FINANCIAL UPDATE ON SECTION 106 AND 278 AGREEMENTS AT 31 MARCH 2010 APPENDIX 1
CASE REF. WARD SCHEME / PLANNING
REFERENCE
TOTAL INCOME TOTAL INCOME TOTAL
EXPENDITURE
TOTAL
EXPENDITURE
2009 / 2010
EXPENDITURE
BALANCE OF
FUNDS
BALANCE
SPENDABLE
NOT
ALLOCATED
COMMENTS
(as at mid May 2010)
AS AT 31/ 3/10 AS AT 31/12/09 AS AT 31/ 3/10 AS AT 31/12/10 To 31/ 3/10 AS AT 31/ 3/10 AS AT 31/ 3/10
SECTION 278
PORTFOLIO: PLANNING AND TRANSPORTATION
PT278/27/09
(Includes Former
PT/29)
*16
Botwell Stockley Park Phase 3 "Trident
Site" 37977/W/96/1447
604,300.70 591,203.22 14,500.00 14,500.00 0.00 589,800.70 0.00 Spend is engineering fees. Development not yet implemented and highways works
not started. Funds currently held are for security deposit and fully refundable subject
to the due and proper implementation of the Highway works. £2,500 engineering fees
transferred from PT278/27. A further £12,500 of Engineering fees needs to be
claimed from developer should works commence. Interest added . Increase in
income due to return of tax claimed in error.
PT278/30/115
*22
Heathrow
Villages
Terminal 5, Land at Longford
Roundabout, Heathrow s278 10
Jan 02 47853/93/246
10,500.00 10,500.00 0.00 0.00 0.00 10,500.00 0.00 Fees & security (£5,000) associated with Highway Works to be undertaken by
developer. Works consisted of temporary access works from Longford Roundabout
to Western Perimeter Road. Access installed & will be removed following completion
of Terminal 5. Security to be retained pending outcome of BAA proposals to make
this access two-way and permanent for buses and emergency services vehicles as
well as cyclists. Two way access implemented. Officers investigating whether all
required works have been completed. Works completed, security to be refunded after
maintenance period
PT278/34/86A
*18
Brunel Brunel site3 532/SPP/2001/1858 -
Highways Works at Junction
Hillingdon Hill / Kingston Lane &
Pelican Crossing on Kingston Lane
392,358.87 392,358.87 197,448.22 197,448.22 0.00 194,910.65 0.00 Highway Works - £150k refundable security, £124,637.12 received for highway works
at junction of Hillingdon Hill and Kingston Lane, £65,271.32 · received for Kingston
Lane Pedestrian Crossing, £20,500 supervision fees. If the supervision fee following
final completion exceeds 10% of the costs of the works plus statutory undertakers
costs and TTS payment then the excess is to be refunded. Works complete and
signals switched on. Officers continue to chase Brunel to perform remedial works to
grass verges and are investigating options for the use of some of the security for the
Council to perform the remedial works if necessary. Final certificate sent 30/4/09.
PT278/44/87A
*20
Brunel Brunel s278 16 April 04
532/SPP/2002/2237 - Traffic
Calming on Cleveland Road & New
Entrance on Kingston Lane
102,018.78 114,819.85 81,080.74 81,080.74 0.00 20,938.04 0.00 Traffic Calming on Cleveland Road & roundabout on Kingston Lane. £30,900 spent
on engineering fees. £150k Refundable security deposit. £3,200 for Traffic DC
project management costs. £58,962.38 TTS estimate for Pedestrian Crossing on
Cleveland Road. Further payments received following receipt of estimate of works to
cover security/costs. £10,000 received for improvements to a footpath on the site to
be retained a security for Brunel to implement the works and to be transferred to
PT84/87B-D. Traffic Calming on Cleveland Road (including new signalised crossing)
& roundabout on Kingston Lane at new entrance to Brunel University now complete.
TfL invoice paid. Residual on TfL payment due to VAT not claimed - funds to be held
on as contingency for extra TfL costs. Interest Accrued. Remedial work completed
and signed off in December 2007. £10,000 plus interest transferred to PT/84 for
footpath works.
PT278/46/135
*32
Northwood 10A Sandy Lodge Way Northwood
54671/APP/2002/54
7,458.07 7,458.07 2,458.00 2,458.00 0.00 5,000.07 0.00 Improvement of visibility for junction of Sandy Lodge Way & Woodridge Way. ECU
fees have been claimed and £5,000 security remains. Works substantially complete
12 month maintenance period, ended 16 September 2006. Final certificate has been
prepared. Security held to part offset outstanding education contribution which is
being sought via legal proceedings.
PT278/47 Various Refunds Various
37,804.67 37,804.67 15,938.10 15,938.10 0.00 21,866.57 0.00 Funds transferred to here as refunds related to the Heinz, Hayes Park and former BT
site, Glencoe Road, Yeading developments, not yet taken up by developer or
owners. Also £10.79 from Wimpey Site Beaconsfield Road and £232.58 from
Former Magnatex Site Bath Road which is residual interest omitted from refunds
related to those schemes. Officers looking into appropriate recipients for refunds.
FINANCIAL UPDATE ON SECTION 106 AND 278 AGREEMENTS AT 31 MARCH 2010 APPENDIX 1
CASE REF. WARD SCHEME / PLANNING
REFERENCE
TOTAL INCOME TOTAL INCOME TOTAL
EXPENDITURE
TOTAL
EXPENDITURE
2009 / 2010
EXPENDITURE
BALANCE OF
FUNDS
BALANCE
SPENDABLE
NOT
ALLOCATED
COMMENTS
(as at mid May 2010)
AS AT 31/ 3/10 AS AT 31/12/09 AS AT 31/ 3/10 AS AT 31/12/10 To 31/ 3/10 AS AT 31/ 3/10 AS AT 31/ 3/10
PT278/48 Various No Legal Agreement Various 83,520.60 83,520.60 43,981.60 43,981.60 26,404.60 39,539.00 0.00 No Legal Agreement - consultancy fees. £14,000 to be transferred to a
PPR/reference for 1st quarter 08/09 report as these funds are for construction
training secured from the s106 agreement for Budgens Site, South Ruislip.
Expenditure due to ECU fees claimed in relation to Bishop Ramsey school S278
works. £5,200 security deposit received for car park at Mount Vernon Hospital.
Spend towards engineering fees claimed.
PT278/49/117
*23
Yeading Grand Union Village Southall
327/APP/2000/2106
77,331.55 77,331.55 11,447.00 11,447.00 11,447.00 65,884.55 0.00 Security deposit (£5K + interest) for highways works involving traffic calming to the
junction with Glencoe Rd and a cycleway/footway on Broadmead Rd to Hayes
Bypass. £52,363.10 for TfL costs for Broadmead Road Toucan Crossing proposed
as part of works. Additional income is £1K of engineering fees. Detailed plans of
works and design agreed. Consultation undertaken during February 2007 for traffic
calming and toucan crossing. Officers chasing TfL for implementation. Following
consultation Cabinet Member agreed to works to be carried out. Works completed
Aug 09. Further £11,447 received for LBH fees.
PT278/55/10A
*14
(Formerly PT/31)
Uxbridge
North
Land at Sanderson Site and
Braybourn / 35347/APP/2000/1294
& 1296
166,491.05 166,491.05 463.10 463.10 0.00 166,027.95 0.00 Funds held (£140,070 plus interest) as a deposit sum - fully refundable subject to the
due and proper execution of the Highways Works by developer (road widening, the
provision of a mini-roundabout, two new bus stops, extension of a right hand turn
lane on Oxford Rd into Sanderson Road, and removal of existing parking bays).
Engineering fees were paid direct to HEC and did not pass through s106/278
accounts. Works complete. Some outstanding remedial items, which are subject of
on-going discussions with the developer. Funds to be returned following issue of final
certificate. £463.10 additional engineering fees received - claimed by HEC. Interest
accrued.
PT278/57/140 A Pinkwell MOD Records Office Stockley
Road Hayes 18399/APP/2004/2284
419,128.68 419,128.68 325,719.61 323,973.21 23,005.56 93,409.07 0.00 £188,737.70 (including £170,027.34 for Transport For London signals unit) for
installation of two sets of traffic signals, one at the entrance to the site the other at
Lavender Rise on Stockley Road and £190,686.91 received in respect of the
Council's costs for supervision of the works (to be carried out by the owner). Works
complete. Stage 3 road safety audit now agreed await completion of remedial works.
Remedial works completed. Additional item of works being sought by officers who are
chasing the developer for this. Council's costs of £205,686.71 claimed, TTS invoice
for signals at Lavender Rise paid. Funding for additional items of works (removal of
right turn lane) and BT cabling received. Design work and public consultation
completed.
Removal of right turn lane completed Sept 09. Scheme in maintenance
period awaiting financial completion.
PT278/60/147A
*42
West Drayon Former DERA site, Kingston Lane
West Drayton
45658/APP/2002/3012
1,568.98 1,568.98 0.00 0.00 0.00 1,568.98 0.00 £1,500 The Council's costs for the design, administration and supervision of the
works to the public highways surrounding the site to be performed by the developer.
£15,000 held as security for the due and proper execution of the works. Await
progress on site before commencement of these off-site highways works. Highway
works started on site and were due to be substantially complete in September 2007.
Maintenance period complete. Bond plus interest returned. Remaining balance LBH
fees due.
PT278/60/147B West Drayon DERA Site, Kingston Lane, West
Drayton - Highways
45658/APP/2002/3012
56,816.26 56,816.26 0.00 0.00 0.00 56,816.26 0.00 £55,000 was received towards the total cost of highway works for the purchase and
installation of traffic signals at Station Road/ Porters Way Junction and any such
other incidental work as identified by the Council to support the development. Funds
not spent by 19 February 2014 are to be refunded together with interest accrued.
£125.85 interest accrued. These works to be performed by developer of RAF Porters
Way (see PT278/62/148A). Funds to be retained as a contingency for these works.
PT278/62/149A
*51
Botwell Hayes Goods Yard
10057/APP/2004/2996&2999
7,000.00 7,000.00 0.00 0.00 0.00 7,000.00 0.00 The Council's costs due upon lodgement of documents by the developer for the
design, administration and supervision of the works to the public highways
surrounding the site to be performed by the developer. £5,000 received as a
security deposit for the due and proper execution of the highways works by the
developer.
FINANCIAL UPDATE ON SECTION 106 AND 278 AGREEMENTS AT 31 MARCH 2010 APPENDIX 1
CASE REF. WARD SCHEME / PLANNING
REFERENCE
TOTAL INCOME TOTAL INCOME TOTAL
EXPENDITURE
TOTAL
EXPENDITURE
2009 / 2010
EXPENDITURE
BALANCE OF
FUNDS
BALANCE
SPENDABLE
NOT
ALLOCATED
COMMENTS
(as at mid May 2010)
AS AT 31/ 3/10 AS AT 31/12/09 AS AT 31/ 3/10 AS AT 31/12/10 To 31/ 3/10 AS AT 31/ 3/10 AS AT 31/ 3/10
PT278/63/175A
*49
South Ruislip BFPO, R.A.F Northolt
189/APP/2006/2091
5,000.00 5,000.00 0.00 0.00 0.00 5,000.00 0.00 £5k received as the security deposit for the due and proper implementation of
junction works at the White House Gate entrance to the development. Signals
complete and in operation. Currently within 12 month maintenance period. Date of
final completion to be confirmed. Spend towards engineering fees transferred to
PT/278/48.
PT/278/64/173 Eastcote &
East Ruislip
R.A.F. Eastcote
10189/APP/2004/1781
14,200.00 14,200.00 12,201.13 12,201.13 12,201.13 1,998.87 0.00 Engineers fees paid prior to the execution of an agreement to secure access works
associated with this application. Waiting restriction in Lime Grove undertaken. Elm
Ave/Lime Grove junction improvement pending. Elm Ave Pedestrian crossing
technical approval pending.(£5,500) design fees received plus further £6,700 for
temporary footpath works carried out by LBH. £7,500 engineering fees claimed.
Funds spent towards temporary footpath works.
PT/278/65/182
*52
Heathrow
Villages
Longford Roundabout - Fifth Arm,
63369/APP/2007/2294
9,521.00 9,521.00 4,521.00 4,521.00 0.00 5,000.00 0.00 Remaining balance is a security deposit for developer implementation of bus only
access to Terminal 5 Heathrow. Spend on supervision costs.Works complete,
security to be refunded following maintenance period.
PT/278/66/183 Pinkwell Shepiston Lane - Petrol Station
Development
32,000.00 32,000.00 16,000.00 16,000.00 -16,000.00 16,000.00 0.00 Funds received as security for highways improvements being performed by the
developer in lieu of a banker's bond. Works completed and part of the monies has
been refunded. Remaining balance to be refunded following satisfactory completion
of the maintenance period. Further £16,000 security returned to developer.
Remaining balance to be returned following final completion of works.
PT/278/71 Uxbridge
North
Hillingdon House Farm Site E Eng.
Cons. Fees (North Way)
3,150.00 3,150.00 3,150.00 3,150.00 3,150.00 0.00 0.00 Fees received for design checks. Alteration to access road, traffic signals and
advanced warning signs. S278 agreement and technical approval pending. £3,150
engineering fees claimed.
PT/278/72
*66
West Ruislip R.A.F West Ruislip Design check
on S278 Designs
38402/APP/2007/1072
53,986.57 30,500.00 12,500.00 12,500.00 12,500.00 41,486.57 0.00 Fees received for design checks. Pelican crossing and signals on Long Lane. S278
agreement and technical approval pending. Further £18,000 returnable deposit
received to ensure reinstatement of temporary crossover on Alysham Drive. Further
fees received towards inspection fees and traffic orders.
PT/278/73 South Ruislip R.A.F Northolt., South RuislipMain
Gate 189/APP/2007/1321
2,000.00 2,000.00 0.00 0.00 0.00 2,000.00 0.00 Fees received for design checks. Junction improvements at West End Road/
Bridgewater Road. S278 agreement and technical approval pending.
PT/278/74/209 Yiewsley Proposed Tesco development,
Trout Road, Yiewsley
609/APP/2007/2744
3,000.00 3,000.00 0.00 0.00 0.00 3,000.00 0.00 Fees received for design checks for proposed junctionworks and carriageway
widening at Trout Road. S278 agreement and technical approval pending.
PT/278/75 Harefield The Harefield Academy, Harfield
1109/APP/2006/825
4,000.00 4,000.00 0.00 0.00 0.00 4,000.00 0.00 Fees received for design checks. Alteration to Academy entrance and proposed
zebra crossing.S278 agreement and technical approval pending . fees received for
design checks for pedestrian crossing .
PT/278/76/198A
*60
Uxbridge Former Gas Works site (Kier Park),
Cowley Mill Road, Uxbridge
3114/APP/2008/2497
5,000.00 5,000.00 0.00 0.00 0.00 5,000.00 0.00 Funds received as a security deposit for due and proper execution of highways
improvements.S278 agreement.
PT/278/77/197
*62
Ruislip Manor Windmill Hill Public House,
Pembroke Road, Ruislip
11924/APP/2632
24,000.00 24,000.00 1,000.00 1,000.00 1,000.00 23,000.00 0.00 Fees received for design checks (£1,000). £23,000 received as a security deposit to
ensure works are carried at to a satisfactory standard. £1,000 engineering fees
claimed.
