Hillingdon Planning Committee – 11th March 2026
PART 1 – Members, Public & Press
Report of the Head of Development Management and Building Control
Committee Report
Case Officer: Michael Briginshaw 79625/APP/2025/2128
Date Application
Valid:
11.08.2025 Statutory / Agreed
Determination
Deadline:
31.03.2026
Application
Type:
Outline Ward: Pinkwell
Applicant: Columbia Threadneedle Investments
Site Address: Land at HPH2, HPH5, and Multistorey Car Park
Hyde Park Hayes
Proposal: Outline planning permission (with all matters
reserved excluding access) for demolition of
existing buildings (above basement level) and
phased delivery of residential development
(Class C3), flexible commercial
/ community
floorspace, new public realm, landscaping, play
space, car parking, cycle parking and associated
works.
Summary of
Recommendation:
GRANT planning permission subject to section
106 legal agreement and conditions
Reason Reported
to Committee:
Required under Part 1 of the Planning Scheme of
Delegation (Major application recommended for
approval)
Hillingdon Planning Committee – 11th March 2026
PART 1 – Members, Public & Press
Summary of Recommendation:
GRANT planning permission subject to the completion of a
satisfactory section 106 legal agreement to secure the heads of
terms set out below, and subject to the conditions as set out in
Appendix 1.
S106 Legal Agreement Heads of Terms:
It is recommended that delegated powers be given to the Director of
Planning and Sustainable Growth to grant planning permission subject to
the following:
A) That the application be referred to the Mayor under Article 5 of the Town
and Country Planning (Mayor of London) Order 2008.
B) That the Council enter into a legal agreement with the applicant under
Section 106 of the Town and Country Planning Act 1990 (as amended) or
any other legislation to secure the following:
i. Affordable Housing: To secure provision of on-site affordable
housing, using a cascade mechanism as follows:
a. To use all reasonable endeavours over a defined period of
time to secure grant funding (in accordance with relevant
guidance) in order to maximise delivery of affordable housing,
with a minimum of 10% of total units (calculated by habitable
room) provided as affordable housing (with a preference for
Social Rent tenure).
b. Should the Council agree that all reasonable endeavours have
been exhausted and grant funding has not been secured, the
scheme shall revert to 100% private market (i.e. with no
affordable housing).
The obligation shall include review mechanisms.
ii. Health Contribution: A financial cont ribution to be calculated at the
Reserved Matters stage, indicatively totalling £942,489 (calculated
on the basis of a 100% private market Scenario and subject to
detailed scheme calculations) to fund enhanced or new health
facilities within the London Borough of Hillingdon. A proportional
amount of the contribution, corresponding to the relevant phase, shall
be paid prior to commencement of that phase.
iii. Air Quality Mitigation Contribution: A financial contribution to be
calculated at the Reserved Matte rs stage, indicatively totalling
£174,299 (subject to detailed scheme calculations). A proportional
Hillingdon Planning Committee – 11th March 2026
PART 1 – Members, Public & Press
amount of the contribution, corresponding to the relevant phase, shall
be paid prior to commencement of that phase.
iv. Carbon Offset Contribution: Carbon Offset Contribution: A financial
contribution to be calculated at the Reserved Matters stage,
indicatively totalling £367,217 (subject to detailed scheme
calculations). The obligation shall include monitoring measures (be
seen). A proportional amount of th e contribution, corresponding to
the relevant phase, shall be paid prior to commencement of that
phase.
v. Public Open Space Contribution: A financial contribution to be
calculated at the Reserved Matters stage, indicatively
totalling £879,450,
for the enhancement of existing public open space. A proportional
amount of the contribution, corresponding to the relevant phase, shall be
paid prior to commencement of that phase. Should the Council agree
that a sufficient high quality open space for each phase is to be
delivered, a contribution will not be required. All on site public open
space should allow unfettered access in perpetuity.
vi. Section 278 Agreement: A Section 278 agreement to deliver a crossing
at North Hyde Road, prior to the occupation of Phase 1.
vii. Hillingdon Council Active Travel Zo ne / Healthy Streets Contribution:
Financial contributions to be calculated at the Reserved Matters
stage, indicatively totalling £140,360. A proportional amount of the
contribution, corresponding to the relevant phase, shall be paid prior
to commencement of that phase.
viii. Transport for London Contributions : Financial contributions to be
calculated at the Reserved Matters st age, indicatively totalling the
following amounts:
a. A312 contribution up to £54,640.
b. Bus Stop Enhancement contribution up to £598,000.
A proportional amount of each contribution, corresponding to the
relevant phase, shall be paid prior to commencement of that phase.
ix. Residential Parking Permit Restrictions: Parking Permits restriction
for residents and visitors (excluding Blue Badge holders).
x. Employment and Construction Training Scheme: An Employment/
Construction Training Scheme secu red in accordance with the
Council's Planning Obligations SPD.
Hillingdon Planning Committee – 11th March 2026
PART 1 – Members, Public & Press
xi. Project Management and Monitoring Fee: A Project Management
and Monitoring Fee, equalling 5% of the total financial contributions
to be paid under this agreement.
C) That in respect of the application for planning permission, the applicant
meets the Council's reasonable costs in prepar ing the Section 106
Agreement and any abortive work as a result of the agreement not being
completed.
D) That officers be authorised to negotiate and agree the detailed terms of
the proposed agreement and conditions of approval and agree any changes
requested by the Greater London Authority.
E) That, if the Legal Agreement has not been finalised within 6 months (or
such other time frame as may be agreed by the Director of Planning and
Sustainable Growth ), delegated authority be given to the Director of
Planning and Sustainable Growth to refuse planning permission for the
following reason:
'The applicant has failed to mitigate the impacts posed by the proposed
development (in respect of
Affordable Housing, Health, Air Quality, Carbon
Emissions, Public Open Space, Active Travel, Highways Safety,
Employment and Planning Obligations Monitoring). The scheme therefore
conflicts with Policies DMCI 7 of th e Hillingdon Local Plan: Part 2 (2020);
the adopted Planning Obligations Supplementary Planning Document
(2014); Policy DF1 of the London Plan (2021); and paragraphs 5
6-58 of the
National Planning Policy Framework (2024).'
F) That if the application is approved, that the permission is subject to the
Conditions as set out in Appendix 1.
