designated Air Quality
Focus Area, where air quality concerns ar e already significant. These factors
have heightened scrutiny of the project’s potential impacts and the adequacy of
proposed mitigation measures.
1.34 The proposed change in aircraft movements at ground level (i.e. through taxiing)
as a result of implementing Easterly Alternation would not lead to a significant
increase in air pollution. However, it would alter the distribution of air pollution
and introduce
greater pollution in some areas, with reduced air pollution in
others. The increase in air pollution would most notably be to the village of
Longford to the northwest of Heathrow, and critically to the north of the western
end of the Northern runway. With a significant increase in flights taking off in an
easterly direction from the Northern runway, there would be an increase in
aircraft taxiing to the western end.
1.35 An initial review by the council’s Air Quality Specialist raised concerns regarding
the omission of sensitive receptors and lack of ultrafine particle (UFP)
assessment.HAL’s response to these concerns was to confirm that in their view
the air quality impacts are negligible, with slight NO increases at a few
properties. They argue that the Air Quality Neutral policy doesn’t apply to aviation
emissions and disputed the damage cost calculations provided by the council’s
Air Quality Specialist, noting that they were based solely on taxi
-out emissions
and did not account for reductions in taxi-in emissions.
1.36 The LPA’s position is that the impacts of the development are not insignificant,
even if classified as “negligible” in the Environmental Statement. Small changes
in pollutant levels are real, measurable, and contribute to cumulative exposure.
Hillingdon Planning Committee – 16th December 2025
PART 1 – Members, Public & Press
Therefore, the development must aim for air quality neutrality, and HAL are
expected to follow the same mitigation and of fsetting standards as other major
developments.
1.37 However, operational improvements proposed by the scheme should be factored
in. HAL already operates extensive air quality action plans, which is a material
consideration, but further mitigation is still required. Officers have secured a
bespoke Air Quality Action Plan for Lo ngford, supported by £100,000 funding,
alongside H AL’s existing commitments and operational benefits. This is
considered an acceptable planning position.
1.38 In addition, officers have agreed with the applicant that HAL would fund at least
one additional UFP monitor and that a UFP Monitoring and Action Plan will be
secured through the s106 legal agreement , should the application be granted.
Final details related to this Heads of Term remain under discussion with the
applicant at the time of writing and an update shall be provided to Members
through the Planning Committee Addendum/at the Planning Committee.
Mitigation Proposals
1.39 HAL have proposed Noise and Air Quality Mitigation packages which officers
consider to be broadly appropriate.
1.40 The headline details of the mitigation packages have been set out at the start of
this report as the proposed Heads of Terms for Members of Planning Committee
to consider. Officers have requested authority to negotiate the final details of the
S106 legal agreement.
Executive Summary Conclusion
1.41 Overall, the application seeks consent for the physical works that would enable
Easterly Alternation following the end of the Cranford Agreement. The proposals
would introduce respite to areas that currently receive none during easterly
operations and wher
e areas are likely to receive significant additional noise or
air pollution then mitigation is proposed and would be secured through a legal
agreement.
1.42 Due regard has been given to the comments received as part of the consultation
process and it is concluded that the proposal complies with the Development
Plan. Section 38(6) of the Planning and Compulsory Purchase Act 2004 states
that planning applications should be determined in accordance with the
Development P lan unless material considerations indicate otherwise. For the
reasons outlined above and within the main body of the report, this application
is considered to comply with the Development Plan
overall and is recommended
for approval, subject to securing the p lanning conditions set out in Appendix 1
and a Section 106 legal agreement with the Heads of Terms set out above.
Hillingdon Planning Committee – 16th December 2025
PART 1 – Members, Public & Press
2 The Site and Locality
2.1 The application site is Heathrow Air port, the United Kingdom’s largest and
busiest airport, located approximately 14 miles (23 km) west of Central London.
It serves as a major international gateway
and is an important component of the
UK’s transport infrastructure, supporting national and international connectivity,
cargo logistics, and economic activity.
2.2 Heathrow Airport is located in the south of the borough on the boundaries with
Hounslow, Spelthorne, Slough and Buckinghamshire Local Planning Authorities.