SECTION 278 SUB - TOTAL 2,122,155.78 2,098,372.80 742,408.50 740,662.10 73,708.29 1,379,747.28 0.00
SECTION 106
PORTFOLIO: PLANNING AND TRANSPORTATION
FINANCIAL UPDATE ON SECTION 106 AND 278 AGREEMENTS AT 31 MARCH 2010 APPENDIX 1
CASE REF. WARD SCHEME / PLANNING
REFERENCE
TOTAL INCOME TOTAL INCOME TOTAL
EXPENDITURE
TOTAL
EXPENDITURE
2009 / 2010
EXPENDITURE
BALANCE OF
FUNDS
BALANCE
SPENDABLE
NOT
ALLOCATED
COMMENTS
(as at mid May 2010)
AS AT 31/ 3/10 AS AT 31/12/09 AS AT 31/ 3/10 AS AT 31/12/10 To 31/ 3/10 AS AT 31/ 3/10 AS AT 31/ 3/10
PT/05/04a *2 Heathrow
Villages
BA World Cargo / 50045A/95/1043 339,111.08 339,111.08 0.00 0.00 0.00 339,111.08 0.00 The balance is for improvements to public transport serving the south side of London
Heathrow. Any scheme supported by these funds should provide a significant
benefit to BA employees in the vicinity of Heathrow and the views of the Heathrow
Transport Forum sought in determining any scheme. No time limits. BAA led
proposal for upgrade of bus services serving the south side of Heathrow being
discussed. S106 funding (from this case and PT/05/4b) would be used to 'pump
prime' these services with TfL taking on the costs once the available funding has
been used. £210,000 allocated to enhancements to 350 and 423 bus services (
Cabinet Member decision 21/10/09). Enhanced services commenced December 09.
PT/05/04b
*2
Heathrow
Villages
BA World Cargo / 50045A/95/1043
406,331.57 406,331.57 173,645.35 173,645.35 0.00 232,686.22 0.00 The balance is for improvements to public transport serving London Heathrow. Any
scheme supported by these funds should provide a significant benefit to BA
employees in the vicinity of Heathrow and the views of the Heathrow Transport
Forum are to be sought in determining any scheme to be funded. See update to
PT/05/04a above regarding the remainder of the balance. No time limits.
PT/11/45 Harefield Springwell Lane - Cycle Way /
6679/AZ/98/0897
3,283.20 3,283.20 2,121.57 2,121.57 0.00 1,161.63 0.00 Towards traffic calming in Springwell Lane. Funds earmarked/ committed towards
traffic calming to benefit a cycle way. Delegated authority granted to advertise for
20m/hr speed zone. Works complete. Officers chasing confirmation of final s106
expenditure amount. Interest accrued. Unexpended funds at January 2011 to be
returned to the owner.
PT/18/38B
(See also E/25/38A)
*33
Heathrow
Villages
Former Airspeed House, Stanwell
Road, Heathrow / 50395/A97/1297
138,068.30 138,068.30 62,912.71 62,912.71 0.00 75,155.59 0.00 For Public Transport Improvements (2 bus shelters & pedestrian crossing) Bus
shelters and pedestrian crossing installed & funded by another authority/agency.
Two alternative bus shelters provided by London Buses and LB Hounslow. S106
funds are not required. No other schemes required in accordance with terms for
spend. Officers investigating options to pusue alternative scheme. Decision being
sought as to way forward. Interest accrued. There are no time constraints upon the
expenditure of the funds. Original scheme implemented & paid for from other funds.
Balance allocated to another highway scheme.
PT/21/39A Uxbridge
North
The Chimes - Supervision & TTS /
42966/AH/961862
112,591.63 112,591.63 110,426.22 110,426.22 0.00 2,165.41 0.00 £63,484.80 received for traffic signals - £62,591.63 has been paid, leaving £893.17
unspent for this purpose. £2,165.41 for engineering fees. Trees planted in the High
Street near the Sony Shop but wrong species planted by developer's contractor. This
issue prevented the Final Certificate being issued. The remaining supervision funds
(£2,165.41) are earmarked for final inspection/ supervision. Trees planted and
establishment period expired Spring 2008. £893.17 has been refunded and any
remaining supervision and administration fee to be transferred to PT/44/03.
PT/24/55
(see E/08)
*28
Pinkwell Former Arlington Hotel, Shepiston
Lane, Harlington - Highway Works
382/BH/97/0714
23,639.34 23,639.34 0.00 0.00 0.00 23,639.34 0.00 Highway Improvement Works according to the 3rd Schedule of the agreement
(13.141K). Excess funds are to be refunded to the developer following the date of the
Final Account. Conflict between works specified in agreement and works required in
association with application for Harlington Community School Sports Centre (see
PT278/51). Works (to right hand turn lane) have been carried out as part of the
Harlington Community School development. Reasonable time for spend has elapsed.
Officers investigating options to pursue possible deed of gift for alternative scheme.
PT/25/56
*24
South Ruislip J Sainsbury, 11 Long Drive, Ruislip
33667/T/97/0684
37,425.09 37,425.09 0.00 0.00 0.00 37,425.09 0.00 Highway improvements adjacent to the site. Legal advice stated that because of time
that has elapsed, it would not be reasonable to proceed without Sainsbury's
agreement. Officers investigating the potential to utilise these funds for traffic
congestion mitigation at that junction to complement current works that have been
commissioned for that location. A portion of land owned by Sainsbury's would need to
be dedicated as public highway for the scheme to be feasible. Traffic congestion
mitigation scheme is fully funded. Officers investigating whether improvements could
be tied into 114 bus route project. Excess funds are to be refunded to the developer
following the date of the Final Account.
FINANCIAL UPDATE ON SECTION 106 AND 278 AGREEMENTS AT 31 MARCH 2010 APPENDIX 1
CASE REF. WARD SCHEME / PLANNING
REFERENCE
TOTAL INCOME TOTAL INCOME TOTAL
EXPENDITURE
TOTAL
EXPENDITURE
2009 / 2010
EXPENDITURE
BALANCE OF
FUNDS
BALANCE
SPENDABLE
NOT
ALLOCATED
COMMENTS
(as at mid May 2010)
AS AT 31/ 3/10 AS AT 31/12/09 AS AT 31/ 3/10 AS AT 31/12/10 To 31/ 3/10 AS AT 31/ 3/10 AS AT 31/ 3/10
PT/37/40B-C
*53
(see: PPR/29)
Botwell Land at Thorn EMI Complex -
Highways Works & Environmental
Improvements
51588/APP/2000/366&1418
559,443.43 559,443.43 372,015.36 372,015.36 0.00 187,428.07 0.00 Project 40B- Environmental improvements in Blyth Road. Funds committed to
highways works on Blyth Road and subway CCTV. Unspent funds at 6 months of
occupation to be refunded. Ongoing discussions with developers.
Project 40C- Council’s costs in the implementation, and supervision & administration
fees related to the highway works. Unspent funds following final account to be
refunded. Awaiting developer regarding implementation of phase 3 highways works.
PT37/40E
*47
Botwell Land at Thorn EMI Complex -
Parking
51588/APP/2000/366&1418
32,805.42 32,805.42 0.00 0.00 0.00 32,805.42 0.00 Project 40E - £30,000 received for controlled parking in Blyth Road area. There are
no immediate plans to consult with the residents of the area around Blyth Road on
the introduction of a residents parking scheme. These funds may be required to
address additional parking pressure on the surrounding residential roads once the
development has been completed and is fully occupied. Officers continue to monitor
the parking situation. Unspent to be refunded 5 years following implementation (date
yet to be confirmed).
PT/37/40F Botwell Land at Thorn EMI Complex.
51588/APP/2000/366&1418
100,000.00 100,000.00 0.00 0.00 0.00 100,000.00 0.00 Funds received towards the funding of environmental improvements in Dawley Road
(to include pedestrian safety). Unspent funds to be returned within 5 years of
implementation (Jan 2013). Funds allocated towards scheme of improvements
(Cabinet Member decision 19/2/10)
PT/41/94A
(See also E/29)
*19
Yiewsley Land to the West of Stone Close,
Horton Road, Yiewsley /
54822/APP/2000/424 (outline)
9,794.97 9,794.97 0.00 0.00 0.00 9,794.97 0.00 £8,333.34 received on 17 February 2003 as a capital contribution towards improved
public transportation in the area of Yiewsley. £934.14 is interest accrued. If planning
permission is implemented within 5 years of the grant there are no time constraints
on the spend. Planning permission yet to be implemented. Officers investigating
whether funds should be returned considering planning permission has expired.
PT/41/94B Yiewsley Land to the West of Stone Close,
Horton Road, Yiewsley
54822/APP/2003/718 (full)
4,922.23 4,922.23 4,922.23 0.00 4,922.23 0.00 0.00 Received as a contribution towards public transport initiatives in the Borough.
Officers have investigated findings of a freight study in Horton Road but are unable
to use funds.TfL have been notified of availability of funds. Unspent funds by 17
February 2010 to be returned. Funds now earmarked for transport initiatives
associated with Yiewsley/ West Drayton Town Centre improvements. Scheme began
on site Feb 2010 (see PPR26/84).
PT/41/94C
*19
Yiewsley Land to the West of Stone Close,
Horton Road, Yiewsley /
54822/APP/2000/424 (outline)
5,883.03 5,883.03 0.00 0.00 0.00 5,883.03 0.00 Received as a contribution towards planting and offsite maintenance of landscaping
on the 'Landscaping Land'. If planning permission is implemented within 5 years of
the grant there are no time constraints on the expenditure of funds. Planning
permission yet to be implemented. Officers investigating whether funds should be
returned considering planning permission has expired.
PT/42/41 Heathrow
Villages
Temp Stockpiling at Bedfont Court.
47853/SPP/2003/113
50,000.00 50,000.00 0.00 0.00 0.00 50,000.00 0.00 £50,000 for landscape enhancement on specified land around the development.
Unexpended funds at 19 June 2006 were to be repaid to the developer. Following
consultations with BAA it has been agreed to spend the funds as part of the Colne
Valley project. Deed of variation has been secured to remove time limits.
PT/44/03 Various S278 Surplus
157,291.81 157,291.81 85,933.82 85,933.82 0.00 71,357.99 0.00 Income is from underspends on s278 projects where surplus funds do not have to be
refunded. First priority for use of funds is to address otherwise irresolvable deficits
from overspent projects. £322.14 income from PT278/26/127 has been transferred
back. A further £1,391.64 transferred to reconcile overspend on PT278/26/127.
£1,945.35 used towards zebra crossing scheme at PT/105/175B.
PT/54/21C Botwell Former EMI Site, Dawley Road -
Landscaping 6198/BS/98/1343
57,000.00 57,000.00 0.00 0.00 0.00 57,000.00 0.00 £50,000 for Landscaping on adjacent land and £7,000 for maintenance of the
landscaping works. Funds to be held for landscaping in accordance with the
agreement subject to Crossrail. No time constraints.
FINANCIAL UPDATE ON SECTION 106 AND 278 AGREEMENTS AT 31 MARCH 2010 APPENDIX 1
CASE REF. WARD SCHEME / PLANNING
REFERENCE
TOTAL INCOME TOTAL INCOME TOTAL
EXPENDITURE
TOTAL
EXPENDITURE
2009 / 2010
EXPENDITURE
BALANCE OF
FUNDS
BALANCE
SPENDABLE
NOT
ALLOCATED
COMMENTS
(as at mid May 2010)
AS AT 31/ 3/10 AS AT 31/12/09 AS AT 31/ 3/10 AS AT 31/12/10 To 31/ 3/10 AS AT 31/ 3/10 AS AT 31/ 3/10
PT/54/21D Botwell Former EMI Site, Dawley Road -
HGV Signage 6198/BS/98/1343
39,738.91 39,738.91 35,931.70 35,931.70 2,261.66 3,807.21 0.00 £15,000 for HGV signage in the area - officers working towards developing a
scheme. Officers have carried out a Freight Audit of the area and secured funding
from TfL for HGV route signs. Subject to Cabinet Member approval, the £ 15,000 to
be pooled with TfL funding to implement a comprehensive HGV route signage
scheme. Directional signage scheme approved and officers implementing the
scheme in accordance with the £15k allocation. No time constraints. Scheme
implemented Jan 09. Spend towards design and implementation of new signage.
PT/57/27C
(see: EYL/35 & E/18)
South Ruislip Carmichael Close, Ruislip -
Highway Works /
55898/APP/2000/2736
1,371.00 1,371.00 1,371.00 1,371.00 0.00 0.00 0.00 For highway improvements including a temporary waiting scheme. Designs received
from HEC - currently looking at feasibility. Unexpended funds after 5 years of the
sale/renting of the last housing unit (30 July 2008) to be repaid to the developer. No
progress due to uncertainties associated with proposed development at RAF
Northolt. RAF Northolt application approved which if implemented will include these
highways works enabling these funds to be returned. Interest accrued. Expenditure is
on HEC designs. TfL have requested revisions. Revised detailed design for the new
signalised junction agreed. Officers to seek an alternative scheme to be the basis
for a gift funding request if appropriate . Request declined, funds including interest
returned.
PT/61/89B
(see: E/35)
West Drayton LHR Training Centre, Stockley
Close / 51458/97/1537
25,000.00 25,000.00 0.00 0.00 0.00 25,000.00 0.00 £25,000 for improvements at the junction of Stockley Road & Stockley Close /
Lavender Rise, West Drayton. Scheme provided using TfL funding. Further
improvements to area have been implemented as part of the MOD development.
Funds to be held as contingency for any works required to the junction arising out of
the MOD development. No time constraints.
PT/65/74A
(see EYL/40, E/20 &
E/21)
Uxbridge
North
Land at Johnson's Yard (former
garage site), Redford Way,
Uxbridge - Street Lighting
53936/APP/2002/1357
18,893.88 18,893.88 17,871.38 17,871.38 0.00 1,022.50 0.00 Street lighting according to the agreement drawing. No time constraints. Expenditure
due to commencement of project for street lighting on Redford Way at Johnson's
Yard. Columns & lanterns installed and working. Unable to install column in footpath
leading to the high Street. Last column installed, Connection by Southern Electric
were programmed for July 07. Columns all connected but require painting. Officers
chasing painting contractor to progress. Painting completed - final invoices paid.
Final balance to be confirmed after closure of 08/09 financial year accounts.
PT/68/96A Uxbridge
North
Land at Sanderson Site and
Braybourn - Tramway feasibility,
resident parking scheme /
35347/APP/2000/1294 & 1296
43,481.32 43,481.32 24,991.85 24,991.85 0.00 18,489.47 0.00 £80k received for feasibility work to be carried out into the possible provision of a
tramway, increased restrictions in favour of residential car parking, other relevant
transport initiatives, and associated training initiatives (40k transferred to PPR/30 for
Stockley Academy Adult Training Scheme). Funds were spent on the extension of
Uxbridge North Parking Management Area which has been completed. Balance
allocated towards Uxbridge Station access improvements. No time constraints.
Funds now earmarked towards improvements to Bakers Yard, pending a review by
TfL.
PT/71/99 Uxbridge
South
UB1 Vine Street Uxbridge
11005/AG/97/360
250,000.00 250,000.00 248,521.47 237,552.88 88,604.74 1,478.53 0.00 To facilitate enhancements of the Old Uxbridge Conservation Area and the Town
Centre - committed to Windsor Street scheme. Consultations undertaken. High St
works programmed to be implemented late 2006 - complete. Further consultations
for Windsor Street, Granges Yard and Market Square completed and Cabinet
Member approval received for scheme to include resurfacing, plaques, signage and
parking.
Works programmed for summer 09/10 financial year to spend this balance
and the balance at PT/96/164. No time constraints. Scheme in progress: phase 1
completed November 09. Phase 2 completed March 2010. Minor works
outstanding.
FINANCIAL UPDATE ON SECTION 106 AND 278 AGREEMENTS AT 31 MARCH 2010 APPENDIX 1
CASE REF. WARD SCHEME / PLANNING
REFERENCE
TOTAL INCOME TOTAL INCOME TOTAL
EXPENDITURE
TOTAL
EXPENDITURE
2009 / 2010
EXPENDITURE
BALANCE OF
FUNDS
BALANCE
SPENDABLE
NOT
ALLOCATED
COMMENTS
(as at mid May 2010)
AS AT 31/ 3/10 AS AT 31/12/09 AS AT 31/ 3/10 AS AT 31/12/10 To 31/ 3/10 AS AT 31/ 3/10 AS AT 31/ 3/10
PT/76/119 Northwood Land at 64 Ducks Hill Road
Northwood/ 26900L/99/1077
35,253.56 35,253.56 4,597.00 1,097.00 4,060.00 30,656.56 0.00 To provide a speed camera, anti-skid surface and associated road markings in
Ducks Hill Road. Speed camera cannot be installed in this location, as the accident
rate in this location is below the threshold established by TfL. Deed of variation not
required. Site included in vehicle activated sign (VAS) forward programme. Officers
looking into feasibility of 'Driver Feedback Sign'. Implementation due Spring 2007,
subject to feasibility. Quotes being sought with the view to possible purchase of
signs. Interest accrued. No time constraints. Utilities works completed Nov 08. Anti-
skid can be implemented following 3 months after completion of utilities works.