1 Executive Summary
1.1 This application seeks Outline Planning Permission (with all matters reserved
excluding access) for demolition of existi ng buildings (above basement level)
and phased delivery of a residential development (Class C3), flexible commercial
/ community floorspace (368m2), new public realm, landscaping, play space, car
parking, cycle parking and associated works.
1.2 More specifically, the development would demolish three buildings within the
Hyde Park Hayes (HPH) estate, including HPH2, HPH5, and the multistorey car
park (MSCP), and would redevelop these plots of land alongside the surface car
park abutting North Hyde Road with residential blocks. HPH1 is outside the red
line boundary of the site but is to be converted from office to mixed-use, including
an office at ground level and residentia l units above (subject to Prior Approval
application reference 67351/APP/2024/2746).
Hillingdon Planning Committee – 11th March 2026
PART 1 – Members, Public & Press
1.3 As the application is in Outline with all matters reserved, the illustrative scheme
for 650 units is proof of concept only . At its maximum, the development could
comprise up to 673 units, subject to controls set out within the Design Code and
Parameter Plans. The illustrative unit mix is proposed to be 44% 1- bed units,
41% 2-bed units and 15% 3-bed units. The housing mix ranges are proposed to
be secured by Condition 6, including provision of at least 15% 3-bed family units.
The residential blocks are propo sed in a mix of urban grains and typologies,
ranging from 3, 6, 8, 10 and 11 stories in height, including denser urban
residential blocks as well as some townhouses.
1.4 The proposed loss of the existing underutilised office use is accepted in principle.
There are no objections to the physical loss of the existing office buildings either
as they are no t considered to have significant architectural merit. Significantly,
the provision of much needed residential units on sustainably located brownfield
land within close proximity to Hayes Town Centre and only 500m (8 minute walk)
of the Hayes and Harlington Station is supported. The proposed flexible
commercial / community space will generate jobs on a site which is generally
accepted as underutilised in its current form. It is noted that the new residents of
the development will provide further bus iness for local traders and support the
vitality and viability of Hayes Town Centre. This weighs significantly in favour of
the development in the planning balance.
1.5 The proposal for 15% family housing (3-bedroom units) is a positive provision for
a large strategic residential scheme and would contribute to meeting need within
the borough. In terms of affordable housing, the scheme has been subject to
viability testing
by the Council's third-party consultants and the Greater London
Authority (GLA). Following such assessment, it has been concluded that a 100%
private market scheme generates a deficit but is within the range of deliverability.
Despite this, the developer
has agreed to enter into a S106 legal agreement
which would obligate them to carry out all reasonable endeavours to secure
grant funding and maximise affordable housing provision on-site. Should it be
sufficiently evidenced , in agreement with the Council, that all reasonable
endeavours have been exhausted and that no grant funding has been secured
to realise affordable housing provision, the scheme would revert to 100% private
market housing. Given the significant viability constraints on the proposed
schem
e, it is concluded that the proposed conditional cascade mechanism would
realise the maximum amount of affordable housing possible, especially given the
announcement of the GLA’s emergency measures for housebuilding which have
been introduced to accelerate housebuilding, unlock stalled sites and provide
housebuilders with more certainty by improving both the viability and
deliverability of residential schemes. The conditional affordable housing cascade
mechanism is proposed to be secured under S106 HoT (i) and includes viability
review mechanisms to capture changes in viability over the lifetime of the multi-
phase residential development.
This is the reasonable and robust evidence
based position which is considered, on the ba lance of probabilities, to realise
sufficient public benefit by maximising the likelihood of affordable housing
delivery.
Hillingdon Planning Committee – 11th March 2026
PART 1 – Members, Public & Press
1.6 Parameter Plans and a Design Code support the Outline Planning application
submission, establishing parameters and design rules that future Reserved
Matters must follow. The Parameter Plans fix maximum building footprints,
heights, land uses, basement extent, move ment routes and the layout of open
space, SuDS, trees and front gardens. The Design Code complements this by
setting the rules for delivering a coherent, landscape
Ǧled and sustainable
neighbourhood, covering massing, active frontages, pedestrianǦfocused streets,
SuDS, biodiversity (10% BNG), urban greening (UGF 0.4), parking strategy and
standards for play, refuse and cycle provision. Despite positive amendments
being made as part of the application process, concerns were raised regarding
the deliverability, quality and functionality of certain open spaces.
Notwithstanding,
the Parameter Plans and Design Code are considered to strike
a reasonable balance against best Ǧpractice Design Code guidance documents,
which emphasise that effective design codes should be simple, specific and
proportionate. To address residual uncertainties and ensure high Ǧquality
delivery, the applicant has agreed that a revised Design Code will be secured by
Condition 22 , alongside further conditions requiring detailed materiality and
landscape information at Reserved Matters stage.
1.7 Other matters which are considered to be planning policy conflicts include the
delivery of a shortfall in amenity space provision, play space provision, and open
space provision. However, these are considered to be minor conflicts with
standards exhibited by the illustrative scheme, not a detailed scheme which
would be submitted as part of the
Reserved M atters stage of the planning
application process. Conditions are proposed to maximise quantity and quality
of these spaces, including a revised Design Code.
1.8 Significant weight is afforded to the Government’s Written Ministerial Statement
on Planning Reform: Next Phase (18 November 2025), which confirms a national
policy intention to “unleash development around rail stations” by providing a
“default yes” to sui
table, wellǦdesigned development within a reasonable walking
distance of wellǦconnected railway and tram stations. The statement emphasises
that development of the right quality a nd density in such locations represents a
highly sustainable form of growth, maximising the use of existing public transport
infrastructure, reducing car dependency, and supporting housing delivery and
economic growth. The Ministerial Statem ent makes clear that this approach
should apply consistently across all local authority areas and is intended to be
embedded within the revised National Planning Policy Framework as a
strengthened expression of the pres umption in favour of sustainable
development. In this context, the application site’s proximity to a major rail station
represents a material consideration of significant weight, and any assessment of
the proposal must give due regard to the Government’s clear expectation that
sustainably located development adjacent to stations should be supported
unless demonstrable harm would clearly outweigh the substantial public benefits
identified.
1.9 Planning obligations are proposed to secure affordable housing provisions,
health contribution, an air quality contribut ion, carbon offset contribution, public
open space contribution, highways works, active travel zone and healthy streets
Hillingdon Planning Committee – 11th March 2026
PART 1 – Members, Public & Press
contribution, TfL contribution, parking permit restrictions, and employment
strategy and construction training. A project management and monitoring fee
would also be secured to manage and monitor the planning obligations.