The Airport occupies approximately 1,227 hectares (ha) of land and operates
two parallel runways, with four operational terminals. The existing infrastructure
is comprised of the hardstanding runways, terminal buildings, taxiways, aprons,
auxiliary buildings and airfield grassland.
2.3 In 2019, Heathrow Airport handled over 80 million passengers, though this figure
saw temporary reductions due to the COVID -19 pandemic. As of 2024, it has
returned to pre-pandemic levels of passenger numbers. The Airport operates 24
hours a day, seven days a week. There are circa 650 aircraft arrivals and 650
departures every day at the Airport, with the number of Air Transport Movements
(‘ATMs’) capped at 480,000 movements per annum, as a condition of the T5
planning permission granted in 2004 (application reference 47853/93/0246).
A summary of the existing infrastructure within the airport is set out below:
2.4 1. Runways: the northern runway (known as 09L/27R) with a length of 3,902
metres and the southern runway (known as 09R/27L) of 3,660 metres, both lie
east/west in their orientation.
2.5 2. Terminals: the Airport has four terminals operating where passengers arrive
at and depart from the Airport. Terminal 1 (T1) closed in 2015. Terminal 2 (T2)
and Terminal 3 (T3) form a cluster of terminal buildings known as the Central
Terminal Area (‘CTA’) which sits in the ce ntral area of the Airport, between the
northern and southern runways. Terminal 4 (T4) lies to the south of the airport
and Terminal 5 (T5) lies at the western end of the airport between the runways.
2.6 3. Taxiways: the Airport has a taxiway network used by aircraft to circulate
between terminals and the runways under the guidance of Air Traffic Controllers.
The taxiway network comprises four parall el taxiways (two serving each of the
runways), which are linked by cross field taxiways. There are also taxiways south
of the southern runway, including one parallel taxiway, connecting T4 and the
cargo area to the rest of the Airport. Runway links, including exit taxiways and
Runway Access Taxiways (‘RATs’), connect the parallel taxiways to the runways
themselves and are used by aircraft entering and exiting the runways. More
minor taxiway links and cul
-de-sac taxi lanes connect all the taxiways to the
aircraft stands.
2.7 4. Aprons: are used for the parking of ai rcraft, refuelling, and the loading and
unloading of passengers and freight. Each terminal building at Heathrow has its
Hillingdon Planning Committee – 16th December 2025
PART 1 – Members, Public & Press
own aprons. Additionally, there is a dedicated cargo apron in the south of the
Airport for freight aircraft and maintenance aprons in the east of the Airport.
2.8 5. Ancillary facilities: are designated to support the operation and maintenance
of the Airport. These include maintenance and repair facilities, warehousing and
cargo storage facilities and other airport operational land (such as surface water
pollution control, balancing ponds, construction compounds for ongoing work,
in
–flight catering facilities, air traffic control, baggage and parking for service
equipment). These are located across the Airport.
2.9 The Airport is accessible by car, from the M4 and M25 motorways which are
located to the north and west respectively. The highway network links the Airport
to its surroundings through perimeter roads. The perimeter road immediately to
the north of the Airport is called Wright Way. There are eleven car parks for short
stay and long stay located within and adjacent to the Airport’s boundary,
including the POD parking at T5, which allows passengers to get to and from the
terminal in a driverless, electric transit solution.
2.10 Heathrow Airport is also very well connecte d by public transport, including the
Heathrow Express (from London Paddington), the Elizabeth line (from central
London), the London Underground (via Piccadilly line). A rail
-air bus link also
provides regular connections by bus and coaches between Heathrow Airport and
National Rail stations at Feltham, Guil dford, Reading, Watford Junction and
Woking, to supplement a network of bus services.
2.11 The Duke of Northumberland’s River flows around the western boundary of the
airport and encloses the T5 POD car park to the northwest.
2.12 The surrounding area is characterised by a mixed use of hotels, office space,
industrial, commercial and residential uses. There are several communities
bordering Heathrow’s perimeter including:
• To the north: Longford, Harmondsworth, Sipson, Harlington.
• To the east: Cranford and Hatton.