Scheme programmed for implementation April/May 2010. Spend towards the
provision of anti skid.
PT/77/123 Yeading Grand Union Village, Ruislip Road,
Southall/ 327/APP/2000/2106
51,036.05 51,036.05 51,036.05 51,036.05 39,265.30 0.00 0.00 Public transport or highways improvements which relate to the development in the
surrounding area. Allocated for highways works in the area (priority to Teardrop
Roundabout improvements). Following liaison with the Ward Councillor and local
residents, some amended proposals have been tabled by residents and further
investigations were undertaken. A scheme has been agreed in principle with the
Ward Councillors and the Residents’ Association and this will be reviewed with the
Cabinet Member to seek his approval. Work completed July 2008. Scheme
complete, remaining funds allocated to programme of highway improvements in
vicinity of Broadmead Road. Funds unspent as at 13 October 2009 to be refunded.
Scheme completed September 09.
PT/78/10B
(See also PT278/55)
Uxbridge
North
Land at Sanderson Site and
Braybourn / 35347/APP/2000/1294
& 1296
27,986.49 27,986.49 22,458.80 20,990.65 20,603.80 5,527.69 0.00 £25K received November 2004 for Part B Highways Works to be undertaken by
Council and consisting of improvements at junction of Sanderson and Oxford Roads.
Preliminary designs have been drawn. Preliminary estimates have been provided.
TfL have appointed a consultant through their bus route flagship programme to
investigate the system of nodes at Mahjacks, Cedars and Sanderson Road & Oxford
Road. Draft report received. Still await final report. TfL to programme implementation
following receipt of the final report. Due to the approaching deadline for spend
officers looking into any elements that could be addressed at an early stage.
Discussions with TfL continuing. Interest accrued. Funds not spent by November
2009 to be returned to developer. Works completed October 09. Awaiting financial
completion.
PT/80/112 (formerly
PT278/05)
Uxbridge
South
Grand Union Park, Packet Boat
Lane, site ref: 1197 (various
applications)
47,774.85 47,774.85 2,228.56 2,228.56 0.00 45,546.29 0.00 No time constraints. Officers looking into project for spend of balance at junction of
Packet Boat Lane & Cowley High Street. Cabinet Member for P&T concerned with
affect of proposal and blind road bend heading towards Uxbridge. Funds to be held
until sight lines are resolved.
PT/82/114 (formerly
PT278/23)
Uxbridge
South
Waterloo Road, Uxbridge -
Highway Works / 332BD/99/2069
13,169.44 13,169.44 11,577.00 11,577.00 0.00 1,592.44 0.00 Highway Works for alternative traffic management on Waterloo Road. No time limits.
Cabinet Member for Planning & Transportation has approved use of funds to extend
the Uxbridge South Parking Management Scheme approved. Implementation
occurred in the Autumn. £11k spend on Waterloo Road from the Parking Revenue
Account to be recharged to this case for next quarter. Recharcharge completed.
PT84/87B-D
(Formerly part of
PT278/44)
Brunel Brunel s106 16 April 04
532/SPP/2002/2237
27,596.36 14,795.29 2,345.30 1,760.00 585.30 25,251.06 0.00 £3,000 + interest for monitoring of landscape management plan (87B), £10,000 +
interest for monitoring of green travel and public transport obligations (87D), and
£200 + interest initial payment associated with footpath works to be undertaken by
Council (87C). Engineers inspected site to ascertain whether works are required &
whether further payments are due late Jan 2006. Officers chasing Brunel to provide a
disabled ramp from the back of the privately owned footway at Hillingdon Hill. Interest
accrued. £10k plus interest received for improvements (including lighting) to the
footpath alongside the River Pinn linking 'Site 2' to Uxbridge Road transferred
from PT278/44 and held as security for Brunel to implement the footpath works
as above. Spend towards monitoring Landscape management Plan.
FINANCIAL UPDATE ON SECTION 106 AND 278 AGREEMENTS AT 31 MARCH 2010 APPENDIX 1
CASE REF. WARD SCHEME / PLANNING
REFERENCE
TOTAL INCOME TOTAL INCOME TOTAL
EXPENDITURE
TOTAL
EXPENDITURE
2009 / 2010
EXPENDITURE
BALANCE OF
FUNDS
BALANCE
SPENDABLE
NOT
ALLOCATED
COMMENTS
(as at mid May 2010)
AS AT 31/ 3/10 AS AT 31/12/09 AS AT 31/ 3/10 AS AT 31/12/10 To 31/ 3/10 AS AT 31/ 3/10 AS AT 31/ 3/10
PT/88/140 B Pinkwell MOD Records Office, Stockley
Road, Hayes - Offsite Footpath
18399/APP/2004/2284
3,207.23 3,207.23 0.00 0.00 0.00 3,207.23 0.00 £3,000 is the of-site public footpath contribution for the provision of a footpath in the
location specified in the legal agreement. Work to commence following completion
of construction phase of the development which is underway. Unspent funds to be
repaid following 7 years of receipt (i.e. 14 October 2012).
PT/88/140C *38 Pinkwell MOD Records Office, Stockley
Road, Hayes - Public Transport
18399/APP/2004/2284
754,743.82 754,743.82 2,392.75 2,392.75 0.00 752,351.07 0.00 Funds received as first and second instalments (plus indexation payment) of the
public transport contribution to enhance the level of public transport to and from the
area of the development site. Discussions with TfL expected in Spring regarding bus
route funding. TfL has been approached with regard to extending the U4 bus route.
TfL has advised that if feasible a scheme could be implemented once development
of the housing units are complete and estate roads are adopted expected in 9
months time. Double yellow lines required for bus route through site .
TMO
approved.TfL in consultation with developer regarding location of bus shelter.
Unspent funds to be repaid following 7 years of receipt (I.e. 14 October 2012 for 1st
instalment,19 March 2014 for the 2nd instalment and 30 April 2015 for the 3rd
instalment). All funds now received. Spend this quarter towards fees and executing
TMO.
PT/88/140F
*46
Pinkwell MOD Records Office, Stockley
Road, Hayes - Parking
18399/APP/2004/2284
73,774.40 73,774.40 0.00 0.00 0.00 73,774.40 0.00 Funds received for parking management system in Bourne Avenue and surrounding
streets of the new and existing estate roads utilised within the residential part of the
development. There are currently no plans to consult with residents of the area on a
Parking Management Scheme. However, any resident objections to increases in
commuter parking on residential roads generated by the MOD development may give
reason to spend these funds. Officers continue to monitor the parking situation.
Funds must be spent within 7 years following date of receipt i.e. 11/12/2013.
PT/91/142A Northwood 3 Reginald Road, Northwood
58866/APP/2005/1087
1,049.35 1,049.35 0.00 0.00 0.00 1,049.35 0.00 For the introduction and maintenance of white lines on the highway adjacent to the
development. Funds not spent within 7 years of receipt of PO1 Form to be refunded.
Scheme completed and final invoices received . Expenditure charged to non-s106
code. Officers investigating whether spend can be recharged.
PT/92/154 Pinkwell 5, 7, 7a & 10 Westlands Industrial
Estate 1902/APP/2005/2370
41,527.00 41,527.00 0.00 0.00 0.00 41,527.00 0.00 Funds received for cycle network improvements. Cycleway and local safety scheme
identified for the junction of Station Road and North Hyde Road. Entire scheme now
to be funded TfL. Officers looking into alternative options. Interest bearing account,
funds must be spent within 7 years following date of receipt i.e. 06/12/2013.
PT/93/147C West Drayton DERA Site, Kingston Lane, West
Drayton - Traffic Calming
45658/APP/2002/3012
20,660.46 20,660.46 0.00 0.00 0.00 20,660.46 0.00 To be applied towards traffic calming measures in Kingston Lane. Traffic calming
measures are already in place in Kingston Lane. Officers are investigating options for
spend within the terms of the legal agreement in combination with funds at
PT/93/147D. Funds not spent by 19 February 2014 are to be refunded.
PT/93/147D West Drayton DERA Site, Kingston Lane, West
Drayton - Cycle Network
45658/APP/2002/3012
33,056.72 33,056.72 0.00 0.00 0.00 33,056.72 0.00 To be applied towards the cycle improvements for the London Cycle Network
including such works for the Heathrow to Hillingdon Hill cycle way adjacent to the
Land. Officers are investigating options for spend within the terms of the legal
agreement in combination with funds at PT/93/147C. Funds not spent by 19 February
2014 are to be refunded.
PT/95/161A West Drayton Former Honeywell Site, Trout Road,
West Drayton - Footpath
335/APP/2002/2754
18,155.95 18,155.95 0.00 0.00 0.00 18,155.95 0.00 To be applied towards the provision of a footpath from the site crossing over the
Grand Union Canal along Trout Road to the High Street. Unexpended funds after 7
years of receipt (31 January 2014) are to be refunded including interest. Funds to be
held until outcome of Tesco site determined.
PT/96/164 Uxbridge
South
36-38 Windsor Street (Westcombe
House), Uxbridge
13544/APP/2005/31
10,516.65 10,516.65 3,753.58 3,753.58 0.00 6,763.07 0.00 For environmental enhancement on Windsor Street and the surrounding area. Funds
not spent by 1 April 2014 are to be refunded. See updates on PT/71/99. Spend
towards purchase of benches and information boards.
FINANCIAL UPDATE ON SECTION 106 AND 278 AGREEMENTS AT 31 MARCH 2010 APPENDIX 1
CASE REF. WARD SCHEME / PLANNING
REFERENCE
TOTAL INCOME TOTAL INCOME TOTAL
EXPENDITURE
TOTAL
EXPENDITURE
2009 / 2010
EXPENDITURE
BALANCE OF
FUNDS
BALANCE
SPENDABLE
NOT
ALLOCATED
COMMENTS
(as at mid May 2010)
AS AT 31/ 3/10 AS AT 31/12/09 AS AT 31/ 3/10 AS AT 31/12/10 To 31/ 3/10 AS AT 31/ 3/10 AS AT 31/ 3/10
PT/97/169A Uxbridge
South
Colham House Taxi Rank
Relocation 27298/APP/2006/875
15,000.00 15,000.00 6,038.40 6,038.40 6,038.40 8,961.60 0.00 Funds received for the relocation of the black cab taxi rank from Bakers Yard.
Alternative taxi rank proposal advertised in the London Gazette. Cabinet Member
report prepared to consider merits of implementing proposal.Taxi rank relocation
agreed for implementation (Cabinet Member approval received July 2008). Taxi rank
changes implemented July 09. Funds not spent by July 2012 are to be returned.
PT/98/169B Uxbridge
South
Colham House Footpath Re-Paving
27298/APP/2006/875
40,000.00 40,000.00 0.00 0.00 0.00 40,000.00 0.00 Funds received for footpath repaving within the immediate vicinity of the site. Funds
not spent by July 2012 are to be returned. Officers looking into scheme of
improvements for Bakers Yard.
PT/99/169C Uxbridge
South
Colham House Kerb Alignment
27298/APP/2006/875
5,000.00 5,000.00 0.00 0.00 0.00 5,000.00 0.00 Funds received for the kerb realignment within the immediate vicinity of the site.
Funds not spent by July 2012 are to be returned. Officers looking into a scheme of
improvements in Bakers Yard.
PT/100/169D Uxbridge
South
Colham House Side Alley Re-
surfacing 27298/APP/2006/875
10,000.00 10,000.00 0.00 0.00 0.00 10,000.00 0.00 Funds received for the resurfacing of the side alley located immediately adjoining the
site. Funds not spent by July 2012 are to be returned. Officers looking to include
funding as part of a scheme of improvements for Bakers Yard .
PT/101/170A Uxbridge
South
11 - 21 Clayton Road, Hayes
56840/APP/2004/630
30,527.21 30,527.21 0.00 0.00 0.00 30,527.21 0.00 Funds received for parking management in the area. Funds held to be used in
combination with those at case ref. PT/37/40E should any scheme be required.
Funds not spent by 31 August 2014 are to be refunded.
PT/102/161D Yiewsley Honeywell Site, Trout Road
Yiewsley 335/APP/2002/2754
154,302.99 154,302.99 0.00 0.00 0.00 154,302.99 154,302.99 Funds received for public transport and community facilities initiatives. Funds not
spent by 20 September 2014 are to be repaid.
PT/103/174A Heathrow
Villages
Terminal 2, Heathrow
62360/APP/2006/2942
100,000.00 100,000.00 0.00 0.00 0.00 100,000.00 0.00 Funds received for the West Drayton to Heathrow Cycle Scheme. Funds not spent
by 16 November 2015 are to be repaid.
PT/104/147H West Drayton DERA Site, Kingston Lane, West
Drayton
45658/APP/2002/3012
10,000.00 10,000.00 0.00 0.00 0.00 10,000.00 0.00 Funds received for the installation and maintenance of CCTV cameras on the site as
specified in the relevant planning permission. Cameras to be installed by the
developer. Funds to be retained as security. No time constraints.
PT/106/149E Hayes Hayes Goods Yard
10057/APP/2005/2996 & 2999
119,402.15 119,402.15 0.00 0.00 0.00 119,402.15 0.00 Funds received towards enhancements to the London Cycle Network, route 88A or
any other cycle route that is likely to be used by the occupiers of the development.
Funds to be spent by Oct 2015.
PT/107/149F Hayes Hayes Goods Yard
10057/APP/2005/2996 & 2999
132,209.06 132,209.06 132,209.00 0.00 132,209.00 0.06 0.00 Funds received for improvements to pedestrian & cycleway linkages between the site
& Botwell Green, or environmental improvements to Botwell Green as agreed with the
owner. Funds must be spent or returned by Oct 2015. Officers looking into whether
any schemes at Botwell Green can utilise these funds in conjuction with funds held at
CSL/3/140I. Funds allocated to the construction of a new footpath link at Botwell
Green (Cabinet Member decision 21/10/09).Scheme complete March 2010.
PT/108/155E West Drayton Former RAF Porters, West Drayton.
5107/APP/2005/2082
1,000.00 1,000.00 0.00 0.00 0.00 1,000.00 0.00 Funds received to provide a local walking bus scheme. Funds to be spent within 3
years of receipt (Jan 2012)
PT/109/194A Uxbridge Frays Adult Education Centre,
Harefield Road, Uxbridge.
18732/APP/2006/1217
10,000.00 10,000.00 0.00 0.00 0.00 10,000.00 0.00 Funds received towards street lighting in the vicinity of the site. No time limits. Funds
earmarked towards a lighting scheme for the public footpath which runs adjacent to
the site.
PT/110/198B *61 Uxbridge Former Gas Works Site (Kier Park)
at Cowley Mill Road, Uxbridge
3114/APP/2008/2497
14,240.00 14,240.00 0.00 0.00 0.00 14,240.00 0.00 Travel Plan Bond received to ensure compliance by the owner for monitoring and
reporting in accordance with the travel plan. To be refunded after 10 years.
PT/111/204A *63 Uxbridge 106, Oxford Road, Uxbridge.
26198/APP/2008/2338
20,000.00 20,000.00 0.00 0.00 0.00 20,000.00 0.00 Travel Plan Bond received to ensure compliance by the tennant of its monitoring and
reporting obligations in accordance with the travel plan. Returnable.
PT/112/204A Eastcote RAF Eastcote, Lime Grove, Ruislip.
10189/APP/2004/1781
7,502.15 7,502.15 0.00 0.00 0.00 7,502.15 0.00 Contribution towards improvements to the London cycle network within a radius of
1500m of the site. Funds to be spent by September 2013
FINANCIAL UPDATE ON SECTION 106 AND 278 AGREEMENTS AT 31 MARCH 2010 APPENDIX 1
CASE REF. WARD SCHEME / PLANNING
REFERENCE
TOTAL INCOME TOTAL INCOME TOTAL
EXPENDITURE
TOTAL
EXPENDITURE
2009 / 2010
EXPENDITURE
BALANCE OF
FUNDS
BALANCE
SPENDABLE
NOT
ALLOCATED
COMMENTS
(as at mid May 2010)
AS AT 31/ 3/10 AS AT 31/12/09 AS AT 31/ 3/10 AS AT 31/12/10 To 31/ 3/10 AS AT 31/ 3/10 AS AT 31/ 3/10
PT/113/198C Uxbridge Former Gas Works Site (Kier Park)
at Cowley Mill Road, Uxbridge
3114/APP/2008/2497
24,410.43 24,410.43 0.00 0.00 0.00 24,410.43 24,410.43 Contribution towards the provision of public transport improvements in the vicinity of
the land. Funds to be spent within 7 years of receipt (Nov 2016).
PT/114/209A
*67
Yiewsley Tesco, Trout Road, Yiewsley.
60929/APP/2007/3744
25,000.00 0.00 0.00 0.00 0.00 25,000.00 0.00 Travel Plan Bond received to ensure compliance by the owner for monitoring
and reporting in accordance with the Travel Plan. To be refunded five years
following first occupation.
PT/115/209B Yiewsley Tesco, Trout Road, Yiewsley.
60929/APP/2007/3744
4,850.00 0.00 0.00 0.00 0.00 4,850.00 0.00 Contribution received for the purpose of the purpose of setting up a car club.
Funds to be spent within 5 years of receipt (March 2013).
PT/116/210A Hayes Hayes Stadium, Judge Heath
Lane, Hayes.
49996/APP/2008/3561
30,000.00 0.00 0.00 0.00 0.00 30,000.00 0.00 Contribution received towards the cost of upgrading two bus shelters in the
vicinity of the development. Funds to be spent witihn 5 years of receipt (March
2015).
PLANNING &
TRANSPORTATION SUB -
TOTAL
4,329,028.53 4,256,377.46 1,379,301.10 1,225,647.83 298,550.43 2,949,727.43 178,713.42
PLANNING &
TRANSPORTATION TOTAL
6,451,184.31 6,354,750.26 2,121,709.60 1,966,309.93 372,258.72 4,329,474.71 178,713.42
PORTFOLIO: CULTURE, SPORT AND LEISURE
CSL/1/13
(formerly EYL/15/13)
Townfield Sainsbury-Minet D. /
40601H/91/1970
1,433,000.00 1,433,000.00 1,432,700.15 1,432,700.15 0.00 299.85 0.00 The balance is committed to providing secure parking and perimeter fencing at Minet
Country Park in accordance with the agreement. Work undertaken in parallel with
Goals 5 a side development. Work complete. Funds allocated to gating on perimeter
fencing. There are no time constraints for expenditure. Remaining funds spent
towards movable barriers. Awaiting financial completion.
CSL/2/147E West Drayton DERA Site, Kingston Lane, West
Drayton - Community Facility
45658/APP/2002/3012
94,015.15 94,015.15 53,830.08 0.00 53,830.08 40,185.07 0.00 To be applied towards communal facility improvements in the West Drayton area and
which will benefit the occupiers of the Development. £151,786.77 transferred to
EYL/77/147F as they were received for school places and were originally allocated to
this case reference erroneously. Funds not spent by 19 February 2014 are to be
refunded. Officers looking to commit these funds to the West Drayton Youth Centre
expansion. Funds allocated to the "Skidz " project at West Drayton Young People's
Centre (Cabinet Member decision 21/10/09). Phase 1 complete. Phases 2 & 3
programmed for summer 2010.
CSL/3/140I Pinkwell MOD Records Office Stockley
Road/Bourne Avenue, Hayes
18399/APP/2004/2284
69,189.85 69,189.85 69,189.85 0.00 69,189.85 0.00 0.00 To be applied towards the provision or improvement of community facilities (but not
including open space and recreation facilities) at Botwell Green and/or any other
location within the area of the Development. Officers looking into whether any
schemes at Botwell Green could potentially draw upon these funds. Unspent funds to
be repaid following 7 years of receipt (i.e. 3 January 2014) including interest. Funds
allocated to the construction of the new Community Leisure Centre at Botwell Green.
(Cabinet Member decision 21/10/09). Works complete, new centre due to open 1st
June 2010.
CSL/4/152A
(Formerly: PPR/35)
Brunel Middlesex Lodge, 189 Harlington
Road, Hillingdon
12484/APP/2005/1791
20,629.80 20,629.80 20,629.80 0.00 20,629.80 0.00 0.00 Funds received to provide for Community Facilities that are likely to be used by
residents of the development. No time constraints on the expenditure of funds.
Funds allocated to the construction of the new Community Leisure Centre at Botwell
Green (Cabinet Member decision 21/12/09). Works complete, new centre due to
open 1st June 2010.
CSL/5/184A West Ruislip 31-46, Pembroke Road, Ruislip
59816/APP/2006/2896
49,601.53 49,601.53 0.00 0.00 0.00 49,601.53 0.00 Funds have been allocated to the dining centre for Northwood and Ruislip elderly
persons association. Funds not spent by 1/07/2015 to be returned.
CSL/6/189A Ruislip 30 Kings End, Ruislip.
46299/APP/2006/2165
7,674.48 7,674.48 0.00 0.00 0.00 7,674.48 0.00 Towards the provision of community facilities in the immediate vicinity of the land. No
time limits. Earmarked towards Manor Farm Library. Subject to formal allocation of
funding.
CSL/7/195A Ruislip Highgrove House, Eastcote Road,
Ruislip. 10622/APP/2006/2494
9,578.00 9,578.00 0.00 0.00 0.00 9,578.00 9,578.00 Funds received towards the improvement of community facilities in the vicinity of the
site. No time constraints on the expenditure of funds.
CSL/8/194B Uxbridge Frays Adult Education Centre,
Harefield Road, Uxbridge.
18732/APP/2006/1217
24,050.00 24,050.00 24,050.00 0.00 24,050.00 0.00 0.00 Funds received towards the provision of community facilities in the Borough. No time
constraints. Funds allocated towards the construction of the new Community Leisure
Centre at Botwell Green. (Cabinet Member decision 21/12/09). Works complete,
new centre due to open 1st June 2010.
FINANCIAL UPDATE ON SECTION 106 AND 278 AGREEMENTS AT 31 MARCH 2010 APPENDIX 1
CASE REF. WARD SCHEME / PLANNING
REFERENCE
TOTAL INCOME TOTAL INCOME TOTAL
EXPENDITURE
TOTAL
EXPENDITURE
2009 / 2010
EXPENDITURE
BALANCE OF
FUNDS
BALANCE
SPENDABLE
NOT
ALLOCATED
COMMENTS
(as at mid May 2010)
AS AT 31/ 3/10 AS AT 31/12/09 AS AT 31/ 3/10 AS AT 31/12/10 To 31/ 3/10 AS AT 31/ 3/10 AS AT 31/ 3/10
CSL/9/199A Ruislip 41, Kingsend, Ruislip.
2792/APP/2006/3451
9,338.43 9,338.43 0.00 0.00 0.00 9,338.43 0.00 Funds received towards the provision of community facilities in the Borough. No time
constraints. Earmarked towards Manor Farm Library. Subject to formal allocation of
funding.
CSL/10/200B Manor Former Ruislip Manor Library,
Victoria Road, Ruislip.
14539/APP/2008/2102
5,200.00 5,200.00 0.00 0.00 0.00 5,200.00 0.00 Funds received towards improvements to neary by community facilities. Earmarked
towards Ruislip Manor Library and Community Resources Centre. Subject to formal
allocation of funding.
CSL/11/205B Eastcote RAF Eastcote, Lime Grove, Ruislip.
10189/APP/2004/1781
277,131.54 277,131.54 0.00 0.00 0.00 277,131.54 0.00 Contribution towards the provision or improvement of leisure, youth and/or cultural
services within Eascote and East Ruislip ward boundary. Funds to be spent by
September 2014. Earmarked towards Highgrove pool improvement programme.
Subject to formal allocation of funds.
CULTURE, SPORT AND
LEISURE SUB - TOTAL
1,999,408.78 1,999,408.78 1,600,399.88 1,432,700.15 167,699.73 399,008.90 9,578.00
PORTFOLIO: EDUCATION AND CHILDREN'S SERVICES
EYL/14/75 Heathrow
Villages
Land at 78-84 The Crescent,
Harlington / 46970/APP/1999/2169
21,972.07 21,972.07 21,639.90 21,639.90 0.00 332.17 0.00 Interest accrued. Allocated to Pinkwell Primary School expansion: feasibility study
commissioned. No time constraints. Expenditure of £21,639.90 will be recharged out
of s106 for closure of 08/09 Financial Year as these project costs should have been
met from school modernisation funds.
EYL/19/44 Harefield The Springs, Springwell Lane,
Rickmansworth / 6679/AZ/98/0897
32,595.93 32,595.93 32,595.93 0.00 32,595.93 0.00 0.00 Towards the provision of primary school places in Harefield. Earmarked for a nursery
scheme at Harefield Infants School. Interest accrued. Unexpended funds by January
2011 to be repaid to the developer. Funds spent towards Harefield Nursery.
EYL/29/54 Pinkwell Hyde House, Newhaven Close,
Hillingdon 2306/SPP/2002/238
37,257.94 37,257.94 36,836.02 36,836.02 0.00 421.92 0.00 For primary school places in the Hayes/Harlington area. Interest accrued. Allocated
to Pinkwell Primary School expansion: feasibility study commissioned. Expenditure
of £27,486.48 will be recharged out of s106 for closure of 08/09 Financial Year as
these project costs should have been met from school modernisation funds. No time
constraints.
EYL/30/30 Yiewsley Former Bridge Works, Bentinck
Road W/D/ 20610/APP/2002/2407
161,898.00 161,898.00 0.00 0.00 0.00 161,898.00 0.00 161,898.00 contribution for the provision of secondary school places in the West
Drayton/Yiewsley area. No LEA Secondary school in West Drayton. Now allocated to
primary school expansion in West Drayton by way of re-imbursement - i.e. it can be
demonstrated that equivalent funding from the Council had been spent to provide
sufficient secondary school places at Stockley Academy (the nearest secondary
school). Time constraint no longer applicable.
EYL/38/104
see: PT278/22
West Drayton Defence Research Agency, West
Drayton - New Nursery & W
Drayton Primary School
Improvements / 49542F/98/1509
394,890.45 394,890.45 389,607.96 389,607.96 0.00 5,282.49 0.00 Nursery construction and school improvements at West Drayton Primary School.
Earmarked for West Drayton area primary expansion. No time constraints.
EYL/39/65A Harefield Land at North Works,
Summerhouse Lane, Harefield
201AJ/98/2472
121,675.43 121,675.43 121,675.43 102,605.08 19,070.35 0.00 0.00 Primary School places in Harefield (103K). Funds spent on the Hillingdon Rising
Fives Programme at Harefield Infant and Junior School. 5K spent towards CCTV at
Harefield Primary with additional match funding of £10,000 from the £250,000 capital
funds (see Cabinet Lead Member report March 2004). No time constraints.
Balance
spent towards Harefield Nursery.
EYL/43/67 Townfield Herne House, Church Walk, Hayes
15405/APP/2003/188
67,843.93 67,843.93 46,354.68 46,354.68 0.00 21,489.25 0.00 Educational places and facilities in the area. Unspent funds 7 years from notice of
implementation (not received) to be refunded. Notice of Implementation requested
from the developer. Interest accrued. Earmarked to the Pinkwell Primary School
expansion project. Expenditure of £46,354.68 will be recharged out of s106 for
closure of 08/09 Financial Year as these project costs should have been met from
school modernisation funds.
EYL/44/81 Heathrow
Villages
339-353 High Street, Harlington
53740/APP/99/310
19,253.00 19,253.00 0.00 0.00 0.00 19,253.00 0.00 For primary school places in the Hayes & Harlington area. No time constraints.
Interest accrued. Earmarked to Pinkwell Primary School: feasibility study
commissioned.
FINANCIAL UPDATE ON SECTION 106 AND 278 AGREEMENTS AT 31 MARCH 2010 APPENDIX 1
CASE REF. WARD SCHEME / PLANNING
REFERENCE
TOTAL INCOME TOTAL INCOME TOTAL
EXPENDITURE
TOTAL
EXPENDITURE
2009 / 2010
EXPENDITURE
BALANCE OF
FUNDS
BALANCE
SPENDABLE
NOT
ALLOCATED
COMMENTS
(as at mid May 2010)
AS AT 31/ 3/10 AS AT 31/12/09 AS AT 31/ 3/10 AS AT 31/12/10 To 31/ 3/10 AS AT 31/ 3/10 AS AT 31/ 3/10
EYL/66/144 Northwood 68 Ducks Hill Road
11900/APP/2005/1087
183,044.65 183,044.65 99,819.57 99,819.57 0.00 83,225.08 0.00 Towards the costs of providing primary and secondary school places in the Borough.
No time constraints. £16,400 spent on Ruislip High School. £75,852.85 spent
towards Ruislip High School costs. Earmarked for Primary School expansions in
north Ruislip/Northwood areas. Further £1,423 spent towards Ruislip High School.
£5,000 spent towards Sacred Heart Primary School modernisation.
EYL/67/145 West Drayton 6A Swan Road West Drayton
9037/APP/2005/2945
21,928.87 21,928.87 0.00 0.00 0.00 21,928.87 0.00 Towards the costs of providing primary and secondary school places in the Borough.
Earmarked for West Drayton area primary expansion. No time constraints.
EYL/71/155B West Drayton Fmr RAF West Drayton, Porters
Way, West Drayton
5107/APP/2005/2082
953,668.35 953,668.35 485,861.35 485,861.35 0.00 467,807.00 467,807.00 First contribution received as a third of the total education contribution. To be used
solely for the purpose of funding additional places at primary and/or secondary
schools within a three mile radius of the site. Earmarked for West Drayton area
primary expansion. Funds to be spent within three years of receipt i.e. first
contribution spent by 05/12/2009. £465,861.35 spent towards Uxbridge High School
construction project. £20,000 spent towards Longmead Primary School expansion.
Second contribution (£467,807.00) received towards the same purpose. Second
contribution to be spent by Dec 2012.
EYL/74/158 Botwell 29 Dawley Road, Hayes
11280/APP/2005/678
14,543.00 14,543.00 0.00 0.00 0.00 14,543.00 0.00 Towards the costs of providing primary and secondary school places in the Borough.
Earmarked for Pinkwell classrooms. No time constraints.
EYL/76/163 West Drayton 18a Colham Ave, West Drayton
29679/APP/2006/1048
18,939.00 18,939.00 8,826.00 8,826.00 0.00 10,113.00 0.00 To be applied towards primary and secondary school places within 3 miles of the
development. £10,113.43 is earmarked for West Drayton area primary expansion.
No time limits. Remainder to be used at Uxbridge High School modernisation. £8,826
spent towards Uxbridge High School construction project.
EYL/78/161B
(see also:
EYL/86/161B)
West Drayton Former Honeywell Site, Trout Road,
West Drayton
335/APP/2002/2754
243,320.37 243,320.37 186,447.40 186,447.40 0.00 56,872.97 0.00 25% of the total education contribution to be applied towards the provision of new
school places and the improvement of existing education facilities at all primary
schools within the Yiewsley, West Drayton and Cowley area and secondary schools
within 3 miles of the site. Funds earmarked for West Drayton area primary expansion.
Unexpended funds after 7 years of receipt are to be refunded (31 January 2014)
including interest. £186,447.40 spent towards Longmead Primary School expansion.
EYL/79/140G Pinkwell MOD Records Office Stockley
Road/Bourne Avenue, Hayes
(Kings Oak)18399/APP/2004/2284
791,811.37 791,811.37 0.00 0.00 0.00 791,811.37 0.00 To be applied towards the costs of providing educational places at any
Text extracted automatically from the PDF, so layout, tables and images are not shown. Only the start of this long document is shown here. Open the original PDF on LB Hillingdon’s website.
Read the text of: Printed minutes PDF 245 KB (21 pages)
FINANCIAL UPDATE ON SECTION 106 AND 278 AGREEMENTS AT 31 MARCH 2010 APPENDIX 1
CASE REF. WARD SCHEME / PLANNING
REFERENCE
TOTAL INCOME TOTAL INCOME TOTAL
EXPENDITURE
TOTAL
EXPENDITURE
2009 / 2010
EXPENDITURE
BALANCE OF
FUNDS
BALANCE
SPENDABLE
NOT
ALLOCATED
COMMENTS
(as at mid May 2010)
AS AT 31/ 3/10 AS AT 31/12/09 AS AT 31/ 3/10 AS AT 31/12/10 To 31/ 3/10 AS AT 31/ 3/10 AS AT 31/ 3/10
SECTION 278
PORTFOLIO: PLANNING AND TRANSPORTATION
PT278/27/09
(Includes Former
PT/29)
*16
Botwell Stockley Park Phase 3 "Trident
Site" 37977/W/96/1447
604,300.70 591,203.22 14,500.00 14,500.00 0.00 589,800.70 0.00 Spend is engineering fees. Development not yet implemented and highways works
not started. Funds currently held are for security deposit and fully refundable subject
to the due and proper implementation of the Highway works. £2,500 engineering fees
transferred from PT278/27. A further £12,500 of Engineering fees needs to be
claimed from developer should works commence. Interest added . Increase in
income due to return of tax claimed in error.
PT278/30/115
*22
Heathrow
Villages
Terminal 5, Land at Longford
Roundabout, Heathrow s278 10
Jan 02 47853/93/246
10,500.00 10,500.00 0.00 0.00 0.00 10,500.00 0.00 Fees & security (£5,000) associated with Highway Works to be undertaken by
developer. Works consisted of temporary access works from Longford Roundabout
to Western Perimeter Road. Access installed & will be removed following completion
of Terminal 5. Security to be retained pending outcome of BAA proposals to make
this access two-way and permanent for buses and emergency services vehicles as
well as cyclists. Two way access implemented. Officers investigating whether all
required works have been completed. Works completed, security to be refunded after
maintenance period
PT278/34/86A
*18
Brunel Brunel site3 532/SPP/2001/1858 -
Highways Works at Junction
Hillingdon Hill / Kingston Lane &
Pelican Crossing on Kingston Lane
392,358.87 392,358.87 197,448.22 197,448.22 0.00 194,910.65 0.00 Highway Works - £150k refundable security, £124,637.12 received for highway works
at junction of Hillingdon Hill and Kingston Lane, £65,271.32 · received for Kingston
Lane Pedestrian Crossing, £20,500 supervision fees. If the supervision fee following
final completion exceeds 10% of the costs of the works plus statutory undertakers
costs and TTS payment then the excess is to be refunded. Works complete and
signals switched on. Officers continue to chase Brunel to perform remedial works to
grass verges and are investigating options for the use of some of the security for the
Council to perform the remedial works if necessary. Final certificate sent 30/4/09.
PT278/44/87A
*20
Brunel Brunel s278 16 April 04
532/SPP/2002/2237 - Traffic
Calming on Cleveland Road & New
Entrance on Kingston Lane
102,018.78 114,819.85 81,080.74 81,080.74 0.00 20,938.04 0.00 Traffic Calming on Cleveland Road & roundabout on Kingston Lane. £30,900 spent
on engineering fees. £150k Refundable security deposit. £3,200 for Traffic DC
project management costs. £58,962.38 TTS estimate for Pedestrian Crossing on
Cleveland Road. Further payments received following receipt of estimate of works to
cover security/costs. £10,000 received for improvements to a footpath on the site to
be retained a security for Brunel to implement the works and to be transferred to
PT84/87B-D. Traffic Calming on Cleveland Road (including new signalised crossing)
& roundabout on Kingston Lane at new entrance to Brunel University now complete.
TfL invoice paid. Residual on TfL payment due to VAT not claimed - funds to be held
on as contingency for extra TfL costs. Interest Accrued. Remedial work completed
and signed off in December 2007. £10,000 plus interest transferred to PT/84 for
footpath works.
PT278/46/135
*32
Northwood 10A Sandy Lodge Way Northwood
54671/APP/2002/54
7,458.07 7,458.07 2,458.00 2,458.00 0.00 5,000.07 0.00 Improvement of visibility for junction of Sandy Lodge Way & Woodridge Way. ECU
fees have been claimed and £5,000 security remains. Works substantially complete
12 month maintenance period, ended 16 September 2006. Final certificate has been
prepared. Security held to part offset outstanding education contribution which is
being sought via legal proceedings.
PT278/47 Various Refunds Various
37,804.67 37,804.67 15,938.10 15,938.10 0.00 21,866.57 0.00 Funds transferred to here as refunds related to the Heinz, Hayes Park and former BT
site, Glencoe Road, Yeading developments, not yet taken up by developer or
owners. Also £10.79 from Wimpey Site Beaconsfield Road and £232.58 from
Former Magnatex Site Bath Road which is residual interest omitted from refunds
related to those schemes. Officers looking into appropriate recipients for refunds.
FINANCIAL UPDATE ON SECTION 106 AND 278 AGREEMENTS AT 31 MARCH 2010 APPENDIX 1
CASE REF. WARD SCHEME / PLANNING
REFERENCE
TOTAL INCOME TOTAL INCOME TOTAL
EXPENDITURE
TOTAL
EXPENDITURE
2009 / 2010
EXPENDITURE
BALANCE OF
FUNDS
BALANCE
SPENDABLE
NOT
ALLOCATED
COMMENTS
(as at mid May 2010)
AS AT 31/ 3/10 AS AT 31/12/09 AS AT 31/ 3/10 AS AT 31/12/10 To 31/ 3/10 AS AT 31/ 3/10 AS AT 31/ 3/10
PT278/48 Various No Legal Agreement Various 83,520.60 83,520.60 43,981.60 43,981.60 26,404.60 39,539.00 0.00 No Legal Agreement - consultancy fees. £14,000 to be transferred to a
PPR/reference for 1st quarter 08/09 report as these funds are for construction
training secured from the s106 agreement for Budgens Site, South Ruislip.
Expenditure due to ECU fees claimed in relation to Bishop Ramsey school S278
works. £5,200 security deposit received for car park at Mount Vernon Hospital.
Spend towards engineering fees claimed.
PT278/49/117
*23
Yeading Grand Union Village Southall
327/APP/2000/2106
77,331.55 77,331.55 11,447.00 11,447.00 11,447.00 65,884.55 0.00 Security deposit (£5K + interest) for highways works involving traffic calming to the
junction with Glencoe Rd and a cycleway/footway on Broadmead Rd to Hayes
Bypass. £52,363.10 for TfL costs for Broadmead Road Toucan Crossing proposed
as part of works. Additional income is £1K of engineering fees. Detailed plans of
works and design agreed. Consultation undertaken during February 2007 for traffic
calming and toucan crossing. Officers chasing TfL for implementation. Following
consultation Cabinet Member agreed to works to be carried out. Works completed
Aug 09. Further £11,447 received for LBH fees.
PT278/55/10A
*14
(Formerly PT/31)
Uxbridge
North
Land at Sanderson Site and
Braybourn / 35347/APP/2000/1294
& 1296
166,491.05 166,491.05 463.10 463.10 0.00 166,027.95 0.00 Funds held (£140,070 plus interest) as a deposit sum - fully refundable subject to the
due and proper execution of the Highways Works by developer (road widening, the
provision of a mini-roundabout, two new bus stops, extension of a right hand turn
lane on Oxford Rd into Sanderson Road, and removal of existing parking bays).
Engineering fees were paid direct to HEC and did not pass through s106/278
accounts. Works complete. Some outstanding remedial items, which are subject of
on-going discussions with the developer. Funds to be returned following issue of final
certificate. £463.10 additional engineering fees received - claimed by HEC. Interest
accrued.
PT278/57/140 A Pinkwell MOD Records Office Stockley
Road Hayes 18399/APP/2004/2284
419,128.68 419,128.68 325,719.61 323,973.21 23,005.56 93,409.07 0.00 £188,737.70 (including £170,027.34 for Transport For London signals unit) for
installation of two sets of traffic signals, one at the entrance to the site the other at
Lavender Rise on Stockley Road and £190,686.91 received in respect of the
Council's costs for supervision of the works (to be carried out by the owner). Works
complete. Stage 3 road safety audit now agreed await completion of remedial works.
Remedial works completed. Additional item of works being sought by officers who are
chasing the developer for this. Council's costs of £205,686.71 claimed, TTS invoice
for signals at Lavender Rise paid. Funding for additional items of works (removal of
right turn lane) and BT cabling received. Design work and public consultation
completed.
Removal of right turn lane completed Sept 09. Scheme in maintenance
period awaiting financial completion.
PT278/60/147A
*42
West Drayon Former DERA site, Kingston Lane
West Drayton
45658/APP/2002/3012
1,568.98 1,568.98 0.00 0.00 0.00 1,568.98 0.00 £1,500 The Council's costs for the design, administration and supervision of the
works to the public highways surrounding the site to be performed by the developer.
£15,000 held as security for the due and proper execution of the works. Await
progress on site before commencement of these off-site highways works. Highway
works started on site and were due to be substantially complete in September 2007.
Maintenance period complete. Bond plus interest returned. Remaining balance LBH
fees due.
PT278/60/147B West Drayon DERA Site, Kingston Lane, West
Drayton - Highways
45658/APP/2002/3012
56,816.26 56,816.26 0.00 0.00 0.00 56,816.26 0.00 £55,000 was received towards the total cost of highway works for the purchase and
installation of traffic signals at Station Road/ Porters Way Junction and any such
other incidental work as identified by the Council to support the development. Funds
not spent by 19 February 2014 are to be refunded together with interest accrued.
£125.85 interest accrued. These works to be performed by developer of RAF Porters
Way (see PT278/62/148A). Funds to be retained as a contingency for these works.
PT278/62/149A
*51
Botwell Hayes Goods Yard
10057/APP/2004/2996&2999
7,000.00 7,000.00 0.00 0.00 0.00 7,000.00 0.00 The Council's costs due upon lodgement of documents by the developer for the
design, administration and supervision of the works to the public highways
surrounding the site to be performed by the developer. £5,000 received as a
security deposit for the due and proper execution of the highways works by the
developer.
FINANCIAL UPDATE ON SECTION 106 AND 278 AGREEMENTS AT 31 MARCH 2010 APPENDIX 1
CASE REF. WARD SCHEME / PLANNING
REFERENCE
TOTAL INCOME TOTAL INCOME TOTAL
EXPENDITURE
TOTAL
EXPENDITURE
2009 / 2010
EXPENDITURE
BALANCE OF
FUNDS
BALANCE
SPENDABLE
NOT
ALLOCATED
COMMENTS
(as at mid May 2010)
AS AT 31/ 3/10 AS AT 31/12/09 AS AT 31/ 3/10 AS AT 31/12/10 To 31/ 3/10 AS AT 31/ 3/10 AS AT 31/ 3/10
PT278/63/175A
*49
South Ruislip BFPO, R.A.F Northolt
189/APP/2006/2091
5,000.00 5,000.00 0.00 0.00 0.00 5,000.00 0.00 £5k received as the security deposit for the due and proper implementation of
junction works at the White House Gate entrance to the development. Signals
complete and in operation. Currently within 12 month maintenance period. Date of
final completion to be confirmed. Spend towards engineering fees transferred to
PT/278/48.
PT/278/64/173 Eastcote &
East Ruislip
R.A.F. Eastcote
10189/APP/2004/1781
14,200.00 14,200.00 12,201.13 12,201.13 12,201.13 1,998.87 0.00 Engineers fees paid prior to the execution of an agreement to secure access works
associated with this application. Waiting restriction in Lime Grove undertaken. Elm
Ave/Lime Grove junction improvement pending. Elm Ave Pedestrian crossing
technical approval pending.(£5,500) design fees received plus further £6,700 for
temporary footpath works carried out by LBH. £7,500 engineering fees claimed.
Funds spent towards temporary footpath works.
PT/278/65/182
*52
Heathrow
Villages
Longford Roundabout - Fifth Arm,
63369/APP/2007/2294
9,521.00 9,521.00 4,521.00 4,521.00 0.00 5,000.00 0.00 Remaining balance is a security deposit for developer implementation of bus only
access to Terminal 5 Heathrow. Spend on supervision costs.Works complete,
security to be refunded following maintenance period.
PT/278/66/183 Pinkwell Shepiston Lane - Petrol Station
Development
32,000.00 32,000.00 16,000.00 16,000.00 -16,000.00 16,000.00 0.00 Funds received as security for highways improvements being performed by the
developer in lieu of a banker's bond. Works completed and part of the monies has
been refunded. Remaining balance to be refunded following satisfactory completion
of the maintenance period. Further £16,000 security returned to developer.
Remaining balance to be returned following final completion of works.
PT/278/71 Uxbridge
North
Hillingdon House Farm Site E Eng.
Cons. Fees (North Way)
3,150.00 3,150.00 3,150.00 3,150.00 3,150.00 0.00 0.00 Fees received for design checks. Alteration to access road, traffic signals and
advanced warning signs. S278 agreement and technical approval pending. £3,150
engineering fees claimed.
PT/278/72
*66
West Ruislip R.A.F West Ruislip Design check
on S278 Designs
38402/APP/2007/1072
53,986.57 30,500.00 12,500.00 12,500.00 12,500.00 41,486.57 0.00 Fees received for design checks. Pelican crossing and signals on Long Lane. S278
agreement and technical approval pending. Further £18,000 returnable deposit
received to ensure reinstatement of temporary crossover on Alysham Drive. Further
fees received towards inspection fees and traffic orders.
PT/278/73 South Ruislip R.A.F Northolt., South RuislipMain
Gate 189/APP/2007/1321
2,000.00 2,000.00 0.00 0.00 0.00 2,000.00 0.00 Fees received for design checks. Junction improvements at West End Road/
Bridgewater Road. S278 agreement and technical approval pending.
PT/278/74/209 Yiewsley Proposed Tesco development,
Trout Road, Yiewsley
609/APP/2007/2744
3,000.00 3,000.00 0.00 0.00 0.00 3,000.00 0.00 Fees received for design checks for proposed junctionworks and carriageway
widening at Trout Road. S278 agreement and technical approval pending.
PT/278/75 Harefield The Harefield Academy, Harfield
1109/APP/2006/825
4,000.00 4,000.00 0.00 0.00 0.00 4,000.00 0.00 Fees received for design checks. Alteration to Academy entrance and proposed
zebra crossing.S278 agreement and technical approval pending . fees received for
design checks for pedestrian crossing .
PT/278/76/198A
*60
Uxbridge Former Gas Works site (Kier Park),
Cowley Mill Road, Uxbridge
3114/APP/2008/2497
5,000.00 5,000.00 0.00 0.00 0.00 5,000.00 0.00 Funds received as a security deposit for due and proper execution of highways
improvements.S278 agreement.
PT/278/77/197
*62
Ruislip Manor Windmill Hill Public House,
Pembroke Road, Ruislip
11924/APP/2632
24,000.00 24,000.00 1,000.00 1,000.00 1,000.00 23,000.00 0.00 Fees received for design checks (£1,000). £23,000 received as a security deposit to
ensure works are carried at to a satisfactory standard. £1,000 engineering fees
claimed.
SECTION 278 SUB - TOTAL 2,122,155.78 2,098,372.80 742,408.50 740,662.10 73,708.29 1,379,747.28 0.00
SECTION 106
PORTFOLIO: PLANNING AND TRANSPORTATION
FINANCIAL UPDATE ON SECTION 106 AND 278 AGREEMENTS AT 31 MARCH 2010 APPENDIX 1
CASE REF. WARD SCHEME / PLANNING
REFERENCE
TOTAL INCOME TOTAL INCOME TOTAL
EXPENDITURE
TOTAL
EXPENDITURE
2009 / 2010
EXPENDITURE
BALANCE OF
FUNDS
BALANCE
SPENDABLE
NOT
ALLOCATED
COMMENTS
(as at mid May 2010)
AS AT 31/ 3/10 AS AT 31/12/09 AS AT 31/ 3/10 AS AT 31/12/10 To 31/ 3/10 AS AT 31/ 3/10 AS AT 31/ 3/10
PT/05/04a *2 Heathrow
Villages
BA World Cargo / 50045A/95/1043 339,111.08 339,111.08 0.00 0.00 0.00 339,111.08 0.00 The balance is for improvements to public transport serving the south side of London
Heathrow. Any scheme supported by these funds should provide a significant
benefit to BA employees in the vicinity of Heathrow and the views of the Heathrow
Transport Forum sought in determining any scheme. No time limits. BAA led
proposal for upgrade of bus services serving the south side of Heathrow being
discussed. S106 funding (from this case and PT/05/4b) would be used to 'pump
prime' these services with TfL taking on the costs once the available funding has
been used. £210,000 allocated to enhancements to 350 and 423 bus services (
Cabinet Member decision 21/10/09). Enhanced services commenced December 09.
PT/05/04b
*2
Heathrow
Villages
BA World Cargo / 50045A/95/1043
406,331.57 406,331.57 173,645.35 173,645.35 0.00 232,686.22 0.00 The balance is for improvements to public transport serving London Heathrow. Any
scheme supported by these funds should provide a significant benefit to BA
employees in the vicinity of Heathrow and the views of the Heathrow Transport
Forum are to be sought in determining any scheme to be funded. See update to
PT/05/04a above regarding the remainder of the balance. No time limits.
PT/11/45 Harefield Springwell Lane - Cycle Way /
6679/AZ/98/0897
3,283.20 3,283.20 2,121.57 2,121.57 0.00 1,161.63 0.00 Towards traffic calming in Springwell Lane. Funds earmarked/ committed towards
traffic calming to benefit a cycle way. Delegated authority granted to advertise for
20m/hr speed zone. Works complete. Officers chasing confirmation of final s106
expenditure amount. Interest accrued. Unexpended funds at January 2011 to be
returned to the owner.
PT/18/38B
(See also E/25/38A)
*33
Heathrow
Villages
Former Airspeed House, Stanwell
Road, Heathrow / 50395/A97/1297
138,068.30 138,068.30 62,912.71 62,912.71 0.00 75,155.59 0.00 For Public Transport Improvements (2 bus shelters & pedestrian crossing) Bus
shelters and pedestrian crossing installed & funded by another authority/agency.
Two alternative bus shelters provided by London Buses and LB Hounslow. S106
funds are not required. No other schemes required in accordance with terms for
spend. Officers investigating options to pusue alternative scheme. Decision being
sought as to way forward. Interest accrued. There are no time constraints upon the
expenditure of the funds. Original scheme implemented & paid for from other funds.
Balance allocated to another highway scheme.
PT/21/39A Uxbridge
North
The Chimes - Supervision & TTS /
42966/AH/961862
112,591.63 112,591.63 110,426.22 110,426.22 0.00 2,165.41 0.00 £63,484.80 received for traffic signals - £62,591.63 has been paid, leaving £893.17
unspent for this purpose. £2,165.41 for engineering fees. Trees planted in the High
Street near the Sony Shop but wrong species planted by developer's contractor. This
issue prevented the Final Certificate being issued. The remaining supervision funds
(£2,165.41) are earmarked for final inspection/ supervision. Trees planted and
establishment period expired Spring 2008. £893.17 has been refunded and any
remaining supervision and administration fee to be transferred to PT/44/03.
PT/24/55
(see E/08)
*28
Pinkwell Former Arlington Hotel, Shepiston
Lane, Harlington - Highway Works
382/BH/97/0714
23,639.34 23,639.34 0.00 0.00 0.00 23,639.34 0.00 Highway Improvement Works according to the 3rd Schedule of the agreement
(13.141K). Excess funds are to be refunded to the developer following the date of the
Final Account. Conflict between works specified in agreement and works required in
association with application for Harlington Community School Sports Centre (see
PT278/51). Works (to right hand turn lane) have been carried out as part of the
Harlington Community School development. Reasonable time for spend has elapsed.
Officers investigating options to pursue possible deed of gift for alternative scheme.
PT/25/56
*24
South Ruislip J Sainsbury, 11 Long Drive, Ruislip
33667/T/97/0684
37,425.09 37,425.09 0.00 0.00 0.00 37,425.09 0.00 Highway improvements adjacent to the site. Legal advice stated that because of time
that has elapsed, it would not be reasonable to proceed without Sainsbury's
agreement. Officers investigating the potential to utilise these funds for traffic
congestion mitigation at that junction to complement current works that have been
commissioned for that location. A portion of land owned by Sainsbury's would need to
be dedicated as public highway for the scheme to be feasible. Traffic congestion
mitigation scheme is fully funded. Officers investigating whether improvements could
be tied into 114 bus route project. Excess funds are to be refunded to the developer
following the date of the Final Account.
FINANCIAL UPDATE ON SECTION 106 AND 278 AGREEMENTS AT 31 MARCH 2010 APPENDIX 1
CASE REF. WARD SCHEME / PLANNING
REFERENCE
TOTAL INCOME TOTAL INCOME TOTAL
EXPENDITURE
TOTAL
EXPENDITURE
2009 / 2010
EXPENDITURE
BALANCE OF
FUNDS
BALANCE
SPENDABLE
NOT
ALLOCATED
COMMENTS
(as at mid May 2010)
AS AT 31/ 3/10 AS AT 31/12/09 AS AT 31/ 3/10 AS AT 31/12/10 To 31/ 3/10 AS AT 31/ 3/10 AS AT 31/ 3/10
PT/37/40B-C
*53
(see: PPR/29)
Botwell Land at Thorn EMI Complex -
Highways Works & Environmental
Improvements
51588/APP/2000/366&1418
559,443.43 559,443.43 372,015.36 372,015.36 0.00 187,428.07 0.00 Project 40B- Environmental improvements in Blyth Road. Funds committed to
highways works on Blyth Road and subway CCTV. Unspent funds at 6 months of
occupation to be refunded. Ongoing discussions with developers.
Project 40C- Council’s costs in the implementation, and supervision & administration
fees related to the highway works. Unspent funds following final account to be
refunded. Awaiting developer regarding implementation of phase 3 highways works.
PT37/40E
*47
Botwell Land at Thorn EMI Complex -
Parking
51588/APP/2000/366&1418
32,805.42 32,805.42 0.00 0.00 0.00 32,805.42 0.00 Project 40E - £30,000 received for controlled parking in Blyth Road area. There are
no immediate plans to consult with the residents of the area around Blyth Road on
the introduction of a residents parking scheme. These funds may be required to
address additional parking pressure on the surrounding residential roads once the
development has been completed and is fully occupied. Officers continue to monitor
the parking situation. Unspent to be refunded 5 years following implementation (date
yet to be confirmed).
PT/37/40F Botwell Land at Thorn EMI Complex.
51588/APP/2000/366&1418
100,000.00 100,000.00 0.00 0.00 0.00 100,000.00 0.00 Funds received towards the funding of environmental improvements in Dawley Road
(to include pedestrian safety). Unspent funds to be returned within 5 years of
implementation (Jan 2013). Funds allocated towards scheme of improvements
(Cabinet Member decision 19/2/10)
PT/41/94A
(See also E/29)
*19
Yiewsley Land to the West of Stone Close,
Horton Road, Yiewsley /
54822/APP/2000/424 (outline)
9,794.97 9,794.97 0.00 0.00 0.00 9,794.97 0.00 £8,333.34 received on 17 February 2003 as a capital contribution towards improved
public transportation in the area of Yiewsley. £934.14 is interest accrued. If planning
permission is implemented within 5 years of the grant there are no time constraints
on the spend. Planning permission yet to be implemented. Officers investigating
whether funds should be returned considering planning permission has expired.
PT/41/94B Yiewsley Land to the West of Stone Close,
Horton Road, Yiewsley
54822/APP/2003/718 (full)
4,922.23 4,922.23 4,922.23 0.00 4,922.23 0.00 0.00 Received as a contribution towards public transport initiatives in the Borough.
Officers have investigated findings of a freight study in Horton Road but are unable
to use funds.TfL have been notified of availability of funds. Unspent funds by 17
February 2010 to be returned. Funds now earmarked for transport initiatives
associated with Yiewsley/ West Drayton Town Centre improvements. Scheme began
on site Feb 2010 (see PPR26/84).
PT/41/94C
*19
Yiewsley Land to the West of Stone Close,
Horton Road, Yiewsley /
54822/APP/2000/424 (outline)
5,883.03 5,883.03 0.00 0.00 0.00 5,883.03 0.00 Received as a contribution towards planting and offsite maintenance of landscaping
on the 'Landscaping Land'. If planning permission is implemented within 5 years of
the grant there are no time constraints on the expenditure of funds. Planning
permission yet to be implemented. Officers investigating whether funds should be
returned considering planning permission has expired.
PT/42/41 Heathrow
Villages
Temp Stockpiling at Bedfont Court.
47853/SPP/2003/113
50,000.00 50,000.00 0.00 0.00 0.00 50,000.00 0.00 £50,000 for landscape enhancement on specified land around the development.
Unexpended funds at 19 June 2006 were to be repaid to the developer. Following
consultations with BAA it has been agreed to spend the funds as part of the Colne
Valley project. Deed of variation has been secured to remove time limits.
PT/44/03 Various S278 Surplus
157,291.81 157,291.81 85,933.82 85,933.82 0.00 71,357.99 0.00 Income is from underspends on s278 projects where surplus funds do not have to be
refunded. First priority for use of funds is to address otherwise irresolvable deficits
from overspent projects. £322.14 income from PT278/26/127 has been transferred
back. A further £1,391.64 transferred to reconcile overspend on PT278/26/127.
£1,945.35 used towards zebra crossing scheme at PT/105/175B.
PT/54/21C Botwell Former EMI Site, Dawley Road -
Landscaping 6198/BS/98/1343
57,000.00 57,000.00 0.00 0.00 0.00 57,000.00 0.00 £50,000 for Landscaping on adjacent land and £7,000 for maintenance of the
landscaping works. Funds to be held for landscaping in accordance with the
agreement subject to Crossrail. No time constraints.
FINANCIAL UPDATE ON SECTION 106 AND 278 AGREEMENTS AT 31 MARCH 2010 APPENDIX 1
CASE REF. WARD SCHEME / PLANNING
REFERENCE
TOTAL INCOME TOTAL INCOME TOTAL
EXPENDITURE
TOTAL
EXPENDITURE
2009 / 2010
EXPENDITURE
BALANCE OF
FUNDS
BALANCE
SPENDABLE
NOT
ALLOCATED
COMMENTS
(as at mid May 2010)
AS AT 31/ 3/10 AS AT 31/12/09 AS AT 31/ 3/10 AS AT 31/12/10 To 31/ 3/10 AS AT 31/ 3/10 AS AT 31/ 3/10
PT/54/21D Botwell Former EMI Site, Dawley Road -
HGV Signage 6198/BS/98/1343
39,738.91 39,738.91 35,931.70 35,931.70 2,261.66 3,807.21 0.00 £15,000 for HGV signage in the area - officers working towards developing a
scheme. Officers have carried out a Freight Audit of the area and secured funding
from TfL for HGV route signs. Subject to Cabinet Member approval, the £ 15,000 to
be pooled with TfL funding to implement a comprehensive HGV route signage
scheme. Directional signage scheme approved and officers implementing the
scheme in accordance with the £15k allocation. No time constraints. Scheme
implemented Jan 09. Spend towards design and implementation of new signage.
PT/57/27C
(see: EYL/35 & E/18)
South Ruislip Carmichael Close, Ruislip -
Highway Works /
55898/APP/2000/2736
1,371.00 1,371.00 1,371.00 1,371.00 0.00 0.00 0.00 For highway improvements including a temporary waiting scheme. Designs received
from HEC - currently looking at feasibility. Unexpended funds after 5 years of the
sale/renting of the last housing unit (30 July 2008) to be repaid to the developer. No
progress due to uncertainties associated with proposed development at RAF
Northolt. RAF Northolt application approved which if implemented will include these
highways works enabling these funds to be returned. Interest accrued. Expenditure is
on HEC designs. TfL have requested revisions. Revised detailed design for the new
signalised junction agreed. Officers to seek an alternative scheme to be the basis
for a gift funding request if appropriate . Request declined, funds including interest
returned.
PT/61/89B
(see: E/35)
West Drayton LHR Training Centre, Stockley
Close / 51458/97/1537
25,000.00 25,000.00 0.00 0.00 0.00 25,000.00 0.00 £25,000 for improvements at the junction of Stockley Road & Stockley Close /
Lavender Rise, West Drayton. Scheme provided using TfL funding. Further
improvements to area have been implemented as part of the MOD development.
Funds to be held as contingency for any works required to the junction arising out of
the MOD development. No time constraints.
PT/65/74A
(see EYL/40, E/20 &
E/21)
Uxbridge
North
Land at Johnson's Yard (former
garage site), Redford Way,
Uxbridge - Street Lighting
53936/APP/2002/1357
18,893.88 18,893.88 17,871.38 17,871.38 0.00 1,022.50 0.00 Street lighting according to the agreement drawing. No time constraints. Expenditure
due to commencement of project for street lighting on Redford Way at Johnson's
Yard. Columns & lanterns installed and working. Unable to install column in footpath
leading to the high Street. Last column installed, Connection by Southern Electric
were programmed for July 07. Columns all connected but require painting. Officers
chasing painting contractor to progress. Painting completed - final invoices paid.
Final balance to be confirmed after closure of 08/09 financial year accounts.
PT/68/96A Uxbridge
North
Land at Sanderson Site and
Braybourn - Tramway feasibility,
resident parking scheme /
35347/APP/2000/1294 & 1296
43,481.32 43,481.32 24,991.85 24,991.85 0.00 18,489.47 0.00 £80k received for feasibility work to be carried out into the possible provision of a
tramway, increased restrictions in favour of residential car parking, other relevant
transport initiatives, and associated training initiatives (40k transferred to PPR/30 for
Stockley Academy Adult Training Scheme). Funds were spent on the extension of
Uxbridge North Parking Management Area which has been completed. Balance
allocated towards Uxbridge Station access improvements. No time constraints.
Funds now earmarked towards improvements to Bakers Yard, pending a review by
TfL.
PT/71/99 Uxbridge
South
UB1 Vine Street Uxbridge
11005/AG/97/360
250,000.00 250,000.00 248,521.47 237,552.88 88,604.74 1,478.53 0.00 To facilitate enhancements of the Old Uxbridge Conservation Area and the Town
Centre - committed to Windsor Street scheme. Consultations undertaken. High St
works programmed to be implemented late 2006 - complete. Further consultations
for Windsor Street, Granges Yard and Market Square completed and Cabinet
Member approval received for scheme to include resurfacing, plaques, signage and
parking.
Works programmed for summer 09/10 financial year to spend this balance
and the balance at PT/96/164. No time constraints. Scheme in progress: phase 1
completed November 09. Phase 2 completed March 2010. Minor works
outstanding.
FINANCIAL UPDATE ON SECTION 106 AND 278 AGREEMENTS AT 31 MARCH 2010 APPENDIX 1
CASE REF. WARD SCHEME / PLANNING
REFERENCE
TOTAL INCOME TOTAL INCOME TOTAL
EXPENDITURE
TOTAL
EXPENDITURE
2009 / 2010
EXPENDITURE
BALANCE OF
FUNDS
BALANCE
SPENDABLE
NOT
ALLOCATED
COMMENTS
(as at mid May 2010)
AS AT 31/ 3/10 AS AT 31/12/09 AS AT 31/ 3/10 AS AT 31/12/10 To 31/ 3/10 AS AT 31/ 3/10 AS AT 31/ 3/10
PT/76/119 Northwood Land at 64 Ducks Hill Road
Northwood/ 26900L/99/1077
35,253.56 35,253.56 4,597.00 1,097.00 4,060.00 30,656.56 0.00 To provide a speed camera, anti-skid surface and associated road markings in
Ducks Hill Road. Speed camera cannot be installed in this location, as the accident
rate in this location is below the threshold established by TfL. Deed of variation not
required. Site included in vehicle activated sign (VAS) forward programme. Officers
looking into feasibility of 'Driver Feedback Sign'. Implementation due Spring 2007,
subject to feasibility. Quotes being sought with the view to possible purchase of
signs. Interest accrued. No time constraints. Utilities works completed Nov 08. Anti-
skid can be implemented following 3 months after completion of utilities works.
Scheme programmed for implementation April/May 2010. Spend towards the
provision of anti skid.
PT/77/123 Yeading Grand Union Village, Ruislip Road,
Southall/ 327/APP/2000/2106
51,036.05 51,036.05 51,036.05 51,036.05 39,265.30 0.00 0.00 Public transport or highways improvements which relate to the development in the
surrounding area. Allocated for highways works in the area (priority to Teardrop
Roundabout improvements). Following liaison with the Ward Councillor and local
residents, some amended proposals have been tabled by residents and further
investigations were undertaken. A scheme has been agreed in principle with the
Ward Councillors and the Residents’ Association and this will be reviewed with the
Cabinet Member to seek his approval. Work completed July 2008. Scheme
complete, remaining funds allocated to programme of highway improvements in
vicinity of Broadmead Road. Funds unspent as at 13 October 2009 to be refunded.
Scheme completed September 09.
PT/78/10B
(See also PT278/55)
Uxbridge
North
Land at Sanderson Site and
Braybourn / 35347/APP/2000/1294
& 1296
27,986.49 27,986.49 22,458.80 20,990.65 20,603.80 5,527.69 0.00 £25K received November 2004 for Part B Highways Works to be undertaken by
Council and consisting of improvements at junction of Sanderson and Oxford Roads.
Preliminary designs have been drawn. Preliminary estimates have been provided.
TfL have appointed a consultant through their bus route flagship programme to
investigate the system of nodes at Mahjacks, Cedars and Sanderson Road & Oxford
Road. Draft report received. Still await final report. TfL to programme implementation
following receipt of the final report. Due to the approaching deadline for spend
officers looking into any elements that could be addressed at an early stage.
Discussions with TfL continuing. Interest accrued. Funds not spent by November
2009 to be returned to developer. Works completed October 09. Awaiting financial
completion.
PT/80/112 (formerly
PT278/05)
Uxbridge
South
Grand Union Park, Packet Boat
Lane, site ref: 1197 (various
applications)
47,774.85 47,774.85 2,228.56 2,228.56 0.00 45,546.29 0.00 No time constraints. Officers looking into project for spend of balance at junction of
Packet Boat Lane & Cowley High Street. Cabinet Member for P&T concerned with
affect of proposal and blind road bend heading towards Uxbridge. Funds to be held
until sight lines are resolved.
PT/82/114 (formerly
PT278/23)
Uxbridge
South
Waterloo Road, Uxbridge -
Highway Works / 332BD/99/2069
13,169.44 13,169.44 11,577.00 11,577.00 0.00 1,592.44 0.00 Highway Works for alternative traffic management on Waterloo Road. No time limits.
Cabinet Member for Planning & Transportation has approved use of funds to extend
the Uxbridge South Parking Management Scheme approved. Implementation
occurred in the Autumn. £11k spend on Waterloo Road from the Parking Revenue
Account to be recharged to this case for next quarter. Recharcharge completed.
PT84/87B-D
(Formerly part of
PT278/44)
Brunel Brunel s106 16 April 04
532/SPP/2002/2237
27,596.36 14,795.29 2,345.30 1,760.00 585.30 25,251.06 0.00 £3,000 + interest for monitoring of landscape management plan (87B), £10,000 +
interest for monitoring of green travel and public transport obligations (87D), and
£200 + interest initial payment associated with footpath works to be undertaken by
Council (87C). Engineers inspected site to ascertain whether works are required &
whether further payments are due late Jan 2006. Officers chasing Brunel to provide a
disabled ramp from the back of the privately owned footway at Hillingdon Hill. Interest
accrued. £10k plus interest received for improvements (including lighting) to the
footpath alongside the River Pinn linking 'Site 2' to Uxbridge Road transferred
from PT278/44 and held as security for Brunel to implement the footpath works
as above. Spend towards monitoring Landscape management Plan.
FINANCIAL UPDATE ON SECTION 106 AND 278 AGREEMENTS AT 31 MARCH 2010 APPENDIX 1
CASE REF. WARD SCHEME / PLANNING
REFERENCE
TOTAL INCOME TOTAL INCOME TOTAL
EXPENDITURE
TOTAL
EXPENDITURE
2009 / 2010
EXPENDITURE
BALANCE OF
FUNDS
BALANCE
SPENDABLE
NOT
ALLOCATED
COMMENTS
(as at mid May 2010)
AS AT 31/ 3/10 AS AT 31/12/09 AS AT 31/ 3/10 AS AT 31/12/10 To 31/ 3/10 AS AT 31/ 3/10 AS AT 31/ 3/10
PT/88/140 B Pinkwell MOD Records Office, Stockley
Road, Hayes - Offsite Footpath
18399/APP/2004/2284
3,207.23 3,207.23 0.00 0.00 0.00 3,207.23 0.00 £3,000 is the of-site public footpath contribution for the provision of a footpath in the
location specified in the legal agreement. Work to commence following completion
of construction phase of the development which is underway. Unspent funds to be
repaid following 7 years of receipt (i.e. 14 October 2012).
PT/88/140C *38 Pinkwell MOD Records Office, Stockley
Road, Hayes - Public Transport
18399/APP/2004/2284
754,743.82 754,743.82 2,392.75 2,392.75 0.00 752,351.07 0.00 Funds received as first and second instalments (plus indexation payment) of the
public transport contribution to enhance the level of public transport to and from the
area of the development site. Discussions with TfL expected in Spring regarding bus
route funding. TfL has been approached with regard to extending the U4 bus route.
TfL has advised that if feasible a scheme could be implemented once development
of the housing units are complete and estate roads are adopted expected in 9
months time. Double yellow lines required for bus route through site .
TMO
approved.TfL in consultation with developer regarding location of bus shelter.
Unspent funds to be repaid following 7 years of receipt (I.e. 14 October 2012 for 1st
instalment,19 March 2014 for the 2nd instalment and 30 April 2015 for the 3rd
instalment). All funds now received. Spend this quarter towards fees and executing
TMO.
PT/88/140F
*46
Pinkwell MOD Records Office, Stockley
Road, Hayes - Parking
18399/APP/2004/2284
73,774.40 73,774.40 0.00 0.00 0.00 73,774.40 0.00 Funds received for parking management system in Bourne Avenue and surrounding
streets of the new and existing estate roads utilised within the residential part of the
development. There are currently no plans to consult with residents of the area on a
Parking Management Scheme. However, any resident objections to increases in
commuter parking on residential roads generated by the MOD development may give
reason to spend these funds. Officers continue to monitor the parking situation.
Funds must be spent within 7 years following date of receipt i.e. 11/12/2013.
PT/91/142A Northwood 3 Reginald Road, Northwood
58866/APP/2005/1087
1,049.35 1,049.35 0.00 0.00 0.00 1,049.35 0.00 For the introduction and maintenance of white lines on the highway adjacent to the
development. Funds not spent within 7 years of receipt of PO1 Form to be refunded.
Scheme completed and final invoices received . Expenditure charged to non-s106
code. Officers investigating whether spend can be recharged.
PT/92/154 Pinkwell 5, 7, 7a & 10 Westlands Industrial
Estate 1902/APP/2005/2370
41,527.00 41,527.00 0.00 0.00 0.00 41,527.00 0.00 Funds received for cycle network improvements. Cycleway and local safety scheme
identified for the junction of Station Road and North Hyde Road. Entire scheme now
to be funded TfL. Officers looking into alternative options. Interest bearing account,
funds must be spent within 7 years following date of receipt i.e. 06/12/2013.
PT/93/147C West Drayton DERA Site, Kingston Lane, West
Drayton - Traffic Calming
45658/APP/2002/3012
20,660.46 20,660.46 0.00 0.00 0.00 20,660.46 0.00 To be applied towards traffic calming measures in Kingston Lane. Traffic calming
measures are already in place in Kingston Lane. Officers are investigating options for
spend within the terms of the legal agreement in combination with funds at
PT/93/147D. Funds not spent by 19 February 2014 are to be refunded.
PT/93/147D West Drayton DERA Site, Kingston Lane, West
Drayton - Cycle Network
45658/APP/2002/3012
33,056.72 33,056.72 0.00 0.00 0.00 33,056.72 0.00 To be applied towards the cycle improvements for the London Cycle Network
including such works for the Heathrow to Hillingdon Hill cycle way adjacent to the
Land. Officers are investigating options for spend within the terms of the legal
agreement in combination with funds at PT/93/147C. Funds not spent by 19 February
2014 are to be refunded.
PT/95/161A West Drayton Former Honeywell Site, Trout Road,
West Drayton - Footpath
335/APP/2002/2754
18,155.95 18,155.95 0.00 0.00 0.00 18,155.95 0.00 To be applied towards the provision of a footpath from the site crossing over the
Grand Union Canal along Trout Road to the High Street. Unexpended funds after 7
years of receipt (31 January 2014) are to be refunded including interest. Funds to be
held until outcome of Tesco site determined.
PT/96/164 Uxbridge
South
36-38 Windsor Street (Westcombe
House), Uxbridge
13544/APP/2005/31
10,516.65 10,516.65 3,753.58 3,753.58 0.00 6,763.07 0.00 For environmental enhancement on Windsor Street and the surrounding area. Funds
not spent by 1 April 2014 are to be refunded. See updates on PT/71/99. Spend
towards purchase of benches and information boards.
FINANCIAL UPDATE ON SECTION 106 AND 278 AGREEMENTS AT 31 MARCH 2010 APPENDIX 1
CASE REF. WARD SCHEME / PLANNING
REFERENCE
TOTAL INCOME TOTAL INCOME TOTAL
EXPENDITURE
TOTAL
EXPENDITURE
2009 / 2010
EXPENDITURE
BALANCE OF
FUNDS
BALANCE
SPENDABLE
NOT
ALLOCATED
COMMENTS
(as at mid May 2010)
AS AT 31/ 3/10 AS AT 31/12/09 AS AT 31/ 3/10 AS AT 31/12/10 To 31/ 3/10 AS AT 31/ 3/10 AS AT 31/ 3/10
PT/97/169A Uxbridge
South
Colham House Taxi Rank
Relocation 27298/APP/2006/875
15,000.00 15,000.00 6,038.40 6,038.40 6,038.40 8,961.60 0.00 Funds received for the relocation of the black cab taxi rank from Bakers Yard.
Alternative taxi rank proposal advertised in the London Gazette. Cabinet Member
report prepared to consider merits of implementing proposal.Taxi rank relocation
agreed for implementation (Cabinet Member approval received July 2008). Taxi rank
changes implemented July 09. Funds not spent by July 2012 are to be returned.
PT/98/169B Uxbridge
South
Colham House Footpath Re-Paving
27298/APP/2006/875
40,000.00 40,000.00 0.00 0.00 0.00 40,000.00 0.00 Funds received for footpath repaving within the immediate vicinity of the site. Funds
not spent by July 2012 are to be returned. Officers looking into scheme of
improvements for Bakers Yard.
PT/99/169C Uxbridge
South
Colham House Kerb Alignment
27298/APP/2006/875
5,000.00 5,000.00 0.00 0.00 0.00 5,000.00 0.00 Funds received for the kerb realignment within the immediate vicinity of the site.
Funds not spent by July 2012 are to be returned. Officers looking into a scheme of
improvements in Bakers Yard.
PT/100/169D Uxbridge
South
Colham House Side Alley Re-
surfacing 27298/APP/2006/875
10,000.00 10,000.00 0.00 0.00 0.00 10,000.00 0.00 Funds received for the resurfacing of the side alley located immediately adjoining the
site. Funds not spent by July 2012 are to be returned. Officers looking to include
funding as part of a scheme of improvements for Bakers Yard .
PT/101/170A Uxbridge
South
11 - 21 Clayton Road, Hayes
56840/APP/2004/630
30,527.21 30,527.21 0.00 0.00 0.00 30,527.21 0.00 Funds received for parking management in the area. Funds held to be used in
combination with those at case ref. PT/37/40E should any scheme be required.
Funds not spent by 31 August 2014 are to be refunded.
PT/102/161D Yiewsley Honeywell Site, Trout Road
Yiewsley 335/APP/2002/2754
154,302.99 154,302.99 0.00 0.00 0.00 154,302.99 154,302.99 Funds received for public transport and community facilities initiatives. Funds not
spent by 20 September 2014 are to be repaid.
PT/103/174A Heathrow
Villages
Terminal 2, Heathrow
62360/APP/2006/2942
100,000.00 100,000.00 0.00 0.00 0.00 100,000.00 0.00 Funds received for the West Drayton to Heathrow Cycle Scheme. Funds not spent
by 16 November 2015 are to be repaid.
PT/104/147H West Drayton DERA Site, Kingston Lane, West
Drayton
45658/APP/2002/3012
10,000.00 10,000.00 0.00 0.00 0.00 10,000.00 0.00 Funds received for the installation and maintenance of CCTV cameras on the site as
specified in the relevant planning permission. Cameras to be installed by the
developer. Funds to be retained as security. No time constraints.
PT/106/149E Hayes Hayes Goods Yard
10057/APP/2005/2996 & 2999
119,402.15 119,402.15 0.00 0.00 0.00 119,402.15 0.00 Funds received towards enhancements to the London Cycle Network, route 88A or
any other cycle route that is likely to be used by the occupiers of the development.
Funds to be spent by Oct 2015.
PT/107/149F Hayes Hayes Goods Yard
10057/APP/2005/2996 & 2999
132,209.06 132,209.06 132,209.00 0.00 132,209.00 0.06 0.00 Funds received for improvements to pedestrian & cycleway linkages between the site
& Botwell Green, or environmental improvements to Botwell Green as agreed with the
owner. Funds must be spent or returned by Oct 2015. Officers looking into whether
any schemes at Botwell Green can utilise these funds in conjuction with funds held at
CSL/3/140I. Funds allocated to the construction of a new footpath link at Botwell
Green (Cabinet Member decision 21/10/09).Scheme complete March 2010.
PT/108/155E West Drayton Former RAF Porters, West Drayton.
5107/APP/2005/2082
1,000.00 1,000.00 0.00 0.00 0.00 1,000.00 0.00 Funds received to provide a local walking bus scheme. Funds to be spent within 3
years of receipt (Jan 2012)
PT/109/194A Uxbridge Frays Adult Education Centre,
Harefield Road, Uxbridge.
18732/APP/2006/1217
10,000.00 10,000.00 0.00 0.00 0.00 10,000.00 0.00 Funds received towards street lighting in the vicinity of the site. No time limits. Funds
earmarked towards a lighting scheme for the public footpath which runs adjacent to
the site.
PT/110/198B *61 Uxbridge Former Gas Works Site (Kier Park)
at Cowley Mill Road, Uxbridge
3114/APP/2008/2497
14,240.00 14,240.00 0.00 0.00 0.00 14,240.00 0.00 Travel Plan Bond received to ensure compliance by the owner for monitoring and
reporting in accordance with the travel plan. To be refunded after 10 years.
PT/111/204A *63 Uxbridge 106, Oxford Road, Uxbridge.
26198/APP/2008/2338
20,000.00 20,000.00 0.00 0.00 0.00 20,000.00 0.00 Travel Plan Bond received to ensure compliance by the tennant of its monitoring and
reporting obligations in accordance with the travel plan. Returnable.
PT/112/204A Eastcote RAF Eastcote, Lime Grove, Ruislip.
10189/APP/2004/1781
7,502.15 7,502.15 0.00 0.00 0.00 7,502.15 0.00 Contribution towards improvements to the London cycle network within a radius of
1500m of the site. Funds to be spent by September 2013
FINANCIAL UPDATE ON SECTION 106 AND 278 AGREEMENTS AT 31 MARCH 2010 APPENDIX 1
CASE REF. WARD SCHEME / PLANNING
REFERENCE
TOTAL INCOME TOTAL INCOME TOTAL
EXPENDITURE
TOTAL
EXPENDITURE
2009 / 2010
EXPENDITURE
BALANCE OF
FUNDS
BALANCE
SPENDABLE
NOT
ALLOCATED
COMMENTS
(as at mid May 2010)
AS AT 31/ 3/10 AS AT 31/12/09 AS AT 31/ 3/10 AS AT 31/12/10 To 31/ 3/10 AS AT 31/ 3/10 AS AT 31/ 3/10
PT/113/198C Uxbridge Former Gas Works Site (Kier Park)
at Cowley Mill Road, Uxbridge
3114/APP/2008/2497
24,410.43 24,410.43 0.00 0.00 0.00 24,410.43 24,410.43 Contribution towards the provision of public transport improvements in the vicinity of
the land. Funds to be spent within 7 years of receipt (Nov 2016).
PT/114/209A
*67
Yiewsley Tesco, Trout Road, Yiewsley.
60929/APP/2007/3744
25,000.00 0.00 0.00 0.00 0.00 25,000.00 0.00 Travel Plan Bond received to ensure compliance by the owner for monitoring
and reporting in accordance with the Travel Plan. To be refunded five years
following first occupation.
PT/115/209B Yiewsley Tesco, Trout Road, Yiewsley.
60929/APP/2007/3744
4,850.00 0.00 0.00 0.00 0.00 4,850.00 0.00 Contribution received for the purpose of the purpose of setting up a car club.
Funds to be spent within 5 years of receipt (March 2013).
PT/116/210A Hayes Hayes Stadium, Judge Heath
Lane, Hayes.
49996/APP/2008/3561
30,000.00 0.00 0.00 0.00 0.00 30,000.00 0.00 Contribution received towards the cost of upgrading two bus shelters in the
vicinity of the development. Funds to be spent witihn 5 years of receipt (March
2015).
PLANNING &
TRANSPORTATION SUB -
TOTAL
4,329,028.53 4,256,377.46 1,379,301.10 1,225,647.83 298,550.43 2,949,727.43 178,713.42
PLANNING &
TRANSPORTATION TOTAL
6,451,184.31 6,354,750.26 2,121,709.60 1,966,309.93 372,258.72 4,329,474.71 178,713.42
PORTFOLIO: CULTURE, SPORT AND LEISURE
CSL/1/13
(formerly EYL/15/13)
Townfield Sainsbury-Minet D. /
40601H/91/1970
1,433,000.00 1,433,000.00 1,432,700.15 1,432,700.15 0.00 299.85 0.00 The balance is committed to providing secure parking and perimeter fencing at Minet
Country Park in accordance with the agreement. Work undertaken in parallel with
Goals 5 a side development. Work complete. Funds allocated to gating on perimeter
fencing. There are no time constraints for expenditure. Remaining funds spent
towards movable barriers. Awaiting financial completion.
CSL/2/147E West Drayton DERA Site, Kingston Lane, West
Drayton - Community Facility
45658/APP/2002/3012
94,015.15 94,015.15 53,830.08 0.00 53,830.08 40,185.07 0.00 To be applied towards communal facility improvements in the West Drayton area and
which will benefit the occupiers of the Development. £151,786.77 transferred to
EYL/77/147F as they were received for school places and were originally allocated to
this case reference erroneously. Funds not spent by 19 February 2014 are to be
refunded. Officers looking to commit these funds to the West Drayton Youth Centre
expansion. Funds allocated to the "Skidz " project at West Drayton Young People's
Centre (Cabinet Member decision 21/10/09). Phase 1 complete. Phases 2 & 3
programmed for summer 2010.
CSL/3/140I Pinkwell MOD Records Office Stockley
Road/Bourne Avenue, Hayes
18399/APP/2004/2284
69,189.85 69,189.85 69,189.85 0.00 69,189.85 0.00 0.00 To be applied towards the provision or improvement of community facilities (but not
including open space and recreation facilities) at Botwell Green and/or any other
location within the area of the Development. Officers looking into whether any
schemes at Botwell Green could potentially draw upon these funds. Unspent funds to
be repaid following 7 years of receipt (i.e. 3 January 2014) including interest. Funds
allocated to the construction of the new Community Leisure Centre at Botwell Green.
(Cabinet Member decision 21/10/09). Works complete, new centre due to open 1st
June 2010.
CSL/4/152A
(Formerly: PPR/35)
Brunel Middlesex Lodge, 189 Harlington
Road, Hillingdon
12484/APP/2005/1791
20,629.80 20,629.80 20,629.80 0.00 20,629.80 0.00 0.00 Funds received to provide for Community Facilities that are likely to be used by
residents of the development. No time constraints on the expenditure of funds.
Funds allocated to the construction of the new Community Leisure Centre at Botwell
Green (Cabinet Member decision 21/12/09). Works complete, new centre due to
open 1st June 2010.
CSL/5/184A West Ruislip 31-46, Pembroke Road, Ruislip
59816/APP/2006/2896
49,601.53 49,601.53 0.00 0.00 0.00 49,601.53 0.00 Funds have been allocated to the dining centre for Northwood and Ruislip elderly
persons association. Funds not spent by 1/07/2015 to be returned.
CSL/6/189A Ruislip 30 Kings End, Ruislip.
46299/APP/2006/2165
7,674.48 7,674.48 0.00 0.00 0.00 7,674.48 0.00 Towards the provision of community facilities in the immediate vicinity of the land. No
time limits. Earmarked towards Manor Farm Library. Subject to formal allocation of
funding.
CSL/7/195A Ruislip Highgrove House, Eastcote Road,
Ruislip. 10622/APP/2006/2494
9,578.00 9,578.00 0.00 0.00 0.00 9,578.00 9,578.00 Funds received towards the improvement of community facilities in the vicinity of the
site. No time constraints on the expenditure of funds.
CSL/8/194B Uxbridge Frays Adult Education Centre,
Harefield Road, Uxbridge.
18732/APP/2006/1217
24,050.00 24,050.00 24,050.00 0.00 24,050.00 0.00 0.00 Funds received towards the provision of community facilities in the Borough. No time
constraints. Funds allocated towards the construction of the new Community Leisure
Centre at Botwell Green. (Cabinet Member decision 21/12/09). Works complete,
new centre due to open 1st June 2010.
FINANCIAL UPDATE ON SECTION 106 AND 278 AGREEMENTS AT 31 MARCH 2010 APPENDIX 1
CASE REF. WARD SCHEME / PLANNING
REFERENCE
TOTAL INCOME TOTAL INCOME TOTAL
EXPENDITURE
TOTAL
EXPENDITURE
2009 / 2010
EXPENDITURE
BALANCE OF
FUNDS
BALANCE
SPENDABLE
NOT
ALLOCATED
COMMENTS
(as at mid May 2010)
AS AT 31/ 3/10 AS AT 31/12/09 AS AT 31/ 3/10 AS AT 31/12/10 To 31/ 3/10 AS AT 31/ 3/10 AS AT 31/ 3/10
CSL/9/199A Ruislip 41, Kingsend, Ruislip.
2792/APP/2006/3451
9,338.43 9,338.43 0.00 0.00 0.00 9,338.43 0.00 Funds received towards the provision of community facilities in the Borough. No time
constraints. Earmarked towards Manor Farm Library. Subject to formal allocation of
funding.
CSL/10/200B Manor Former Ruislip Manor Library,
Victoria Road, Ruislip.
14539/APP/2008/2102
5,200.00 5,200.00 0.00 0.00 0.00 5,200.00 0.00 Funds received towards improvements to neary by community facilities. Earmarked
towards Ruislip Manor Library and Community Resources Centre. Subject to formal
allocation of funding.
CSL/11/205B Eastcote RAF Eastcote, Lime Grove, Ruislip.
10189/APP/2004/1781
277,131.54 277,131.54 0.00 0.00 0.00 277,131.54 0.00 Contribution towards the provision or improvement of leisure, youth and/or cultural
services within Eascote and East Ruislip ward boundary. Funds to be spent by
September 2014. Earmarked towards Highgrove pool improvement programme.
Subject to formal allocation of funds.
CULTURE, SPORT AND
LEISURE SUB - TOTAL
1,999,408.78 1,999,408.78 1,600,399.88 1,432,700.15 167,699.73 399,008.90 9,578.00
PORTFOLIO: EDUCATION AND CHILDREN'S SERVICES
EYL/14/75 Heathrow
Villages
Land at 78-84 The Crescent,
Harlington / 46970/APP/1999/2169
21,972.07 21,972.07 21,639.90 21,639.90 0.00 332.17 0.00 Interest accrued. Allocated to Pinkwell Primary School expansion: feasibility study
commissioned. No time constraints. Expenditure of £21,639.90 will be recharged out
of s106 for closure of 08/09 Financial Year as these project costs should have been
met from school modernisation funds.
EYL/19/44 Harefield The Springs, Springwell Lane,
Rickmansworth / 6679/AZ/98/0897
32,595.93 32,595.93 32,595.93 0.00 32,595.93 0.00 0.00 Towards the provision of primary school places in Harefield. Earmarked for a nursery
scheme at Harefield Infants School. Interest accrued. Unexpended funds by January
2011 to be repaid to the developer. Funds spent towards Harefield Nursery.
EYL/29/54 Pinkwell Hyde House, Newhaven Close,
Hillingdon 2306/SPP/2002/238
37,257.94 37,257.94 36,836.02 36,836.02 0.00 421.92 0.00 For primary school places in the Hayes/Harlington area. Interest accrued. Allocated
to Pinkwell Primary School expansion: feasibility study commissioned. Expenditure
of £27,486.48 will be recharged out of s106 for closure of 08/09 Financial Year as
these project costs should have been met from school modernisation funds. No time
constraints.
EYL/30/30 Yiewsley Former Bridge Works, Bentinck
Road W/D/ 20610/APP/2002/2407
161,898.00 161,898.00 0.00 0.00 0.00 161,898.00 0.00 161,898.00 contribution for the provision of secondary school places in the West
Drayton/Yiewsley area. No LEA Secondary school in West Drayton. Now allocated to
primary school expansion in West Drayton by way of re-imbursement - i.e. it can be
demonstrated that equivalent funding from the Council had been spent to provide
sufficient secondary school places at Stockley Academy (the nearest secondary
school). Time constraint no longer applicable.
EYL/38/104
see: PT278/22
West Drayton Defence Research Agency, West
Drayton - New Nursery & W
Drayton Primary School
Improvements / 49542F/98/1509
394,890.45 394,890.45 389,607.96 389,607.96 0.00 5,282.49 0.00 Nursery construction and school improvements at West Drayton Primary School.
Earmarked for West Drayton area primary expansion. No time constraints.
EYL/39/65A Harefield Land at North Works,
Summerhouse Lane, Harefield
201AJ/98/2472
121,675.43 121,675.43 121,675.43 102,605.08 19,070.35 0.00 0.00 Primary School places in Harefield (103K). Funds spent on the Hillingdon Rising
Fives Programme at Harefield Infant and Junior School. 5K spent towards CCTV at
Harefield Primary with additional match funding of £10,000 from the £250,000 capital
funds (see Cabinet Lead Member report March 2004). No time constraints.
Balance
spent towards Harefield Nursery.
EYL/43/67 Townfield Herne House, Church Walk, Hayes
15405/APP/2003/188
67,843.93 67,843.93 46,354.68 46,354.68 0.00 21,489.25 0.00 Educational places and facilities in the area. Unspent funds 7 years from notice of
implementation (not received) to be refunded. Notice of Implementation requested
from the developer. Interest accrued. Earmarked to the Pinkwell Primary School
expansion project. Expenditure of £46,354.68 will be recharged out of s106 for
closure of 08/09 Financial Year as these project costs should have been met from
school modernisation funds.
EYL/44/81 Heathrow
Villages
339-353 High Street, Harlington
53740/APP/99/310
19,253.00 19,253.00 0.00 0.00 0.00 19,253.00 0.00 For primary school places in the Hayes & Harlington area. No time constraints.
Interest accrued. Earmarked to Pinkwell Primary School: feasibility study
commissioned.
FINANCIAL UPDATE ON SECTION 106 AND 278 AGREEMENTS AT 31 MARCH 2010 APPENDIX 1
CASE REF. WARD SCHEME / PLANNING
REFERENCE
TOTAL INCOME TOTAL INCOME TOTAL
EXPENDITURE
TOTAL
EXPENDITURE
2009 / 2010
EXPENDITURE
BALANCE OF
FUNDS
BALANCE
SPENDABLE
NOT
ALLOCATED
COMMENTS
(as at mid May 2010)
AS AT 31/ 3/10 AS AT 31/12/09 AS AT 31/ 3/10 AS AT 31/12/10 To 31/ 3/10 AS AT 31/ 3/10 AS AT 31/ 3/10
EYL/66/144 Northwood 68 Ducks Hill Road
11900/APP/2005/1087
183,044.65 183,044.65 99,819.57 99,819.57 0.00 83,225.08 0.00 Towards the costs of providing primary and secondary school places in the Borough.
No time constraints. £16,400 spent on Ruislip High School. £75,852.85 spent
towards Ruislip High School costs. Earmarked for Primary School expansions in
north Ruislip/Northwood areas. Further £1,423 spent towards Ruislip High School.
£5,000 spent towards Sacred Heart Primary School modernisation.
EYL/67/145 West Drayton 6A Swan Road West Drayton
9037/APP/2005/2945
21,928.87 21,928.87 0.00 0.00 0.00 21,928.87 0.00 Towards the costs of providing primary and secondary school places in the Borough.
Earmarked for West Drayton area primary expansion. No time constraints.
EYL/71/155B West Drayton Fmr RAF West Drayton, Porters
Way, West Drayton
5107/APP/2005/2082
953,668.35 953,668.35 485,861.35 485,861.35 0.00 467,807.00 467,807.00 First contribution received as a third of the total education contribution. To be used
solely for the purpose of funding additional places at primary and/or secondary
schools within a three mile radius of the site. Earmarked for West Drayton area
primary expansion. Funds to be spent within three years of receipt i.e. first
contribution spent by 05/12/2009. £465,861.35 spent towards Uxbridge High School
construction project. £20,000 spent towards Longmead Primary School expansion.
Second contribution (£467,807.00) received towards the same purpose. Second
contribution to be spent by Dec 2012.
EYL/74/158 Botwell 29 Dawley Road, Hayes
11280/APP/2005/678
14,543.00 14,543.00 0.00 0.00 0.00 14,543.00 0.00 Towards the costs of providing primary and secondary school places in the Borough.
Earmarked for Pinkwell classrooms. No time constraints.
EYL/76/163 West Drayton 18a Colham Ave, West Drayton
29679/APP/2006/1048
18,939.00 18,939.00 8,826.00 8,826.00 0.00 10,113.00 0.00 To be applied towards primary and secondary school places within 3 miles of the
development. £10,113.43 is earmarked for West Drayton area primary expansion.
No time limits. Remainder to be used at Uxbridge High School modernisation. £8,826
spent towards Uxbridge High School construction project.
EYL/78/161B
(see also:
EYL/86/161B)
West Drayton Former Honeywell Site, Trout Road,
West Drayton
335/APP/2002/2754
243,320.37 243,320.37 186,447.40 186,447.40 0.00 56,872.97 0.00 25% of the total education contribution to be applied towards the provision of new
school places and the improvement of existing education facilities at all primary
schools within the Yiewsley, West Drayton and Cowley area and secondary schools
within 3 miles of the site. Funds earmarked for West Drayton area primary expansion.
Unexpended funds after 7 years of receipt are to be refunded (31 January 2014)
including interest. £186,447.40 spent towards Longmead Primary School expansion.
EYL/79/140G Pinkwell MOD Records Office Stockley
Road/Bourne Avenue, Hayes
(Kings Oak)18399/APP/2004/2284
791,811.37 791,811.37 0.00 0.00 0.00 791,811.37 0.00 To be applied towards the costs of providing educational places at any