1.10 Section 38(6) of the Planning and Com pulsory Purchase Act 2004 states that
planning applications should be determined in accordance with the development
plan unless material considerations indicate otherwise. For the reasons outlined
above and within the main body of the report, the application is considered to
broadly comply with the Development Plan. Where there are minor conflicts with
the Development Plan, there are considered to be sufficient mitigating factors
and benefits which outweigh such conflicts . Subject to the planning conditions
and obligations recommended, the proposed development can mitigate the
planning policy conflicts identified. Accordingly, the development is considered,
on balance, to be acceptable with resp ect to design, heritage, residential
amenity, environmental issues, transport, and sustainability.
1.11 The application is recommended for approval , subject to Stage 2 referral to the
Mayor of London, securing the planning conditions set out in Appendix 1 and a
Section 106 legal agreement.
2 The Site and Locality
Figure 1: Location Plan (application site edged red)
Hillingdon Planning Committee – 11th March 2026
PART 1 – Members, Public & Press
2.1 The site is a large plot of land, measuring circa 2.36 hectares in area, and forms
part of the wider Hyde Park Hayes co mmercial estate. The wider estate
comprises three large office buildings called Hyde Park Hayes 1 (HPH1), Hyde
Park Hayes 2 (HPH2) and Hyde Park Hayes 5 (HPH5), and sit alongside a multi-
storey car park (MSCP). Please see Figure 2 below for a view of HPH2 and
HPH5 as seen from Millington Road.
Figure 2: Street View Image of the HPH2 (Background) and HPH5
(Foreground)
2.2 The HPH1 building does not form part of the application submission but is a
material planning consideration and is subject to a Prior Approval application
(ref. 67351/APP/2024/2746) to change the use of the building from offices to a
mixed use, including an office at grou nd level and residential units above. The
ground floor of this building is occupied by Apple on a short term lease and gives
the tenant the right of access to 62 parking spaces, located in the surface level
car park next to HPH1 and the MSCP.
2.3 The Hyde Park Hayes 3 (HPH3) building and Hyde Park Hayes 4 (HPH4) plot
do not form part of the application either and sit on the western edge of the Hyde
Park Hayes site. HPH3 is now occupied as residential flats having been granted
Prior Approval in September 2021 under application reference
72360/APP/2021/1709 for the change of use from offices to 113 flats. HPH4 has
been the subject of application references 76655/APP/2021/3039 and
76655/APP/2023/779 and has been granted permission in April 2022 and June
Hillingdon Planning Committee – 11th March 2026
PART 1 – Members, Public & Press
2023 for the re-development of the site to provide a residential development
comprising 131 units. The HPH4 permissions have now lapsed.
2.4 Residential properties are located to the north of the site along Keith Road and
North Hyde Road, south along Dawley Road and west along Bourne Avenue,
Waltham Avenue, and Guinness Close. The Yodel warehouse is also located to
the north and has been the subject of two planning applications (refs.
27189/APP/2020/2181 and 27189/APP/2021/2782), granting
permission for 150
residential units and 376 no. Shared -Living units. The Premier Inn hotel is also
located to the north-east of the site and has consent under application reference
78950/APP/2024/2084 for alterations to the hotel, resulting in an increase in
hotel rooms from 150 to 159 and reduction in restaurant space.
2.5 The City Circle UK coach storage site, Selco Builders warehouse site and Hayes
Asda Superstore is located to the east of the site. Further commercial uses are
located to the south, including Nippo n Express, Attewell Ltd and Geiger UK.
Further outside of the Hyde Park Hayes site, a roundabout intersecting Dawley
Road, North Hyde Road and Bourne Avenue is located to the west. Millington
Road runs through the site, connecting the roundabout on the west to Station
Road to the east. North Hyde Road also bounds the site to the north.
2.6 The Hyde Park Hayes site is an edge-of-centre location with urban and suburban
characteristics, noting that Hayes Town Centre is designated circa 400m to the
north
-east of the application site. The si te also sits just outside the Hayes
Housing Zone.
2.7 According to the Council's GIS, the site is subject to potentially contaminated
land. The site also forms part of the Council's declared Hillingdon Air Quality
Management Area and Hayes Air Quality Focus Area, where air quality
conditions exceed the EU annual mean li mit value for nitrogen dioxide (NO2),
have high human exposure and current planned measures are insufficient to
resolve the poor air quality issues.
The site has a good Public Transport
Accessibility Level (PTAL) rating of 4, abutting land to the east which has a PTAL
rating of 5, benefitting from the improved transport connections at Hayes &
Harlington Crossrail station.
2.8 A Strategic Industrial Location is located circa 200m to the north of the site,
alongside the designated Botwell: Thorn EMI Conservation Area, Old Vinyl
Factory, Grade II Listed Enterprise House, Locally Listed 'His Master's Voice'
building and Locally Listed Thorn/EMI Building.
Hillingdon Planning Committee – 11th March 2026
PART 1 – Members, Public & Press
3 Proposal
Figure 3. Illustrative Masterplan CGI (sourced from D&A (Dated July 2025))
3.1 The application seeks Outline Planning Permission (with all matters reserved
excluding access) for demolition of existing buildings (above basement level)
and phased delivery of residential development (Class C3), flexible commercial
/ community
floorspace, new public realm, landscaping, play space, car parking,
cycle parking and associated works. The illustrative scheme proposes the
construction of 8 blocks and 2 rows of townhouses up to 11 storeys to provide
650 units, with circa 368m2 of flexible commercial / community floorspace
(including E(a) retail, E(b) food and drink, E(e) medical or health services, E(f)
nursery, E(g)(i) offices, F.2(a) shop with essential goods, F.2(b) hall or meeting
place for local community).
Whilst the illustrative scheme proposes 650 units, as
all matters are reserved, the Outline Pl anning application technically proposes
up to 673 units. Please see Figure 3 fo r the CGI of the illustrative masterplan
and see Table 1 for a breakdown of the 650 unit scenario.