• To the south: West and East Bedfont, Stanwell and Stanwell Moor.
• To the west: Colnbrook, Poyle and Windsor.
2.13 Whilst the immediate surroundings are urban areas, to the north-west, south-
west and west, the Airport setting is also characterised by land within the Green
Belt or other open areas i.e. more rural in character where development is more
restricted. Significant to the determination of this application in terms of air quality
impacts, to the north west of the Airport li es the village of Longford. Longford is
a linear village, laid out either side of the Bath Road. The centre of the village is
a Conservation Area, designated in 1988.
Hillingdon Planning Committee – 16th December 2025
PART 1 – Members, Public & Press
Figure 1: Ariel view of Heathrow Airport
2.14 The physical works that are proposed in the current application are to be
undertaken in the western half of the airfield as set out in the Location Plan
below.
Figure 2: Location Plan (application site edged red)
Hillingdon Planning Committee – 16th December 2025
PART 1 – Members, Public & Press
2.15 The proposed amendments to provide the two new Runway Access Taxiways
(RATs) to the western end of the Northern Runway would be within an area that
currently provides an existing RAT, aprons and open grassland.
Figure 3: Photo of the western end of the northern runway and existing RATS
Figure 4: Photo of the western end of the northern runway and existing RATS
Hillingdon Planning Committee – 16th December 2025
PART 1 – Members, Public & Press
Figure 5: Photo of the southern runway and existing RATS with excess
hardstanding
2.16 On the line of the proposed noise barr ier (discussed in greater detail in Section
3 of this report below) there is currently an existing wooden noise barrier,
approximately 3.0m in height, that runs parallel to Wright Way, the Western
Perimeter Road and th e Duke of Northumberland River. The existing noise
barrier finishes west of the T5 Pod Car Park where there is a gate access point
to the Twin Rivers
1 maintenance track. The access gate is a palisade fence type
construction with no noise barrier pr operties. The majority of the boundary
around the T5 POD car park is fenced, with sections of both wooden and wire
mesh fence construction approximately 2.0 to 3.0m in height.
ϭdŚĞƵŬĞŽĨEŽƌƚŚƵŵďĞƌůĂŶĚZŝǀĞƌĂŶĚƚŚĞ>ŽŶŐĨŽƌĚZŝǀĞƌ͕ďŽƚŚƐĞĐƚŝŽŶƐŽĨĂƌƚŝĨŝĐŝĂůǁĂƚĞƌǁĂLJĚŝǀĞƌƚŝŶŐǁĂƚĞƌ
ĨƌŽŵƚŚĞZŝǀĞƌŽůŶĞƚŚĂƚƌƵŶŝŶƉĂƌĂůůĞůĨŽƌƐĞĐƚŝŽŶƐĂĚũĂĐĞŶƚƚŽ,ĞĂƚŚƌŽǁ͛ƐďŽƵŶĚĂƌLJ͘
Hillingdon Planning Committee – 16th December 2025
PART 1 – Members, Public & Press
Figure 6: Image of the existing noise barrier location adjacent to the Duke of
Northumberland River
Hillingdon Planning Committee – 16th December 2025
PART 1 – Members, Public & Press
Figure 7: Image of the proposed route for the noise barrier following the Duke
of Northumberland River
Hillingdon Planning Committee – 16th December 2025
PART 1 – Members, Public & Press
Figure 8: Image of the existing noise ba rrier below the existing elevated POD
route
Figure 9: Image of the proposed route fo r the noise barrier following the Two
Rivers
Hillingdon Planning Committee – 16th December 2025
PART 1 – Members, Public & Press
Figure 10: View from the Two Rivers towards the south
Figure 11: View of the existing noise barrier towards the T5 POD car park
Hillingdon Planning Committee – 16th December 2025
PART 1 – Members, Public & Press
Figure 12: View across the Two Rivers
Figure 13: View of existing noise barrier from within the T5 POD Car Park
Hillingdon Planning Committee – 16th December 2025
PART 1 – Members, Public & Press
Figure 14: View of existing noise barrier from within the T5 POD Car Park
2.17 The application site covers a significant area and is predominantly located within
Flood Zone 1. Part of the site and the wider area is within the Heathrow Airport
Public Safety Zone. A Nature Conservation Site of Metropolitan or Borough
Grade I Importance intersects the location of the proposed noise barrier and an
Archaeological Priority Area also intersects the site’s red line bound
ary. There
are no Tree Preservation Orders that cover the site.