Table 1. Illustrative Scheme Unit Mix
Unit Type Total Units % of Total Units
Studio 4 44.0%
1 Bed 2 Person 282
2 Bed 3 Person 62 40.6%
2 Bed 4 Person 202
3 Bed 5 Person 100 15.4%
Total Units 650 100%
3.2 The illustrative scheme development comprises five main residential blocks
(including more sub-blocks), including Blocks A1 and A2 within the northern
Hillingdon Planning Committee – 11th March 2026
PART 1 – Members, Public & Press
section of the site abutting North Hyde Road, Block B within the centre of Hyde
Park Hayes, Block C to the south -western corner of the site and Block D to the
south-eastern corner of the site. The rang e in block heights is summarised in
Table 2 below.
Table 2. Illustrative Scheme Proposed blocks by Use and Height
Block Max Heigh
(Storeys)
Use and Quantity
A1 11 88 units and 368m2 of flexible commercial /
community floorspace
A2 8 66
B1 8 82
B2 11 58
B3 6 37
C 10 120
D1 8 72
D2 10 121
Townhouses 3 6
3.3 Three communal public spaces are proposed, named the Gateway, Social Heart
and the Nurture Garden. The Gateway space would provide access through the
northern part of the site from North Hyde Road, a space which is envisaged to
be activated by the flexible
commercial / community units proposed at the ground
level of Blocks A1 and A2. The Social Heart connects to this space, sitting
between Block A, Block B and HPH1. This space would provide amenity space
with a more residential focus, being set further within the site and away from the
active Gateway space. The Nurture Gard en is set even further within the site,
between Block B, Block C, Block D and HPH1. Again, the function of this space
is envisaged to be more residential in nature. All spaces would be publicly
accessible but would invariably provide benefit to future residents in the form of
amenity provision. Please see Figure 4 for the proposed illustrative site plan.
Hillingdon Planning Committee – 11th March 2026
PART 1 – Members, Public & Press
Figure 4. Illustrative Masterplan Level 00 (sourced from drawing ref.
A12440-TPB-ZZ-L00-DR-A-041001-S2-P08)
3.4 Parameter Plans and a Design Code support the Outline Planning application
submission, establishing parameters an d design rules that future Reserved
Matters must follow. Accordingly, t he Illustrative Masterplan has been
synthesized down into a set of Parame ter Plans and a Design Code. The
Parameter Plans cover a number of material considerations and are listed below:
x Parameter Plan 1 - Building Zones
x Parameter Plan 2 - Access and Movement
x Parameter Plan 3 - Hard and Soft Landscape
x Parameter Plan 4 - Building Heights
x Parameter Plan 5 - Land Use
x Parameter Plan 6 - Trees
x Parameter Plan 7 - 3D Max Building Heights
x Parameter Plan 8 - Basement Zones Plan
Hillingdon Planning Committee – 11th March 2026
PART 1 – Members, Public & Press
3.5 During the application process, amended Parameter Plans, Design Code and
illustrative scheme plans were submitted in response to feedback from the
Council. The updated Parameter Plans refined the scheme, including minor
shifts to the building zones to improve layout and movement, enhancements to
pedestrian priority and traffic calming through revised access arrangements,
increased landscape and open
Ǧspace provision (particularly around Block B) and
a reduction in massing to the northern end of Block B1. Additional Class E
floorspace is now focused at the gateway to strengthen activation, while tree
retention has improved through repositioning of Blocks A2 and D. Corresponding
updates to the Illustrative Masterpla n reflect these changes, including an
adjusted residential mix, enhanced ground Ǧfloor uses, and reconfigured cycle
storage.
3.6 Please note that larger versions of the plans can be found in the Committee Plan
Pack.
4 Relevant Planning History
4.1 A list of the relevant planning histo ry related to the property can be found in
Appendix 2. As the site compromises a significant part of the Hyde Park Hayes
site, relevant planning history for the si te is also summarised below, including
history relating to HPH2 and HPH5 which form part of the application site, and
HPH1 and HPH4 which directly adjoin the site.
Application Site History
4.2 HPH2 (formerly Safeway House, 6 Millington Road) was granted consent under
planning permission ref. 40652/87/1562, dated 16-12-1987, for:
Redevelopment of site involving the erection of a three storey building for use an
office with part industrial and stora ge use (Use Class B8) together with
associated car parking facilities, landscaped areas and a new electricity
substation at Unit 2 and 4 Westlands Industrial Estate, Millington Road, Hayes.
4.3 HPH5 was granted consent under planning permission ref.
45753/APP/2012/2029, dated 05-07-2013, for:
Erection of five storey building to pr ovide 13,880sq.m of Class B1(a) Office
floorspace, provision of car parking spaces at surface and basement level,
associated landscaping and ancillary works.
Adjoining Hyde Park Hayes Site History
4.4 HPH1 has been granted Prior Approval to change of use of the offices to
residential under permission ref. 67351/APP/2024/2746, dated 11 -04-2025,
described as follows:
Hillingdon Planning Committee – 11th March 2026
PART 1 – Members, Public & Press
Change of use from offices (Use Class E) to residential (Use Class C3) to create
75no. self-contained flats under Schedule 2, Part 3, Class MA of the Town and
Country Planning (General Permitted Development) (England) Order 2015 (as
amended).
4.5 HPH4 has been the subject of permissi on references 76655/APP/2021/3039
dated 07 -04-2022, 76655/APP/2023/779 dated 26-06- 2023, and
76655/APP/2024/1152 dated 04 -10-2024, which permitted the re- development
of the site to provide a residential development comprising 131 units. These
permissions have now lapsed.
5 Planning Policy
5.1 A list of planning policies relevant to the consideration of the application can be
found in Appendix 3.
6 Consultations and Representations
6.1 A total of 697 no. letters were sent to neighbouring properties, a site notice was
displayed to the front of the site and an advert was posted in the local paper. The
neighbour consultation process expired on 24
th September 2025 and a total of
six comments were received. One comment in support and three comments in
objection to the application were received from members of the public. Two
additional comments were also received and were considered to fall under the
‘neutral’ category as neither in support nor in objection to the application.
6.2 Representations received in response to public consultation are summarised in
Table 3 (below). Consultee responses received are summarised in Table 4
(below). Full copies of the responses have also separately been made available
to Members.
Table 3. Summary of Representations Received
Representations Summary of Issues
Raised
Planning Officer
Response
A total of three
comments in
objection to the
development
were received
from neighbouring
residents.
1. The development will
cause congestion and
highways safety issues.
All comments in objection
are noted and taken into
consideration as part of the
planning assessment.
Please refer to the
Transport
section starting
paragraph 7.134 of this
report.