Hillingdon Planning Committee – 16th December 2025
PART 1 – Members, Public & Press
Figure 15: Policy Constraints Map
2.18 Directly adjacent to a significant sect ion of the proposed noise barrier is
designated as green belt (see image below). The barrier is not proposed to be
located within the designated green belt, however when the previous application
was considered, the T5 POD car park was part of the Green Belt. The Green
Belt boundary has changed in the immediate vicinity of the T5 POD car park as
a result of the adoption of the Hillingdon Local Plan Part 2: Site Allocations and
Designations (adopted January 2020)
. The change was justified as follows: the
area previously in the Green Belt was “separated from the adjoining main Green
Belt area in the Colne Valley by the Duk e of Northumberland’s River. Longford
Green has been fully developed and is now occupied by the Heathrow Business
Class Car Park. As such, both sites do not meet any of the purposes of including
in the Green Belt as identified in the NPPF at paragraph 80…”
Hillingdon Planning Committee – 16th December 2025
PART 1 – Members, Public & Press
Figure 16: Map showing Green Belt boundary at Longford
3 Proposal
3.1 The description of development proposed is as follows:
3.2 “Enabling works to allow implementation of full runway alternation during easterly
operations at Heathrow Airport including the creation of a new 'hold area' at the
western end of the northern runway, the construction of new access and exit
taxiways, the construction of an acoustic noise barrier to the south of Longford
Village and temporary construction compounds.”
3.3 It is important to note that the plann ing application is for the physical works to
enable Easterly Alternation to come into full operation. Therefore, this section of
the report will focus on details of the physical works proposed first, before
detailing what Easterly Alternation me ans in terms of how Heathrow Airport
operates. The impacts of Easterly Alternation operations are then discussed
within the body of the report, along with the effects from the physical proposals.
Hillingdon Planning Committee – 16th December 2025
PART 1 – Members, Public & Press
Figure 17: Aerial photograph showing location of proposed Noise Barrier and new
access ways
Airfield Proposed Infrastructure
3.4 The scale of the proposed airfield infrastructure works is relatively limited. It
comprises a number of alterations to t he pavement areas of the airfield around
the northern and southern runways. These alterations include additional taxiway
infrastructure in the north-west corner of the airfield to provide additional capacity
to allow departing aircraft to efficiently access the Northern Runway. This would
form part of the Northern Runway’s Runway Hold Area (‘RHA’).
3.5 To offset the increased new taxiway pavement area and to ensure for drainage
purposes that the works do not increase th e overall extent of impervious area,
redundant airfield pavement w ould be removed and reinstated as grass areas
near the Southern Runway of the airfield.
Figure 18: Existing Western End of Northern Run
Hillingdon Planning Committee – 16th December 2025
PART 1 – Members, Public & Press
Figure 19: Proposed layout for the western end of Northern Run
3.6 Currently the Northern Runway has one main Runway Access Taxiway (RAT),
which is located at the western end of the runway. There is a second RAT
approximately 550m east, however accessing the runway via this route results
in a shorter runway length being available, which limits the airports operational
performance.
3.7 When compared to the other three run way ends on Heathrow’s airfield, the
western end of the northern runway has less infrastructure, including less
taxiway routes onto the runway.
At present there are a minimum of three RATs
provided on each of the other runway ends. This is a legacy of the northern
runway not being routinely used for take
-offs to the east. All the other three
runway ends on Heathrow’s airfield are accessible via two or more non-disrupted
taxiway routes within the RHAs, i.e. ta xiway routes that are not adjacent to
aircraft stands and need to provide additional capacity for stand access and push
back manoeuvres.
3.8 The main purpose of providing additional taxiway infrastructure in the north-west
corner of the airfield is to provide additional capacity to allow departing aircraft
to access Runway 09L more easily. The additional infrastructure would form part
of the 09L Runway Hold Area (RHA). A key aim of the proposed layout is to
provide comparable performance for the 09L RHA compared to Heathrow’s other
runway ends, including providing an efficient and reliable taxiway network with
adequate resili
ence and no single p oints of failure. This includes providing
additional routes onto the runway via new RATs, and developing a taxiway layout
that accommodates the ingress and egress routes onto the stands located on
the north face of Terminal 5a.
Hillingdon Planning Committee – 16th December 2025
PART 1 – Members, Public & Press
3.9 The proposed layout consists of the following elements:
- Three parallel taxiways, parallel to the runway centreline. The two most
northern parallel taxiways would primarily be used as part of the runway hold
area. The third, most southern parallel taxiway would primarily be used to provide
access and egress from the existing aircraft stands on the north side of the T5a
terminal.
- A taxiway link connecting the three parallel taxiways.
- Two new Runway Access Taxiways (R ATs), which would provide a taxiway
route for aircraft departing from Runway 09L. Note these RATs would be used
in parallel with the existing RAT at the westernmost end of the northern runway
3.10 The layout of the new taxiways is in a ccordance with minimum clearances as
required by the Civil Aviation Authority (CAA) standards. The area would be
operated by air traffic controllers who w ould utilise the network of parallel
taxiways, taxiway links and RATs, to pr ovide the most efficient and safest
sequence for the departing aircraft at the same time as providing access to and
from the T5a stands.
3.11 Since the previous 2013 planning application, changes in airfield design
standards, specifically a reduction in the minimum clearance required between a
taxiway and runway, has meant it is viable to provide three parallel taxiways within
the 09L RHA. This has the significant advantage that a taxiway can provide
access to and egress from the aircraft stands on the north side of T5a separate
to the runway hold taxiways. This subsequently meant the operational
environmental impacts associated with queuing aircraft, such as noise and air
quality, were reduced and safety improved since the 2013 proposal.
3.12 A total length of 4,235m of new taxiway centrelines is proposed to be provided,
with a total area of 35,000m2 new taxiway pavement being constructed. To offset
the increase in new taxiway pavement area, 38,800m2 of redundant airfield
pavement is proposed to be removed and reinstated as grass area. Out of the
38,800m2 of redundant pavement to be removed, 13,650m2 w
ould be within the
footprint of the western end of the northern runways RHA and 25,150m2 would
be located near the southern runway, on the airfield. All of the redundant
pavement removed
would be within the same surface water drainage catchment
area.
Hillingdon Planning Committee – 16th December 2025
PART 1 – Members, Public & Press
Figure 20: Redundant pavement for reinstatement with grass (southern runway)
3.13 The majority of the new airfield pavement would be constructed from Pavement
Quality Concrete (PQC). RAT pavement within the runway strip, which is defined
as 105m from the runway centreline, would be constructed from composite
pavement. Composite pavement is constructed from a concrete base and
overlaid with asphalt. Therefore, areas of composite pavement
would be asphalt
at the finished ground level. This is consistent with new RATs built on Heathrow’s
airfield today.
3.14 Aeronautical Ground Lighting (AGL) would be installed along the centreline and
stop bar positions of the new taxiways. The spacing of the centreline lights is
typically 60m along straight sections of taxiways and 30m around curved
sections and junctions. The AGL
would be illuminated during periods of low
visibility and non-daylight operational hours. The presence and use of AGLs is
consistent with the airfield today.
3.15 The new taxiway infrastructure would be limited to gradients of 1.5% and below
and therefore would appear ‘flat’. The new taxiways would tie- into the existing
taxiway network at the existing levels.
3.16 There would be no additional floodlight or airport perimeter lighting provided as
part of the proposed scheme.
3.17 Where redundant airfield pavement is removed, it would be reinstated to grass
areas. The grass would be a specific seed mix to reduce any bird attraction. The
appearance of the grass will be compar able with grass areas on Heathrow’s
Hillingdon Planning Committee – 16th December 2025
PART 1 – Members, Public & Press
airfield today. Areas of grass which would be exposed to aircraft blast would
have blast treatment.