Hillingdon Planning Committee – 11th March 2026
PART 1 – Members, Public & Press
2. The development will
overshadow neighbouring
residents and impact on
quality of life.
Please refer to the
sections of this report
starting at paragraphs 7.34
(Tall Building
), 7.41
(Impact on the Character
and Appearance of the
Area
), 7.53 (Residential
Quality) and 7.59
(Residential Amenity).
3. The development will
cause air pollution.
Please refer to the Air
Quality section starting
paragraph 7.108 of this
report.
4. The development will
increase pressure on
infrastructure.
Whilst the development
would increase pressure
on infrastructure, any
permission granted would
ensure that acceptable
details are secured by
condition to avoid
significant harm. The
proposal is also liable to
the Community
Infrastructure Levy and
Section 106 obligations
which contribute to the
maintenance and
improvement of
infrastructure.
One comment in
support of the
development was
received from a
resident.
1. The development could
improve the local area and
create useful public space.
All comments in support
are noted and taken into
consideration as part of the
planning assessment.
Hillingdon Planning Committee – 11th March 2026
PART 1 – Members, Public & Press
Two neutral
comments were
received from
residents.
1. The development should
incorporate and celebrate
the site’s rich aviation
heritage.
All neutral comments are
noted and taken into
consideration as part of the
planning assessment.
Design Code rule DC 1.18
states that a visual marker
must be provided at the
centre or entrance of the
gateway such as a piece of
public artwork or sculpture.
This should reference the
Fairey Aviation Company.
The theme should be
carried through to the
Social Heart and Nurture
Garden.
2. The proposed
commercial unit should be
occupied by a local
hospitality business which
should be supported to
ensure that the space does
not remain empty.
The commercial space is
proposed to be flexible to
increase the likelihood of
occupation. Uses include
E(a) retail, E(b) food and
drink, E(e) medical or
health services, E(f)
nursery, E(g)(i) offices,
F.2(a) shop with essential
goods, F.2(b) hall or
meetin
g place for local
community.
Table 4. Summary of Consultee Responses
Consultee and Summary of Comments
Planning Officer
Response
External Consultation
Affinity Water:
No objection, provided the developer:
x Implements robust pollution prevention
during construction
x Incorporates strong water Ǧefficiency
measures
x Coordinates early on required water
infrastructure connections or diversions
The Affinity Water
comments are noted and
taken into consideration as
part of the planning
assessment.
Hillingdon Planning Committee – 11th March 2026
PART 1 – Members, Public & Press
Cadent Gas Ltd:
No objection.
The Cadent Gas Ltd
comments are noted and
taken into consideration as
part of the planning
assessment.
Greater London Archaeological Advisory
Service (GLAAS):
The desk-based assessment should be
enhanced with a specialist assessment of
Palaeolithic potential and consideration of the
consequent impact of the proposed
development in order to determine if mitigation
measures would be justified, and what form
they m
ight take.
The RPS Response (para 13) suggests that
‘appropriate planning conditions’ to control
foundation design could avoid or minimise
potential impacts. Since such condition would
have to be pre
-commencement it would have
to be agreed by the applicant and to be
acceptable would have to allow for a range of
potential mitigation scenarios.
No objection subject to a condition.
The GLAAS comments are
noted and taken into
consideration as part of the
planning assessment.
Condition 30 is proposed to
be secured.
Hayes Town Partnership:
1) Principle
The proposal to demolish the underused office
buildings at Hyde Park Hayes and replace
them with housing is supported in principle,
provided the applicant demonstrates (1)
genuine efforts to market the offices for
continued employment use, and (2) a clear
comparison of the carbon impact of
refurbishment versus redevelopment.
The development must address Hayes’
pressing local needs, particularly around
housing, social infrastructure, and heritage.
2) Housing
The most urgent needs locally are for:
x Genuinely affordable homes
The Hayes Town
Partnership comments are
noted and taken into
consideration as part of the
planning assessment.
1) Please see paragraphs
starting at 7.1 for
consideration of the
Principle of Development.
2) Please see paragraphs
starting at 7.2
0 and 7.26 for
consideration of the Unit Mix
and Affordable Housing.
3) The potential provision of
on
site GP practice is not
something that can
definitively be secured at
this stage of the planning
Hillingdon Planning Committee – 11th March 2026
PART 1 – Members, Public & Press
x Larger family-sized homes
The applicant must ensure these priorities
shape the scheme from the outset, especially
given the absence of a confirmed
development partner.
3) Social Infrastructure
Rapid growth driven by the Elizabeth Line has
not been matched by expanded community
services
—especially GP provision, worsened
by the recent cancellation of the Old Vinyl
Factory surgery.
The site offers a key
opportunity to include a purposeǦbuilt GP
practice, potentially funded through the
Community Infrastructure Levy. This would
help integrate the development with the wider
community rather than creating another
isolated enclave.
4) Heritage
The site’s history as the home of Fairey
Aviation, one of Britain’s major aircraft
innovators, is a significant cultural asset that is
not adequately reflected in the current
proposals. Opportunities exist to celebrate this
legacy through:
- Public art and sculptures
- Historic naming of streets and buildings
- Interpretation boards and walking routes
- Heritage displays during construction
Recognising this history would strengthen
community identity and support local
educational initiatives.
5) Environment, Public Realm, and
Landscaping
Retention of existing mature trees, especially
around site boundaries and North Hyde Road,
is essential to maintaining visual quality and
providing natural screening. Proposed
communal spaces provide opportunities to
embed heritage interpretation.
6) Play Space and Open Space
process with no guarantee
over take-up from a
healthcare provider (which
in the case of Hillingdon has
been secured previously
without any agreement to
enter into a lease and
occupy). Flexible
commercial
/ community
space has been secured on
site and can be used for
healthcare purposes should
proposals develop towards
such provision at the
R
eserved Matters stage of
the application process.
Please do note that a
significant sum is proposed
to be secured via S106 HoT
ii and would be for the
purposes of primary care
provision in and around
Hayes.
4) This is addressed by the
Design Code. Rule DC 1.18
states that a visual marker
must be provided at the
centre or entrance of the
gateway such as a piece of
public artwork or sculpture.
This should reference the
Fairey Aviation Company.
The theme should
be
carried through to the Social
Heart and Nurture Garden.
5) Amended Parameter
Plans have been secured
through the application
process in order to secure
the retention of more of the
existing mature tree
planting. The quality of
public realm and
landscaping is secured
through the Design Code
and Parameter Plans which
are discussed in more detail
Hillingdon Planning Committee – 11th March 2026
PART 1 – Members, Public & Press
Good-quality, sunlit play spaces are
supported. Safe routes for walking and cycling
to Pinkwell Park and Lake Farm Country Park
are needed due to their distance.
7) Transport
A pedestrian crossing near Keith Road is
welcomed, and improvements to a nearby
piece of open land are possible. Strict control
of resident parking in surrounding streets is
essential.
8) Cycling
The travel plan overestimates the practicality
of cycling locally: the network is fragmented
and Bournes Bridge remains dangerous.
Developer funding should prioritise
infrastructure improvements rather than large
volumes of unused cycle parking.
9) Retail
On-site retail should be limited to avoid
undermining Hayes Town Centre and to
ensure the development supports existing
local businesses.
in paragraphs starting at
7.30.
6) A financial contribution
towards Active Travel Zone
and Healthy Streets
improvements is proposed
to be secured under S106
HoT vii.
7) A parking permit
restriction
for residents and
visitors is proposed under
S106 HoT ix.
8) An acceptable final and
detailed Travel Plan is
proposed to be secured
under Condition 49. A
financial contribution
towards active travel,
healthy streets and bus
service improvements is
also proposed to be secured
under S106 HoT viii.
9) The small scale flexible
commercial / community
space is proposed to
activate North Hyde Road
and the proposed Gateway
space. Given that the site is
already a town centre use in
a non
-town centre location,
the proposal is considered
to reduce the vitality and
viability impact of the site on
Hayes Town
Centre.
Health and Safety Executive (Planning
Gateway One):
No objection subject to a condition for a
satisfactory fire statement.
The Health and Safety
Executive comments are
noted and taken into
consideration as part of the
planning assessment.
A final comprehensive Fire
Statement is proposed to be
secured
by Condition 51.
Hillingdon Planning Committee – 11th March 2026
PART 1 – Members, Public & Press
Heathrow Airport Safeguarding:
No objection subject to conditions to control:
1. Height Restriction
2. Radar Mitigation
3. Bird Hazard Management
4. Glint and Glare Review
5. Landscaping Controls
The Heathrow Airport
Safeguarding comments are
noted and taken into
consideration as part of the
planning assessment.
The following Conditions are
proposed to be secured:
Condition 10
- Height
Limitation on Buildings and
Structures
Condition 33 - Radar
Mitigation Scheme
Condition 36 - Landscape
Scheme
Condition 40 - Bird Hazard
Management Plan
Condition 45 - Glint & Glare
Assessment
London Fire Brigade:
No response received.
n/a
Metropolitan Police (Secured by Design):
No response received.
Whilst Officers have not
received detailed comments
from Secured by Design
Officers, C
ondition 52 is
proposed to secure
appropriate accreditation.
Officers are also satisfied
that the
Reserved Matters
application would ensure the
scheme would be
acceptable from Secure by
Design perspective given
the
design rules secured as
part of the Design Code.
Metropolitan Police (Estate Strategy &
Engagement):
The Metropolitan Police
(Estate Strategy &
Engagement) comments are
noted and taken into
Hillingdon Planning Committee – 11th March 2026
PART 1 – Members, Public & Press
The Metropolitan Police Service (MPS)
requested Section 106 contributions to
mitigate the policing impacts of new
residential development. While Secured by
Design measures are encouraged, they
cannot lawfully reduce policing deployment,
nor do they remove the need for additional
police infrastructure required as a direct result
of population growth (e.g., officer equipment,
vehicles, premises).
The proposed development will generate
measurable increases in crime, callǦhandling,
patrol demand and use of police systems,
which cannot be absorbed within existing
overstretched resources, particularly given the
MPS’s current capital funding constraints and
budget shortfalls from 2023/24 onwards.
National policy, including NPPF paragraphs
92, 97 and 130, alongside London Plan Policy
S1, provides explicit support for ensuring safe,
resilient, well
Ǧpoliced communities.
The MPS concludes that without a police
contribution the development would place
unacceptable pressure on loc
al policing
capacity, undermining community safety, and
therefore the requested S106 funding is
necessary, lawful, and essential to make the
development acceptable in planning terms.
consideration as part of the
planning assessment. The
request in this specific
instance is not proposed to
be secured for the following
reasons:
1) Funding responsibility:
The provision of police
infrastructure is not the
responsibility of individual
developers. The demand for
policing and associated
equipment arises from the
wider population of Hayes
and existing communities,
including future residents,
who contribute to policing
services through general
taxation, rather than
development specific
channels.
2) Existing strategic
context:
There is currently
no adopted MPS estates
strategy that the Council can
rely upon to evidence a
defined policing
infrastructure requirement
specific to this location or
this development.
3) Policy prioritisation:
Local Plan Policy DF1
requires that contributions
be prioritised towards critical
infrastructure such as
transport and health. Given
the financial viability
constraints affecting the
scheme, only infrastructure
that is essential, evidenced,
and compliant with statutory
tests can be sought.
4) Regulation 122 tests:
The requests fail to meet the
three legal tests set out in
Hillingdon Planning Committee – 11th March 2026
PART 1 – Members, Public & Press
Regulation 122 of the
Community Infrastructure
Levy Regulations 2010. At
the time of the assessment,
within the current Planning
Policy Framework, the MPS
contribution is not
considered to meet the CIL
tests. This does not mean it
will not under future
Dev
elopment Plan
Frameworks.
Ministry of Defence (MOD):
No objection.
The MOD comments are
noted and taken into
consideration as part of the
planning assessment.
National Air Traffic Services (NATS):
NATS has reviewed the proposed
development and anticipates that it will
interfere with the H10 radar at Heathrow
Airport due to the buildings’ height, scale, and
direct line of sight to the radar. This would
cause radar reflections, generating false
aircra
ft targets that increase air traffic
controller workload and compromise aviation
safety. As a result, NATS requires strict
safeguarding conditions to be attached to any
planning permission.
No objection subject to conditions for the
following:
1. Radar Mitigation Scheme (RMS)
2. Construction Height Control
The NATS comments are
noted and taken into
consideration as part of the
planning assessment.
Conditions 10 and 33 are
proposed to be secured.