Proposed Noise Barrier
3.18 A noise barrier is proposed to the south of the village of Longford. The noise
barrier would range between 5m to 7m in height and be approximately 781m in
length. The proposed 5m height noise barrier alignment would be in total 235m
in length and the proposed 7m section would be 546m long. For part of its length,
it would replace an existing acoustic barrier running alongside Wright Way and
a close boarded timber fence which marks the boundary of the T5 POD car park.
Figure 21: Existing Fence/Noise Barrier – Site Layout
3.19 Currently there is an existing wooden noise barrier, approximately 3m in height,
that runs parallel to Wright Way, the Western Perimeter Road and the Twin
Rivers. The noise barrier finishes west of the T5 Pod Car Park where there is a
gate access point to the Twin Rivers maintenance track. The access gate is a
palisade fence type construction with no noise barrier properties. The majority of
the boundary around the T5 POD car park is fenced, with sections of both
wooden and wire mesh fence construction approximately 3m in height. Outside
of the T5 POD car park boundary, adjacent to the fence on the non
-car park side
is areas of vegetation including trees.
3.20 The existing noise barrier is proposed to be replaced by the proposed enhanced
barrier, the details of which are set out below.
Hillingdon Planning Committee – 16th December 2025
PART 1 – Members, Public & Press
Figure 22: Proposed Noise Barrier General Arrangement
3.21 The proposed barrier would extend parallel to Wright Way and the Western
Perimeter Road, and around the West and North boundary of the T5 Business
Car Park (T5 POD Parking).
The primary function of the noise barrier is to provide
noise mitigation to properties within Longford village against ground noise at the
northern runway end. The barrier would be constructed before other works and
would limit noise in Longford from construction works on the airfield.
3.22 In addition to providing noise mitigation, the noise barrier would also act as a
security boundary to the Twin Rivers and T5 POD parking. The noise barrier
would replace existing fencing adjacent to the Twin Rivers. An access gate
would be provided within the noise barrier to provide maintenance access to the
Twin Rivers site. The access gate wou ld be secured and only accessible to
authorised users. The gate would be located on the existing maintenance access
track, and therefore maintenance access to the Twin Rivers site would be
maintained.
3.23 As stated above, the noise barrier would be between 5m and 7m in height. It is
proposed that the top 2m and 4m respectively of the barrier would be constructed
from transparent Perspex type material. The bottom 3m of barrier would be
constructed from non-transparent material, with an external wooden finish.
3.24 Should the planning application be granted, it is proposed (and agreed by the
applicant), that a condition be attached to the consent requiring full details of the
barriers proposed construction and materials. Details of maintenance will also
be required, along with what measures will be used to avoid birds flying into the
upper transparent section of the barrier. This may include lines within the
material that
are visible to birds, thus alerting them to the presence of the barrier,
but are not clear to the human eye from anything other than a very close
distance.
Hillingdon Planning Committee – 16th December 2025
PART 1 – Members, Public & Press
Figure 23: Section of proposed 5m high barrier adjacent to Duke of
Northumberland River
Figure 24: Section of proposed 7m high barrier adjacent to T5 POD Parking
3.25 No dedicated lighting is proposed to be provided as part of the noise barrier.
However, the existing street lighting whic h runs parallel to the existing noise
barrier may be removed and re -provided to facilitate construction. The existing
lighting level is not proposed to be increased.
Hillingdon Planning Committee – 16th December 2025
PART 1 – Members, Public & Press
3.26 Ground levels of the areas surrounding the noise barrier would remain
unchanged. Around the T5 POD car park, the noise barrier would follow the
alignment of the existing fence. Theref ore, the existing vegetation and trees
beyond the barrier would be retained where possible. Where viable, the spacing
and location of post foundations would be adjusted to avoid tree roots.
3.27 A noise barrier was also consented under the previous 2013 planning application
scheme, the current proposal follows the same alignment except for adjacent to
the
Twin Rivers maintenance track, directly west of the T5 POD car park access,
where it has been adjusted to allow the proposed scheme to sit outside of the
Green Belt boundary.