Network Rail:
No objection in principle but notes the
following:
Ground Levels: Developers must consult
Network Rail before altering ground levels,
and no excavations should occur close to
railway embankments, bridges, or retaining
structures to avoid compromising rail
infrastructure stability.
The Network Rail comments
are noted and taken into
consideration as part of the
planning assessment.
Hillingdon Planning Committee – 11th March 2026
PART 1 – Members, Public & Press
Noise and Vibration: Given the site's proximity
to the railway, the applicant must assess
noise and vibration impacts in accordance
with the NPPF. Railway operations may
change without notic
e—including increased
train frequency, nightǦtime running, freight
movements, and overnight maintenance with
idling engines. Future residents should
therefore be fully informed of both existing and
potential future railway noise and vibration.
Lighting: Any lighting from the development
must be designed so it does not interfere with
railway signalling or train drivers’ visibility.
Lighting colour, intensity, and placement must
avoid creating confusion with signal aspects.
National Health Service (NHS) Property
Services:
No objection subject to a financial contribution
being secured
towards additional primary care
infrastructure to support the new population
associated with this development.
The NHS comments are
noted and taken into
consideration as part of the
planning assessment.
Following discussion with
both the NHS and Applicant
Team, a financial
contribution has been
agreed and is secured
under S106 HoT ii.
Thames Water:
Thames Water raises several essential
requirements that must be resolved before the
development can be occupied or construction
involving piling can begin.
No objection subject to conditions relating to
the following:
x Foul Water Capacity
x Piling Method Statement
The Thames Water
comments are noted and
taken into consideration as
part of the planning
assessment.
Conditions 31 (Piling
Method Statement) and 47
(Thames Water Condition)
are proposed to be secured.
Transport for London (TfL) (Dated October
2025):
While supportive of the site’s potential and its
good public transport accessibility (PTAL 4),
The TfL comments are
noted and taken into
consideration as part of the
planning assessment.
Hillingdon Planning Committee – 11th March 2026
PART 1 – Members, Public & Press
TfL identifies several areas requiring further
assessment, mitigation, or contribution.
TfL requests the following to be secured
through conditions or S106 obligations:
1. Updated ATZ assessment
2. Revisions to the pedestrian, cycling
and public realm strategy
3. Revised trip generation analysis
4.
Financial contributions for buses and
Healthy Streets
5. Delivery & Servicing Plan, Parking
Design & Management Plan, CLP, and
Travel Plan
Transport for London (TfL) (Dated
December 2025):
Further information was submitted in response
to TfL. The TfL response is summarised
below.
1) Active Travel & Healthy Streets: The
updated ATZ assessment is noted but could
better assess wayfinding and nightǦtime
safety. TfL supports securing contributions to
improve walking and cycling routes and
stresses that the proposed pedestrian
crossing must not affect bus operations and
must also serve cyclists.
2) Public Realm & Connectivity: TfL supports
improvements along Millington Road (South)
and expects these to be secured through
S106. A cycle network plan should be
included at outline stage to secure clear
principles for site
Ǧwide cycle connectivity.
3) Parking: Given strong public transport
accessibility, TfL maintains the site should be
carǦfree. A Parking Management Plan must
confirm removal of the 112 existing
commercial spaces once leases expire.
Each point is addressed in
turn:
1) The updated ATZ is
accepted on the basis that
the application is for Outline
Planning
Permission only,
with Reserved Matters to
follow once the final detailed
scheme is confirmed.
Financial contributions
towards active travel,
healthy streets, bus stop
enhancements and A312
enhancements have been
agreed and secured under
S106 HoTs viii
.
2) As Millington Road is a
private road within the red
line boundary of the
application site within the
Applicant’s ownership, the
Millington Road
improvements are to be
secured as a
Reserved
Matter supported by
approval of details reserved
by Condition 36 (Landscape
Scheme). A S106 legal
obligation is not required
where a condition is
possible.
3. The requested Parking
Design and Management
Plan is proposed to be
secured by Condition 50.
4. Contributions towards bus
service enhancements and
the A312 Healthy Streets
scheme are proposed to be
secured under S106 HoT
viii.
5. The following Conditions
are proposed to be secured:
Hillingdon Planning Committee – 11th March 2026
PART 1 – Members, Public & Press
4) Trip Generation & Mitigation: Despite
further TRICS data, TfL still requires mitigation
under London Plan Policy T4. Contributions
requested are
for bus service enhancements
and the A312 Healthy Streets scheme.
5) Servicing, Logistics & Travel Planning: TfL
supports conditions securing a Construction
Logistics Plan, Delivery & Servicing Plan, and
a Travel Plan, with postǦoccupation review
recommended.
Condition 28 - Demolition
Management, Logistics Plan
and Environmental
Management Plan
Condition 48 - Delivery,
Servicing and Waste
Management Plan
Condition 49 - Travel Plans
Transport for London Infrastructure
Protection (Safeguarding):
No comment confirmed.
The Transport for London
Infrastructure Protection
(Safeguarding) comments
are noted and taken into
consideration as part of the
planning assessment.
Internal Consultation
Planning Policy Officer:
Principle: The proposed development includes
the loss of approximately 22,745sqm of office
floorspace. The site is not located within a
designated town centre or any other protected
area for office uses as defined in the Local
Plan. The applicant has provi
ded a
justification for the loss of office space, citing
limited demand for office use in this location,
as well as a lack of identified need for large-
format office floorplans. Given the site's
location and the evidence submitted, there is
no in principle
policy objection to the proposed
loss of office floorspace in this location.
Housing Size Mix: The proposed residential
element includes 16% family
sized homes (3+
bedrooms). This is broadly consistent with
previously approved schemes, which also
delivered 16.4% and above. Previous
proposals with less than 10% were not
supported, highlighting the importance of
maintaining a suitable housing mix.
The Planning Policy Officer
comments are noted and
taken into consideration as
part of the planning
assessment.
Following amendments to
the Outline Planning
application, it should be
noted that the minimum
level of family
-sized homes
is in fact 15%. This level of
provision is still considered
positively within the planning
balance.
Access Officer:
Any subsequent
Reserved Matters application
is required to provide 10% of dwellings to
The Access Officer
comments are noted and
taken into consideration as
Hillingdon Planning Committee – 11th March 2026
PART 1 – Members, Public & Press
have been designed to meet the standards for
Category 3 M4(3) Wheelchair Accessible or
Wheelchair Adaptable dwellings and all
remaining units would need to be designed to
the standards for Category 2 M4(2) dwellings,
as set out in Approved Document M to the
Building Regulations (2010) 2015.