3.28 Since the previous 2013 planning appl ication, there have been some minor
changes to the height at which structures can be built around the airport without
impacting air safety (known as safeguarding surfaces) associated with the airport
and, in particular, those at the location of the noise barrier have increased in
height. As a result, it is now feasible to construct a higher noise barrier without
impeding safeguarding surfaces. Noise modelling was completed by the
applicant prior to submission to assess the impact of a 7m high noise barrier
compared to a 5m high noise barrier, wi th the 7m barrier found to be more
effective. Above 7m in height, the noise modelling undertaken indicated no
significant additional benefit.
3.29 A safeguarding check has been undertaken to ensure the proposed noise barrier
does not infringe any of the airport’s Obstacle Limitation Surface (OLS) 2 and
Instrument Flights Procedure (IFP) 3 safeguarding surfaces in accordance with
CAA requirements.
3.30 The application submission includes a full Visual Impact Assessment and
Viewpoint Analysis, with supporting CGI images of how the barrier would look if
constructed. Summer and winter images are provided and discussed in more
detail in Section 7 of this report.
Easterly Alternation
3.31 The physical works set out above are requ ired to Heathrow Airport’s airfield in
order to enable the implementation of full runway alternation between departures
and arrivals during ‘easterly’ operations.
3.32 The Airport operates two parallel runways, the northern runway (which is called
Runway 09L/27R), and the southern runway (Runway 09R/27L) predominantly
in segregated mode (i.e. with one runway used for landings whilst the other is
ϮdŚĞKďƐƚĂĐůĞ>ŝŵŝƚĂƚŝŽŶ^ƵƌĨĂĐĞ;K>^ͿŝƐĂĚĞĨŝŶĞĚǀŽůƵŵĞŽĨĂŝƌƐƉĂĐĞĂďŽǀĞĂƐĞƚŽĨƐƵƌĨĂĐĞƐĚĞƐŝŐŶĞĚƚŽƉƌŽƚĞĐƚ
ĂŝƌĐƌĂĨƚĨůLJŝŶŐŝŶǀŝƐƵĂůĐŽŶĚŝƚŝŽŶƐ͘/ƚƉƌŝŵĂƌŝůLJĞŶƐƵƌĞƐƚŚĂƚŽďƐƚĂĐůĞƐĚŽŶŽƚŝŶƚƌƵĚĞŝŶƚŽƚŚĞĂŝƌƐƉĂĐĞƌĞƋƵŝƌĞĚĨŽƌ
ƐĂĨĞĂŝƌĐƌĂĨƚŽƉĞƌĂƚŝŽŶƐ͕ƉĂƌƚŝĐƵůĂƌůLJĚƵƌŝŶŐƚĂŬĞŽĨĨĂŶĚůĂŶĚŝŶŐƐ͘
ϯ/ŶƐƚƌƵŵĞŶƚ&ůŝŐŚƚWƌŽĐĞĚƵƌĞƐ;/&WͿĂƌĞƌĞƋƵŝƌĞĚĨŽƌƐĂĨĞĂŶĚĞĨĨŝĐŝĞŶƚĂŝƌĐƌĂĨƚŽƉĞƌĂƚŝŽŶƐ͘dŚĞLJĂƌĞĚĞƐŝŐŶĞĚƚŽ
ĨĂĐŝůŝƚĂƚĞĨůŝŐŚƚŽƉĞƌĂƚŝŽŶƐƵŶĚĞƌŝŶƐƚƌƵŵĞŶƚĨůŝŐŚƚĐŽŶƚƌŽů;ŝ͘ĞŶŽŶǀŝƐƵĂůͿĂŶĚŝŶĐůƵĚĞĂƐĞƌŝĞƐŽĨƉƌĞĚĞƚĞƌŵŝŶĞĚ
ŵĂŶŽĞƵǀƌĞƐƌĞĨĞƌĞŶĐĞĚďLJĨůŝŐŚƚŝŶƐƚƌƵŵĞŶƚƐ͘
Hillingdon Planning Committee – 16th December 2025
PART 1 – Members, Public & Press
used for take-offs) to facilitate aircraft movements from four different runway
ends. Runway numbering reflects points of the compass, and a single runway
orientated in an east/west direction would be designated runway ‘09’ when in
use in an easterly direction and runway ‘27’ when in use in a westerly direction.
Heathrow’s two runways are therefore kn own as 27R (right, for the northern
runway) and 27L (left, for the souther n runway) when being used in a westerly
direction and 09L (northern) and 09R (southern) when used in an easterly
direction.
3.33 Aircraft movements are particularly dist urbing immediately after departure and
on arrival. The benefit of having two runways and 4 access/departure points is
that aircraft can be distributed across the airport to reduce noise impacts. This is
known as runw
ay alternation and is important in managing aircraft noise for
impacted communities.
Figure 25: Heathrow Airport runway end designations
3.34 Due to aerodynamic and safety reasons, ai rcraft typically take-off and land into
the wind. As the prevailing wind directio n at Heathrow is from a south westerly
direction, the Airport is on westerly operations for most of the time, i.e. take-offs
are therefore usually towards the west, in the direction of Windsor, whilst arrivals
are from the east over central London (known as operating on westerlies). Over
the last 20 years (2003 -2022) westerly operations have occurred on average
very approximately 70% of the time, meaning the arrivals and departures to the
east have occurred around 30% of the time, i.e. 70% of operations are westerly
with departures over Windsor and Old Windsor on 09L and 09R. The precise
percentage balance between west and ea st can vary year to year as
meteorological conditions are never exactly the same.
Hillingdon Planning Committee – 16th December 2025
PART 1 – Members, Public & Press
Figure 26: Heathrow’s current operation – wind direction
3.35 The Airport’s runways predominantly adopt a segregated mode of operation.
Under segregated mode, at any time, local residents at one end of each runway
will not be over flown either by arriving or departing aircraft - and will experience
what is termed ‘respite’. During westerly op erations, this activity is swapped in
the middle of the operating day. Operationally this means (on westerly
operations) that from 6:00
am to 3:00pm departing aircraft are directed to one
runway and arriving aircraft are directed to the other. The schedules are then
alternated or swapped to the other runway from
3:00pm until the final movement,
in order to provide predictable periods of respite to residents at the other end of
each runway. The pattern is also swapped weekly, as shown below , to give
greater variation and respite.
Hillingdon Planning Committee – 16th December 2025
PART 1 – Members, Public & Press
Figure 27: Direction of arrivals and depart ures on 27R and 27 L during westerly
operations (over a two-week period)
3.36 During easterly operations at present there is no alternation, as such there is a
full day’s worth of respite over Cranford village and over the relatively sparsely
populated Stanwell Moor. Conversely, there is no respite over the relatively
densely populated areas of Windsor and Hounslow. There is no change to
runway operations at 3pm.
Figure 28: Direction of arrivals and depart ures on 09R and 09L during easterly
operations
3.37 Alternation schedules are published in advance by Heathrow and allow
communities under the flight paths to un derstand when they will benefit from
predictable periods of respite.
Hillingdon Planning Committee – 16th December 2025
PART 1 – Members, Public & Press
3.38 Alternation has been successfully used for westerly operations for many years,
providing communities with predictable reli ef from aircraft arrival and departure
noise. However, the Cranford Agreement and the airfield layout which resulted
from it has prevented runway altern ation from being implemented while the
Airport is on easterly operations since the 1950s. Consequently, when the Airport
is on easterly operations, residents living in areas such as Windsor (arrivals) and
Hatton (departures) experience noise from arrivals and departures throughout
the day without respite.
The Cranford Agreement
3.39 The Cranford Agreement was established in 1952 to prevent aircraft departure
noise impacts affecting the nearby community of Cranford, i.e. it prevents aircraft
taking off on 27R on the northern runway, except in exceptional circumstances.
In the 1950s, Heathrow had six runways, arranged in three pairs at different
angles in the shape of a hexagram. At that time, Cranford was the nearest and
largest population centre to Heathrow’s ru nways. Due to the nature of early jet
aircraft, noise from departures was considered to be more disruptive to local
communities than noise from arrivals. The Cranford Agreement was therefore
an early noise abatement measure which was intended to avoid exposing the
nearest population centre to the highest levels of aircraft noise.
Figure 29: Heathrow Airport in the 1950s