All such provisions should include the highest
standard of inclusive design, ensuring
accessibility for older and disabled people, to
the public realm, car parking, and within the
bounds of recreational and amenity spaces
part of the planning
assessment.
Condition 13 is a proposed
to ensure that 10% of the
residential units would be
designed to the standards
for Category
3 M4(3)
dwellings, as set out in
Approved Document M to
the Building Regulations
(2010) 2015 (
or as
amended).
Urban Design Officer:
While most of the proposed changes are
welcomed and supported in principle, the
concerns raised by officers and the Design
Review Panel regarding the size, quality and
functionality of the proposed open space
remain unresolved. The revisions do not fully
address these issues, and the quality and
usability of the public realm continue to be a
concern. Several elements of the updated
proposals appear aspirational, raising doubts
about their feasibility. The amenity provision
would remain fragmented rather than a larger
open space which is more likely to be
successful. While the design evolution is
noted and partially supported, the proposal
falls short in resolving the urban design
concerns identified.
Limited changes have been made to the
Design Code, and significant concerns
remain. The parameter plans fix building
footprints and heights to deliver a
high density
scheme, without sufficient evidence that the
spaces between buildings can deliver a high
quality public realm. The public realm is
expected to accommodate multiple functions,
open space, play, SuDS, servicing, BNG and
UGF
, without tested layouts demonstrating
that these elements can successfully coexist.
Inconsistencies in the tree information further
undermine confidence that the streets will
meet required public realm standards. In
addition, some Design Code clauses duplicate
The Urban Design Officer
comments are noted and
taken into consideration as
part of the planning
assessment.
Please refer to paragraphs
starting at 7.30 to 7.90 of
the report for consideration
of the design and amenity
provisions.
Hillingdon Planning Committee – 11th March 2026
PART 1 – Members, Public & Press
the parameter plans. Overall, the Design
Code lacks the certainty needed to secure
quality outcomes and defers critical design
decisions, resulting in an approach that
appears aspirational rather than demonstrably
deliverable.
Daylight and Sunlight Consultant (Third
Party):
The submitted DSO assessment is well
structured, follows BRE guidance, and its
overall conclusions are broadly reasonable.
There is no fundamental objection to the
scheme on daylight and sunlight grounds at
this stage. The Council’s consultant identified
some points of clarification which were
resolved in part. The remaining matters were
agreed to be resolved at the
Reserved
Matters stage of the planning application
process in the event of an approval.
The Daylight and Sunlight
Consultant comments are
noted and taken into
consideration as part of the
planning assessment.
It is noted that paragraph
130, part c) of the NPPF
(2024) is also emphasised
and states that when
considering applications for
housing, authorities should
take a flexible approach in
applying policies or
guidance relating to daylight
and sunlight, where they
would otherwise inhibit
making efficient use of a site
(as long as the resulting
scheme would provide
acceptable living standards).
It is also noted that the
scheme is in Outline and as
such, any application for
Reserved Matters will need
to be supported by a
detailed final Daylight and
Sunlight Assessment
(please refer to Condition
23). The detail submitted for
the Outline stage of the
application process is
considered to be sufficient
and acceptable.
Wind and Microclimate Consultant (Third
Party):
The wind study is generally well structured
and follows recognised methodology and
bestǦpractice guidance. Its overall conclusions
The Wind and Microclimate
Consultant comments are
noted and taken into
consideration as part of the
planning assessment.
Hillingdon Planning Committee – 11th March 2026
PART 1 – Members, Public & Press
are considered reasonable, and there is no
fundamental objection in principle. The
Council’s consultant identified some points of
clarification which were resolved in part. The
remaining matters were agreed to be resolved
at the
Reserved Matters stage of the planning
application process in the event of an
approval.
Chapter 12 of the NPPF
(Achieving well-designed
places) requires
developments to provide
safe, inclusive and attractive
environments, but it also
directs decision
Ǧmakers to
take a balanced view of
design quality in context.
Wind impacts should be
weighed against the totality
of benefits
, minor or
localised exceedances can
be acceptable where the
scheme achieves wider
policy aims. This aligns with
the BRE’s approach to
daylight/sunlight
—i.e.,
guidance is intended to
inform, not control, design
outcomes.
It is also noted that the
scheme is in Outline and as
such, any application for
Reserved Matters will need
to be supported by a
detailed final Wind and
Microclimate Assessment
(please refer to Condition
24). The detail submitted for
the Outline stage of the
application process is
considered to be sufficient
and acceptable.
Highways Authority:
Subject to planning conditions and S106
obligations, no highway objection is raised.
Conditions and S106 obligations requested
include:
x Delivery & Servicing Plan and
Construction Logistics Plan
(preǦcommencement)
x Parking Design & Management Plan
(preǦoccupation)
The Highways Authority
comments are noted and
taken into consideration as
part of the planning
assessment.
The following Conditions are
proposed to be secured:
Condition 20
- Parking
spaces leased and not sold
Hillingdon Planning Committee – 11th March 2026
PART 1 – Members, Public & Press
x Travel Plan (pre Ǧoccupation)
x S106 Healthy Streets contribution
(£140,360)
x Cycle parking details (pre Ǧoccupation)
x All car parking spaces to be leased, not
sold
x Permit Ǧfree obligation for future
residents
x Road Safety Audit for the proposed
pedestrian crossing
x Motorcycle parking at 5% of car parking
provision
Condition 28 - Demolition
Management, Logistics Plan
and Environmental
Management Plan
Condition 34 - North Hyde
Road Pedestrian Crossing
(Road Safety Audit)
Condition 36 - Landscape
Scheme (including parking
provisions)
Condition 48 - Delivery,
Servicing and Waste
Management Plan
Condition 49 - Travel Plans
Condition 50
- Parking
Design and Management
Plan
The following S106
obligations are also
proposed to be secured:
vi. Section 278 Highways
Agreement for North Hyde
Road crossing
vii. Hillingdon Council Active
Travel Zone / Healthy
Streets Contribution
viii. Transport for London
Contributions
ix. Residential Parking
Permit Restrictions
Air Quality Officer:
No objection is raised subject to:
x Securing the £174,299 S106 air quality
contribution.
The Air Quality Officer
comments are noted and
taken into consideration as
part of the planning
assessment.
The following Conditions are
proposed to be secured: