Read the text of this document (19 pages)
Page 1
DRAFT SCOPING REPORT
Major Review
Working Title
A Review of Footway Parking in Priority Areas (Phase 1)
Committee Residents’ Services Select Committee
Review Year 2025/2026
OBJECTIVES
Aim of Review
To undertake a focused review of footway parking arrangements on a small number
of priority roads in Hillingdon, particularly near schools, GP surgeries and shopping
parades, where accessibility concerns have been raised. The review will assess
signage, enforcement, and practical improvements to support pedestrian access and
safety.
Terms of Reference
1. To review footway parking arrangements on a small number of priority roads
near schools, GP surgeries and shopping parades, and those with known
accessibility concerns for pedestrians, including roads where parking
enforcement is currently suspended.
2. To check the clarity and adequacy of signage and information for residents and
visitors.
3. To examine how enforcement currently operates on these roads, including
those with suspended enforcement, and identify any gaps or inconsistencies.
4. To consider simple, practical improvements such as better signage, clearer
mapping, and digital tools to support enforcement.
5. To look at good practice from other London boroughs.
6. To make initial recommendations to Cabinet on how to improve safety,
accessibility and enforcement in these priority locations, establishing a policy
framework for any wider review of this across the Borough in the future.
BACKGROUND
Footway parking in Hillingdon has evolved over decades, with over 400 roads
historically exempted from enforcement. Many of these exemptions were informal or
temporary, often lacking compliant signage or markings. While some roads have
formal schemes, others rely on informal, self-managed arrangements. This has led to
Page 2
inconsistent enforcement, accessibility challenges for pedestrians, and confusion for
residents and visitors.
Scope
This Phase 1 review will focus on a small number of priority roads with known
accessibility issues. It will assess the clarity of signage, the impact on pedestrian
access, and the effectiveness of current enforcement. The review will also consider
practical improvements and examples of good practice from other boroughs.
Known Issues
• Inconsistent or unclear signage in exempted roads.
• Accessibility challenges for pedestrians, especially those with mobility or visual
impairments.
• Enforcement gaps and confusion over legal status of informal schemes.
• Resident resistance to formal schemes due to potential loss of parking capacity.
• Damage to footways, verges, and street furniture from inappropriate parking.
Role of Residents
• Residents shape footway parking policy through:
• Petitions and Consultations – requesting changes or opposing schemes.
• Exemption Requests – leading to suspended enforcement in many roads.
• Feedback on Physical Changes – e.g., verge removal or parking schemes.
• Neighbourly Agreements – informal self-policing in exempted roads.
• Accessibility Lobbying – especially for mobility and vision needs.
• Participation in Reviews – such as the 2016 study of exemptions.
Connected matters
• Parking strategy and enforcement policy.
• Resident engagement and complaints.
• Digital transformation and service accessibility.
Legislative context
• Greater London Council (General Powers) Act 1974, s.15 – London-wide ban
on footway parking, with borough power to grant exemptions.
• Traffic Management Act 2004 (Part 6) – framework for civil parking
enforcement.
• Road Traffic Regulation Act 1984 – powers for Traffic/Parking Orders that
formalise exemptions and schemes.
Page 3
• Traffic Signs Regulations and General Directions 2016 – standards for lawful
signage and markings.
• Highways Act 1835 s.72 and related provisions – offence of driving on the
footway (police enforced).
• Other police- enforced provisions: Highways Act 1980 s.137, Town Police
Clauses Act 1847 s.28, and Construction & Use Regs 1986 reg.103.
• Road Traffic Act 1988 s.19 – HGV restrictions on verges/footways.
EVIDENCE GATHERING
Core intelligence required:
• List of roads with formal and informal footway parking arrangements (see Appendix
1) – this will need to be narrowed down to a small number of priority areas.
Councillor input will be useful in this.
• Resident and Ward Councillor feedback, complaints, and petitions.
• Site visits to assess signage, accessibility, and parking behaviour - suspended
zones with high complaint volumes.
• Enforcement data (PCNs issued, appeals, cancellations).
• Examples of good practice from other London boroughs.
Cabinet Members & Services relevant to this review
• Cabinet Member for Community & Environment / Cabinet Member for Planning,
Housing & Growth.
• Parking Services and Enforcement Team.
• Highways and Transportation Team.
• Legal Services (for compliance and enforcement powers).
Potential Witnesses and Site Visits
• Officers from Parking Enforcement, Highways, and Legal Services.
• Local residents and Ward Councillors.
• Representatives from schools, GP surgeries, and local businesses.
• Site visits to priority roads with known issues.
Lines of Enquiry
• Specific lines of enquiry will be worked up prior to witness sessions.
REVIEW PLANNER
Proposed timeframe & milestones for the review:
Page 4
Meeting Date Action Purpose / theme Witnesses / officers
attending
9 September
2025
Agree Scoping
Report
Define scope and
objectives / understand
the core issues
Democratic Services
Transportation Officer
6 November
2025
Witness Session 1 Current enforcement
and suspension
practices
Richard Webb / Freddie
Mohammed / Jas Rattu
/ David Knowles
December
2025
Site Visit Review signage and
specific suspended
zones
Committee Members
8 January
2026
Witness Session 2 Resident and business
impact
Best practice and
innovation
Communications, Local
Residents, Business
Representatives
18 February
2026
Debrief and
emerging findings
To discuss key findings
and identify potential
recommendations
Democratic Services
10 March
2026
Approval of draft
final report
Proposals – agree
recommendations and
final draft report to
Cabinet
Committee Members
22 April 2026 Final Report to
Cabinet
Cabinet Members
Resource Requirements
No financial assessment required at scoping stage. Any recommendations with budget
implications will be discussed with Cabinet Members and the Leader.
Equalities Impact
The review will promote equitable access to footways and ensure that enforcement
practices do not disadvantage vulnerable residents. No formal Equalities Impact
Assessment is required at this stage.
Scrutiny Benefit
• Driving improvement and modernisation.
• Supporting accessibility and safety for all residents.
• Providing evidence-based recommendations to Cabinet.
Page 5
• Demonstrating effective scrutiny and resident engagement.
Author of Scoping Report Liz Penny
Date 1 September 2025
David Knowles, May 2025
Page15
Roads in Hillingdon exempted from Footway Parking Enforcement based on resolutions
made by
the Council at the time (see dates in table below).
Locations Exempt from Footway Parking Enforcement (except where there are waiting restrictions
or stopping prohibitions)
Generally
, the Council's criteria for footway parking are as follows12:
- Vehicles must park at least 15 metres from any junction.
- Vehicles must park with only two wheels on the footway and leave at least 1.5 metres width of
clear footway for pedestrians to walk along.
- Any goods vehicle parked on the footway must have an unladen weight of 1525kg or less.
- Parking is permitted on tarmac areas but not on grass verges or on paving slabs.
It shoul
d be noted that there are some exceptions to these criteria which are detailed in the table
below.
A key probl
em is that these arrangements were brokered between the Council and the residents of
the time; both may changed considerably in the years that ensued. Furthermore, in common with
the tenet of much formal parking and traffic legislation, a visitor to an area cannot be expected to
be aware of these arrangements.
13
Street Date scheme
approved14
Ward
(old ward names)
Comments
Acacia Avenue, Hayes 16-Nov-99 Townfield Enforcement suspended pending installation of
formal scheme
Acorn Grove, Ruislip 10-Sep-97 South Ruislip Enforcement suspended ON THE GRASS AREA
ONLY pending installation of formal scheme
Adelphi Crescent 06-Jun-89 Charville Formal scheme with signs and lines
Adrian Close, Harefield 23-Sep-98 Harefield Enforcement suspended pending installation of
formal scheme
Aintree Close, Hayes 15-Jul-98 Yiewsley Formal scheme with signs and lines
Aldenham Drive, Hayes 18-Oct-95 Brunel Enforcement suspended pending installation of
formal scheme
Almond Avenue,
Ickenham
26-Feb-98 Ickenham Enforcement suspended pending installation of
formal scheme
Almond Avenue, West
Drayton
26-Feb-98 West Drayton Enforcement suspended pending installation of
formal scheme
Andover Close, Uxbridge 02-Apr-96 Uxbridge
South
Enforcement suspended pending installation of
formal scheme
Appledore Avenue,
Ruislip
01-Nov-89 Cavendish Formal scheme with signs and lines
Arundel Road, Uxbridge 04-Oct-05 Uxbridge
South
Enforcement suspended pending installation of
formal scheme
Ash Grove, Harefield 01-Nov-89 Harefield Formal scheme with signs and lines
12 See also 1987 papers attached at Appendix B
13 The Human Rights Act 1998 and its relationship to parking regulations in the UK, particularly regarding private parking companies, is a
complex issue with multiple layers. While the Act does not directly regulate private parking enforcement, it can be invoked to challenge
practices deemed ‘unfair’ or ‘unreasonable’. The Act ensures compliance with the European Convention on Human Rights, which
includes rights to fair trials and freedom from disproportionate interference with property. The context here is that a stranger to the local
area cannot be expected to know, by osmosis, what conditions have been locally agreed without clear information.
14 Links to original reports where available via the hyperlinks
David Knowles, May 2025
Page16
Street Date scheme
approved14
Ward
(old ward names)
Comments
Ash Grove, Hayes 08-Nov-90 Botwell Formal scheme with signs and lines
Ashby Way, Sipson 26-Feb-98 Heathrow
Villages
Enforcement suspended pending installation of
formal scheme
Ashford Avenue, Hayes 16-Nov-99 Yeading Enforcement suspended pending installation of
formal scheme
Ashley Road, Uxbridge 04-Oct-05 Uxbridge
South
Enforcement suspended pending installation of
formal scheme
Attlee Road, Hayes 05-Dec-96 Barnhill Formal scheme with signs and lines
Avenue Close, West
Drayton
18-Aug-05 West Drayton Enforcement suspended pending installation of
formal scheme
Balmoral Drive, Barnhill
Ward
01-Nov-89 Barnhill Formal scheme with signs and lines
Balmoral Drive, Charville
Ward
01-Nov-89 Charville Formal scheme with signs and lines
Barnhill Road, Hayes 01-Jun-89 Barnhill Formal scheme with signs and lines
Barnstaple Road, South
Ruislip
12-Mar-96 Cavendish Enforcement suspended pending installation of
formal scheme
Barrington Drive,
Harefield
20-Sep-04 Harefield Enforcement suspended pending installation of
formal scheme
Baxter Close, Hillingdon 16-Nov-99 Hillingdon
East
Enforcement suspended pending installation of
formal scheme
Beatrice Close, Eastcote 09-Sep-99 Northwood
Hills
Enforcement suspended pending installation of
formal scheme
Bedford Avenue, Hayes 01-Nov-89 Barnhill Formal scheme with signs and lines
Belmore Avenue, Hayes 01-Nov-89 Barnhill Formal scheme with signs and lines
Belmore Parade, Hayes 12-Aug-97 Barnhill Enforcement suspended pending installation of
formal scheme
Berkeley Road, Hillingdon 16-Nov-99 Hillingdon
East
Enforcement suspended pending installation of
formal scheme
Berwick Avenue, Hayes 23-Sep-98 Yeading Enforcement suspended pending installation of
formal scheme
Bevin Road, Hayes 19-Sep-96 Barnhill Enforcement suspended pending installation of
formal scheme
Birch Avenue, Yiewsley 01-Oct-88 Yiewsley Formal scheme with signs and lines
Bishops Road, Hayes 09-Sep-99 Botwell Enforcement suspended pending installation of
formal scheme
Blackpool Gardens,
Hayes
16-Nov-99 Charville Enforcement suspended pending installation of
formal scheme
Blackthorn Avenue, West
Drayton
13-Nov-97 West Drayton Enforcement suspended pending installation of
formal scheme
Blandford Waye, Hayes 06-Jan-89 Yeading Formal scheme with signs and lines
Blossom Way, West
Drayton
06-Jan-89 Heathrow
Villages
Formal scheme with signs and lines
Bondfield Avenue, Hayes 05-Jun-00 Barnhill Enforcement suspended pending installation of
formal scheme
Botwell Common Road 22-Nov-01 Botwell Enforcement suspended pending installation of
formal scheme on north side of the road only
Botwell Crescent, Hayes 09-Sep-99 Botwell Enforcement suspended pending installation of
formal scheme
Bradenham Road, Hayes 01-Nov-89 Charville Formal scheme with signs and lines
Brampton Road,
Hillingdon
20-Jun-94 Hillingdon
East
Enforcement suspended for the whole of the road
David Knowles, May 2025
Page17
Street Date scheme
approved14
Ward
(old ward names)
Comments
Breakspear Road South,
Ickenham
11-May-05 Ickenham Enforcement suspended outside NOS. 2 TO 16
ONLY pending installation of formal scheme.
Bridge Way, Ickenham 26-Jun-03 Ickenham Enforcement suspended pending installation of
formal scheme
Broadwater Gardens,
Harefield
11-Oct-90 Harefield Formal scheme with signs and lines
Bromley Crescent, Ruislip 26-Nov-98 South Ruislip Enforcement suspended OUTSIDE NOS. 2A TO
2D ONLY pending installation of formal scheme
Brooklyn Way West
Drayton
08-Feb-06 West Drayton Enforcement suspended pending installation of
formal scheme
Burnham Gardens, Hayes 18-Jan-96 Pinkwell Formal scheme with signs and lines
Burns Close, Hayes 28-Aug-02 Barnhill Enforcement suspended pending installation of
formal scheme, INCLUDING FOR VEHICLES
OVER 1525kg.
Byron Way, Hayes 01-Nov-89 Charville Formal scheme with signs and lines
Byron Way, West Drayton 02-Sep-00 Heathrow
Villages
Enforcement suspended pending installation of
formal scheme
Camden Avenue, Hayes 16-Nov-99 Yeading Enforcement suspended pending installation of
formal scheme
Campden Road,
Ickenham
01-Oct-88 Ickenham Formal scheme with signs and lines
Carfax Road, Harlington 01-Nov-89 Pinkwell Formal scheme with signs and lines
Castle Avenue, Yiewsley 21-Jul-04 Yiewsley Enforcement suspended pending installation of
formal scheme
Cedar Avenue, Hayes 16-Nov-99 Townfield Enforcement suspended pending installation of
formal scheme
Cedars Drive, Hillingdon 16-Nov-00 Uxbridge
North
Enforcement suspended pending installation of
formal scheme
Central Avenue, Hayes 02-Sep-09 Townfield Enforcement suspended except where there are
waiting restrictions or where there is a no stopping
prohibition pending installation of formal scheme
Cervantes Court,
Northwood
23-Sep-98
Enforcement suspended pending installation of
formal scheme
Chalfont Road, Hayes 29-Apr-89 Townfield Formal scheme with signs and lines
Charles Street, Hillingdon 04-Mar-05 Brunel Enforcement suspending pending installation of
formal scheme
Charnwood Road,
Hillingdon
20-Sep-01 Uxbridge
North
Enforcement suspended pending installation of
formal scheme
Chaucer Avenue, Hayes 05-Jun-89 Barnhill Formal scheme with signs and lines
Cheddar Waye, Hayes 20-Sep-01 Barnhill Enforcement suspended pending installation of
formal scheme
Cherry Grove, Hayes 20-Sep-01 Townfield Enforcement suspended pending installation of
formal scheme
Cherry Grove, Hillingdon 04-Feb-91 Brunel Formal scheme with signs and lines
Cherry Tree Avenue,
Yiewsley
01-Oct-88 Yiewsley Enforcement suspended pending installation of
formal scheme
Chestnut Avenue,
Yiewsley
21-Jun-95 Yiewsley Formal scheme with signs and lines
Chestnut Close, Hayes 08-Apr-90 Botwell Formal scheme with signs and lines
Chestwood Grove,
Hillingdon
18-Jan-96 Uxbridge
North
Enforcement suspended pending installation of
formal scheme
Church Close Uxbridge 09-Aug-07 Uxbridge
South
Enforcement suspended pending installation of
formal scheme
David Knowles, May 2025
Page18
Street Date scheme
approved14
Ward
(old ward names)
Comments
Church Lane, Uxbridge 13-Jun-07 Uxbridge
South
Enforcement suspended pending installation of
formal scheme
Church Road, Hayes 15-Mar-93 Botwell Formal scheme with signs and lines
Church Road, Hayes 15-Mar-93 Townfield Formal scheme with signs and lines
Cleave Avenue, Hayes 02-Mar-00 Pinkwell Enforcement suspended pending installation of
formal scheme
Clement Gardens, Hayes 22-Jan-93 Pinkwell Enforcement suspended pending installation of
formal scheme
Clevedon Gardens,
Harlington
06-Jan-89 Pinkwell Formal scheme with signs and lines
Clifton Gardens,
Hillingdon
02-Aug-94 Hillingdon
East
Enforcement suspended pending installation of
formal scheme
Clovelly Close, Ickenham 26-Nov-98 Ickenham Enforcement suspended pending installation of
formal scheme
Colbrook Close, Hayes 06-Jan-87 Pinkwell Formal scheme with signs and lines
Colham Avenue, West
Drayton
23-Sep-98 Yiewsley Enforcement suspended OUTSIDE NOS. 10 TO
16 ONLY pending installation of formal scheme
Colham Green Road,
Brunel Ward
26-Feb-98 Brunel Enforcement suspended pending installation of
formal scheme
Colham Green Road,
Yiewsley
26-Feb-98 Yiewsley Enforcement suspended pending installation of
formal scheme
Collingwood Road,
Hillingdon
01-Oct-88 Brunel Formal scheme with signs and lines
Commonwealth Avenue,
Hayes
11-Jun-03
Enforcement suspended pending installation of
formal scheme
Connaught Close
Hillingdon
15-Jan-07 Charville Enforcement suspended pending installation of
formal scheme
Coronation Road,
Cranford
01-Nov-87 Pinkwell Formal scheme with signs and lines
Corwell Lane, Hillingdon 06-Jul-15 Botwell Formal scheme with compliant signs and lines in
the section between Harlington Road and
Lansdowne Road
Cowdray Road, Hillingdon 16-Nov-99 Hillingdon
East
Enforcement suspended pending installation of
formal scheme
Cowley Mill Road,
Uxbridge
20-Jun-96 Uxbridge
South
Enforcement suspended OUTSIDE NOS. 76 TO
80 ONLY pending installation of formal scheme
Cowley Road, Uxbridge 23-Mar-96 Uxbridge
South
Enforcement suspended pending installation of
formal scheme
Crane Gardens,
Harlington
01-Nov-87 Pinkwell Formal scheme with signs and lines
Cranford Lane, Harlington 05-Jan-97 Heathrow
Villages
Formal scheme with signs and lines
Craneswater, Harlington 15-Apr-93 Heathrow
Villages
Enforcement suspended pending installation of
formal scheme
Craven Close, Hayes 19-Sep-94 Barnhill Enforcement suspended pending installation of
formal scheme
Crowland Avenue, Hayes 02-Feb-98 Pinkwell Formal scheme with signs and lines
Dagnall Crescent, Cowley 15-Dec-04 Uxbridge
South
Enforcement suspended pending installation of
formal scheme
Dale Drive, Hayes 05-Jun-98 Charville Formal scheme with signs and lines
Dallas Terrace, Hayes 08-Nov-90 Botwell Formal scheme with signs and lines
David Knowles, May 2025
Page19
Street Date scheme
approved14
Ward
(old ward names)
Comments
Dalton Close, Hayes 11-Mar-97 Charville Enforcement suspended pending installation of
formal scheme
Darris Close, Hayes 2-Mar-00 Yeading Enforcement suspended ON THE WEST SIDE
ONLY pending installation of formal scheme
Dawley Avenue,
Hillingdon
26-Feb-98 Botwell Enforcement suspended pending installation of
formal scheme
Dawley Road, Hayes 01-Mar-01 Botwell Enforcement suspended OPPOSITE ORCHARD
COTTAGES WHEN THE WAITING
RESTRICTIONS DO NOT APPLY ONLY pending
installation of formal scheme
Dean Close, Hillingdon 20-Jun-96 Uxbridge
North
Enforcement suspended pending installation of
formal scheme
Dellside, Harefield 30-Oct-91 Harefield Enforcement suspended pending installation of
formal scheme
Denecroft Crescent,
Hillingdon
26-Nov-98 Hillingdon
East
Enforcement suspended pending installation of
formal scheme
Dickens Avenue,
Hillingdon
TBA Yiewsley Enforcement suspended pending installation of
formal scheme
Dorset Avenue, Hayes 29-Mar-05 Charville Enforcement suspended pending installation of
formal scheme
Dorset Close, Hayes 04-Oct-96 Charville Enforcement suspended pending installation of
formal scheme
Drayton Gardens, West
Drayton
03-Oct-95 West Drayton Enforcement suspended pending installation of
formal scheme, except in the section where the
Zone WD8 PMS applies
Dunbar Close, Hayes 25-Aug-99 Barnhill Formal scheme with signs and lines
Dunedin Way, Hayes 10-Mar-99 Yeading Enforcement suspended pending installation of
formal scheme
Elers Road, Hayes 13-Dec-88 Pinkwell Formal scheme with signs and lines
Enstone Road, Ickenham 01-Oct-88 Ickenham Formal scheme with signs and lines
Eskdale Road, Uxbridge 25-Feb-04 Uxbridge
South
Enforcement suspended pending installation of
formal scheme (inside of the island only)
Eton Road, Harlington 01-Nov-87 Heathrow
Villages
Formal scheme with signs and lines
Evelyns Close, Hillingdon 28-Aug-02 Yiewsley Enforcement suspended pending installation of
formal scheme, INCLUDING FOR VEHICLES
OVER 1525kg.
Evergreen Way, Hayes 29-Apr-89 Townfield Formal scheme with signs and lines
Exmouth Road, Hayes 01-Nov-89 Charville Formal scheme with signs and lines
Fairey Avenue, Hayes 07-Sep-05 Pinkwell Formal scheme with signs and lines
Fairfield Road, Yiewsley 12-Dec-95 Yiewsley Enforcement suspended pending installation of
formal scheme
Fairholme Crescent,
Hayes
05-Jun-89 Charville Formal scheme with signs and lines
Fairway Avenue, West
Drayton
09-Sep-99 West Drayton Enforcement suspended pending installation of
formal scheme
Farmlands, Pinner 05-Jun-00 Northwood
Hills
Enforcement suspended pending installation of
formal scheme
Festival Close, Hillingdon 09-Sep-99 Hillingdon
East
Enforcement suspended ON THE EAST SIDE
ONLY pending installation of formal scheme
Findhorn Avenue, Hayes 01-Nov-89 Barnhill Formal scheme with signs and lines
Fredora Avenue, Hayes 01-Apr-89 Charville Formal scheme with signs and lines
Friar Road, Hayes 15-Mar-93 Yeading Formal scheme with signs and lines
David Knowles, May 2025
Page20
Street Date scheme
approved14
Ward
(old ward names)
Comments
Frogmore Gardens,
Hayes
22-Jan-93 Charville Enforcement suspended pending installation of
formal scheme
Fulham Close, Hillingdon 15-Sep-95 Brunel Enforcement suspended pending installation of
formal scheme
Gainsborough Road,
Hayes
19-Sep-96 Charville Enforcement suspended pending installation of
formal scheme
Gilbert Road, Harefield 24-Jun-08 Harefield Enforcement suspended pending installation of
formal scheme
Glebe Close, Ickenham 28-Aug-02 Ickenham Enforcement suspended on the EAST SIDE
ONLY pending installation of formal scheme,
INCLUDING FOR VEHICLES OVER 1525kg.
Glebe Road, Hayes 29-Apr-91 Botwell Formal scheme with signs and lines
Gledwood Avenue, Hayes 01-Nov-89 Barnhill Formal scheme with signs and lines
Gledwood Crescent,
Hayes
18-Jan-96 Barnhill Enforcement suspended pending installation of
formal scheme
Glenhurst Avenue, Ruislip 15-Mar-93 West Ruislip Formal scheme with signs and lines
Glisson Road, Hillingdon 20-Sep-01 Uxbridge
North
Enforcement suspended pending installation of
formal scheme
Gordon Road, Yiewsley 01-Nov-89 Yiewsley Formal scheme with signs and lines
Goshawk Gardens, Hayes TBA Charville Enforcement suspended pending installation of
formal scheme
Goulds Green, Hillingdon 25-Feb-05 Yiewsley Enforcement suspended pending installation of
formal scheme
Grange Close Hayes 19-Mar-07 Botwell Enforcement suspended pending installation of
formal scheme
Green Way, Hayes 05-Dec-96 Barnhill Formal scheme with signs and lines
Gresham Road,
Hillingdon
20-Sep-01 Uxbridge
North
Enforcement suspended pending installation of
formal scheme
Grosvenor Avenue,
Hayes
16-Nov-99 Charville Enforcement suspended pending installation of
formal scheme
Haig Road, Hayes 01-Apr-89 Brunel Formal scheme with signs and lines
Halsway, Hayes 19-Sep-94 Townfield Enforcement suspended pending installation of
formal scheme
Hamilton Road, Hayes 23-Mar-92 Townfield Formal scheme with signs and lines
Hanover Circle, Hayes 21-Sep-00 Botwell Enforcement suspended pending installation of
formal scheme
Harries Road, Hayes 28-Oct-96 Yeading Formal scheme with signs and lines
Harvey Road 20-Sep-01 Hillingdon Enforcement suspended pending installation of
formal scheme
Harvil Road, Harefield 01-Apr-92 Harefield Formal scheme with signs and lines outside Nos.
1 to 6 Harvil Road near the junction with Moorhall
Road
Hatton Grove, West
Drayton
TBA West Drayton Enforcement suspended pending installation of
formal scheme
Hayman Crescent, Hayes 01-Nov-89 Charville Formal scheme with signs and lines
Haystall Close, Hayes 16-Nov-00 Charville Enforcement suspended pending installation of
formal scheme
Hazeldene Gardens,
Hillingdon
16-Nov-99 Hillingdon
East
Enforcement suspended pending installation of
formal scheme
Hermon Grove, Hayes 25-Feb-05 Townfield Enforcement suspended pending installation of
formal scheme
Hesa Road, Hayes 01-Apr-89 Townfield Formal scheme with signs and lines
Hetherington Way,
Ickenham
26-Nov-98 Ickenham Enforcement suspended pending installation of
formal scheme
David Knowles, May 2025
Page21
Street Date scheme
approved14
Ward
(old ward names)
Comments
High Street, Harlington 05-Sep-96 Heathrow
Villages
Enforcement suspended OUTSIDE NOS. 435 TO
443 ONLY pending installation of formal scheme
Hillbourne Close, Hayes 23-Mar-92 Pinkwell Formal scheme with signs and lines
Hillcroft Crescent, Ruislip 28-Jun-92 Cavendish Enforcement suspended pending installation of
formal scheme
Hilliards Road, Cowley 12-Mar-96
Enforcement suspended pending installation of
formal scheme
Hilliers Avenue, Hillingdon 15-Mar-93 Brunel Formal scheme with signs and lines
Hillingdon Hill, Brunel
Ward
29-Mar-04 Brunel Enforcement suspended IN SLIP ROAD
OUTSIDE NOS. 44 -62 pending consideration of a
petition by the Cabinet Member for Planning and
Transportation.
Hillingdon Hill, Uxbridge
North Ward
29-Mar-04 Uxbridge
North
Enforcement suspended IN SLIP ROAD
OUTSIDE NOS. 44 -62 pending consideration of a
petition by the Cabinet Member for Planning and
Transportation.
Hillside, Harefield 04-Feb-91 Harefield Formal scheme with signs and lines
Hinkley Close, Harefield 02-Sep-91 Harefield Formal scheme with signs and lines
Hitherbroom Road, Hayes 20-Jun-96 Townfield Enforcement suspended BETWEEN AVONDALE
DRIVE AND HUGHES ROAD ONLY pending
installation of formal scheme.
Hobart Close, Yeading 09-Sep-99 Yeading Enforcement suspended pending installation of
formal scheme
Hollywood Gardens,
Hayes
01-Nov-89 Barnhill Formal scheme with signs and lines
Holmbury Gardens,
Hayes
29-Apr-91 Botwell Formal scheme with signs and lines
Hoppner Road, Hayes 01-Nov-89 Charville Formal scheme with signs and lines
Hornbeam Road 17-Dec-04 Yeading Enforcement suspended pending installation of
formal scheme
Hughes Road, Hayes 23-Sep-92 Townfield Formal scheme with signs and lines
Hurstfield Crescent,
Hayes
05-Jun-89 Charville Formal scheme with signs and lines
Hyde Way, Harlington 01-Nov-87 Pinkwell Formal scheme with signs and lines
Ickenham Road, Ruislip 09-Mar-95 West Ruislip Enforcement suspended pending installation of
formal scheme
Keats Close, Hayes 01-Nov-89 Barnhill Formal scheme with signs and lines
Kenilworth Gardens,
Hayes
01-Jan-88 Barnhill Formal scheme with signs and lines
Kenmore Crescent,
Hayes
01-Nov-89 Charville Formal scheme with signs and lines
Kennett Drive, Hayes 02-Mar-00 Yeading Enforcement suspended pending installation of
formal scheme
Kings Road, West
Drayton
16-Nov-00 West Drayton Enforcement suspended pending installation of
formal scheme
Kingston Avenue, West
Drayton
11-Jun-01 Yiewsley Enforcement suspended pending installation of
formal scheme
Kingsway, Hayes 15-Apr-93 Botwell Enforcement suspended pending installation of
formal scheme
Laburnum Avenue,
Yiewsley
01-Nov-89 Yiewsley Formal scheme with signs and lines
Laburnum Road,
Harlington
01-Nov-87 Pinkwell Formal scheme with signs and lines
Lancaster Walk, Hayes 11-Jun-03 Botwell Enforcement suspended pending installation of
formal scheme
David Knowles, May 2025
Page22
Street Date scheme
approved14
Ward
(old ward names)
Comments
Langdale Drive, Hayes 23-Mar-92 Charville Formal scheme with signs and lines
Langland Court,
Northwood
12-Oct-11 Northwood Enforcement suspended pending installation of
formal scheme
Langley Crescent,
Harlington
01-Nov-87 Heathrow
Villages
Formal scheme with signs and lines
Lansbury Drive, Hayes 05-Jun-89 Charville Formal scheme with signs and lines, new
standalone scheme outside Nos. 25 to 35
Lansdowne Road,
Hillingdon
26-Feb-98 Botwell Formal scheme with signs and lines
Larch Crescent, Hayes 13-Feb-96 Yeading Formal scheme with signs and lines
Lavender Rise, West
Drayton
13-Jan-92 West Drayton Formal scheme with signs and lines
Lawrence Drive,
Ickenham
16-Jul-98 Ickenham Enforcement suspended pending installation of
formal scheme
Lea Crescent, Ruislip 18-Jan-96 South Ruislip Enforcement suspended pending installation of
formal scheme
Leaholme Waye, Ruislip 19-Sep-96 West Ruislip Enforcement suspended pending installation of
formal scheme
Leamington Place, Hayes 01-Nov-89 Charville Formal scheme with signs and lines
Lees Road, Hillingdon 23-Mar-92 Brunel Formal scheme with signs and lines
Leybourne Road,
Hillingdon
18-Jan-96 Hillingdon
East
Enforcement suspended pending installation of
formal scheme
Leys Close, Harefield 12-Mar-96 Harefield Enforcement suspended pending installation of
formal scheme
Lime Avenue, Yiewsley 16-Nov-99 Yiewsley Enforcement suspended pending installation of
formal scheme
Lime Grove, Hayes 21-Apr-91 Botwell Formal scheme with signs and lines
Long Lane, Hillingdon
East Ward
23-Mar-92 Hillingdon
East
Formal scheme with signs and lines
Long Lane, Uxbridge
North Ward
23-Mar-92 Uxbridge
North
Formal scheme with signs and lines
Longford Gardens, Hayes 02-Mar-00 Yeading Enforcement suspended pending installation of
formal scheme
Longmead Road, Hayes 10-Mar-99 Townfield Enforcement suspended pending installation of
formal scheme
Malvern Road, Harlington 20-Jun-96 Heathrow
Villages
Enforcement suspended pending installation of
formal scheme
Mansfield Drive, Hayes 01-Nov-89 Charville Formal scheme with signs and lines
Maple Road, Yeading 16-Nov-99 Yeading Enforcement suspended pending installation of
formal scheme
Marian Close, Hayes 09-Sep-99 Yeading Enforcement suspended pending installation of
formal scheme
Marlborough Road,
Hillingdon
06-Jul-04 Hillingdon
East
Enforcement suspended pending installation of
formal scheme
Marlow Gardens, Hayes 01-Apr-89 Pinkwell Formal scheme with signs and lines
Marshall Drive, Hayes 15-Apr-93 Barnhill Enforcement suspended pending installation of
formal scheme
Marsworth Close,
Yeading
09-Sep-99 Yeading Enforcement suspended pending installation of
formal scheme
Marvell Avenue, Hayes 01-Nov-89 Barnhill Formal scheme with signs and lines
Maxwell Road, West
Drayton
19-Sep-94 Heathrow
Villages
Enforcement suspended pending installation of
formal scheme
David Knowles, May 2025
Page23
Street Date scheme
approved14
Ward
(old ward names)
Comments
Mayfield Close Uxbridge 22-Nov-05 Hillingdon
East
Enforcement suspended pending installation of
formal scheme
Maygoods Lane, Cowley
Area
16-Nov-99 Brunel Enforcement suspended pending installation of
formal scheme
Meadowview Road,
Hayes
20-Sep-01 Charville Enforcement suspended pending installation of
formal scheme
Mellow Lane East, Hayes 11-Mar-97 Hillingdon
East
On southern side only between its junction with
Hayes End Drive westwards to the footpath to
Meadow View Road ( o/s 25 Mellow Lane East).
Middleton Road, Hayes 09-Sep-99 Botwell Formal scheme with signs and lines
Middleton Road, Hayes 04-Feb-91 Botwell Formal scheme with signs and lines
Midhurst Gardens,
Hillingdon
16-Nov-99 Hillingdon
East
Enforcement suspended pending installation of
formal scheme
Milton Close, Hayes 01-Nov-89 Barnhill Formal scheme with signs and lines
Milverton drive, Ickenham 25-Feb-05 Ickenham Enforcement suspended pending installation of
formal scheme
Misbourne Road,
Hillingdon
20-Sep-01 Uxbridge
North
Enforcement suspended pending installation of
formal scheme
Monmouth Road,
Harlington
01-Nov-87 Pinkwell Formal scheme with signs and lines
Montcalm Close, Yeading 11-Jun-01 Yeading Enforcement suspended pending installation of
formal scheme
Moorland Road,
Harmondsworth
16-Nov-00 Heathrow
Villages
Enforcement suspended pending installation of
formal scheme
Moray Avenue, Hayes 24-Apr-91 Botwell Formal scheme with signs and lines
Morello Avenue,
Hillingdon
04-Feb-91 Brunel Formal scheme with signs and lines
Morrison Road, Hayes 05-Jun-00 Barnhill Enforcement suspended pending installation of
formal scheme
Moston Close, Hayes 16-Nov-00 Pinkwell Enforcement suspended pending installation of
formal scheme
Mount Pleasant, Harefield 04-Feb-91 Harefield Formal scheme with signs and lines
Napier Close, West
Drayton
01-Apr-89 West Drayton Formal scheme with signs and lines
Nelson Road, Hillingdon 22-Nov-04 Hillingdon
East
Enforcement suspended pending consideration of
a petition by the Cabinet Member for Planning and
Transportation.
New Peachey Lane,
Cowley Area
16-Nov-99 Brunel Enforcement suspended pending installation of
formal scheme
Newlyn Close, Hillingdon 02-Apr-96 Brunel Enforcement suspended pending installation of
formal scheme
Newman Road, Hayes 14-Feb-92 Townfield Formal scheme with signs and lines
Newport Road, Hayes 02-Aug-94 Charville Enforcement suspended pending installation of
formal scheme
Nicholls Avenue,
Hillingdon
12-Mar-96 Brunel Enforcement suspended pending installation of
formal scheme
Nine Elms Avenue,
Cowley
16-Nov-99 Brunel Enforcement suspended pending installation of
formal scheme
Nine Elms Close, Cowley 16-Nov-99 Brunel Enforcement suspended pending installation of
formal scheme
Normandy Drive Hayes 20-Jul-07 Botwell Enforcement suspended pending installation of
formal scheme
David Knowles, May 2025
Page24
Street Date scheme
approved14
Ward
(old ward names)
Comments
North Hyde Gardens,
Hayes
29-Apr-91 Botwell Formal scheme with signs and lines
North Road, West
Drayton
28-Aug-02 West Drayton Enforcement suspended pending installation of
formal scheme, INCLUDING FOR VEHICLES
OVER 1525kg.
Oakdene Road, Hillingdon 05-Dec-96 Hillingdon
East
Enforcement suspended pending installation of
formal scheme
Oakington Avenue, Hayes 04-Oct-91 Pinkwell Formal scheme with signs and lines
Oakleigh Road, Hillingdon 16-Nov-99 Hillingdon
East
Enforcement suspended pending installation of
formal scheme
Oxford Avenue,
Harlington
20-Nov-01 Heathrow
Villages
Enforcement suspended pending installation of
formal scheme
Padcroft Road, West
Drayton
06-Feb-92 Yiewsley Formal scheme with signs and lines
Park Lane, Harefield 04-Feb-91 Harefield Formal scheme with signs and lines
Park Lane, Hayes 04-Feb-91 Charville Formal scheme with signs and lines
Park View Road,
Hillingdon
15-Feb-99 Yiewsley Enforcement suspended BETWEEN NOS 55 AND
65 ONLY pending installation of formal scheme
Parkfield Avenue,
Hillingdon
04-Mar-98 Hillingdon
East
Enforcement suspended pending installation of
formal scheme
Parsonage Close, Hayes 09-Sep-99 Townfield Enforcement suspended pending installation of
formal scheme
Pear Tree Avenue,
Yiewsley
01-Apr-89 Yiewsley Formal scheme with signs and lines
Peerless Drive, Harefield 08-Mar-91 Harefield Formal scheme with signs and lines
Peerless Drive, Harefield 28-Aug-02 Harefield Enforcement suspended pending installation of
formal scheme, INCLUDING FOR VEHICLES
OVER 1525kg.
Pendell Avenue,
Harlington
01-Nov-87 Heathrow
Villages
Formal scheme with signs and lines
Penzance Close,
Harefield
01-Feb-90 Harefield Formal scheme with signs and lines
Perry Close, Uxbridge 30-Apr-09 Yiewsley Exemption outside Flats 17-32 Perry Close,
Uxbridge
Petworth Gardens,
Hillingdon
18-Jan-96 Hillingdon
East
Enforcement suspended pending installation of
formal scheme
Phelps Way, Harlington 01-Nov-87 Pinkwell Formal scheme with signs and lines
Pield Heath Avenue,
Hillingdon
05-Jun-00 Brunel Enforcement suspended pending installation of
formal scheme
Pine Place, Hayes 13-Nov-95 Charville Enforcement suspended pending installation of
formal scheme
Pond Close, Harefield 11-Mar-97 Harefield Enforcement suspended pending installation of
formal scheme
Princes Park Avenue,
Hayes
29-Apr-91 Botwell Formal scheme with signs and lines
Princes Park Circle,
Hayes
04-Feb-91 Botwell Formal scheme with signs and lines
Princes Park Parade,
Hayes
08-Apr-05 Botwell Enforcement suspended pending installation of
formal scheme
Printinghouse Lane,
Hayes
01-Mar-01 Botwell Enforcement suspended pending installation of
formal scheme
David Knowles, May 2025
Page25
Street Date scheme
approved14
Ward
(old ward names)
Comments
Priory Close, Harefield 04-Feb-91 Harefield Formal scheme with signs and lines
Queens Road, Hayes 16-Nov-99 Botwell Enforcement suspended pending installation of
formal scheme
Queens Road, West
Drayton
10-Mar-99 West Drayton Enforcement suspended pending installation of
formal scheme
Raleigh Avenue, Hayes 06-Jun-89 Barnhill Formal scheme with signs and lines
Ravenswood Park,
Northwood
16-Nov-00 Northwood
Hills
Enforcement suspended pending installation of
formal scheme
Repton Avenue, Hayes 26-Nov-98 Pinkwell Enforcement suspended pending installation of
formal scheme
Reynolds Road, Hayes 28-Oct-96 Yeading Formal scheme with signs and lines
Richards Close,
Harlington
10-Mar-99 Heathrow
Villages
Enforcement suspended pending installation of
formal scheme
Rickard Close, West
Drayton
18-Aug-05 West Drayton Enforcement suspended pending installation of
formal scheme
Roker Park Avenue,
Ickenham
10-Mar-99 Ickenham Enforcement suspended pending installation of
formal scheme
Rosedale Avenue, Hayes 09-Sep-99 Botwell Formal scheme with signs and lines
Roseville Road,
Harlington
01-Nov-87 Pinkwell Formal scheme with signs and lines
Ross Close, Hayes 01-Apr-89 Pinkwell Formal scheme with signs and lines
Rostrever Gardens,
Hayes
28-Nov-96 Botwell Formal scheme with signs and lines
Royal Lane 09-Apr-94 Brunel Formal scheme with signs and lines
Russell Gardens, Sipson 01-Mar-01 Heathrow
Villages
Enforcement suspended pending installation of
formal scheme
Rutland Road, Hayes 19-Sep-96 Pinkwell Enforcement suspended pending installation of
formal scheme
Rutters Close, West
Drayton
09-Sep-99 West Drayton Enforcement suspended ON EASTERN
FOOTWAY OF WESTERN/EASTERN ARMS
AND ON BOTH SIDES IN CENTRAL ARM on
pending installation of formal scheme
Ryefield Avenue,
Hillingdon
13-Nov-97 Hillingdon
East
Enforcement suspended pending installation of
formal scheme
Sandow Crescent, Hayes 02-Jul-96 Botwell Formal scheme with signs and lines
Saunton Avenue, Hayes 08-Nov-90 Heathrow
Villages
Formal scheme with signs and lines
Saxony Parade, Hayes 16-Nov-00 Botwell Enforcement suspended pending installation of
formal scheme
Seaford Close, Ruislip 24-Mar-95 West Ruislip Enforcement suspended pending installation of
formal scheme
Seaton Road, Hayes 01-Apr-89 Pinkwell Formal scheme with signs and lines
Sedley Grove, Harefield 19-Aug-97 Harefield Formal scheme with signs and lines
Selan Gardens, Hayes 05-Jun-89 Barnhill Formal scheme with signs and lines
Selan Gardens, Hayes 01-Mar-01 Barnhill Enforcement suspended pending installation of
formal scheme
Shakespeare Avenue,
Hayes
20-Jun-96 Barnhill Formal scheme with signs and lines
Shaldon Drive, South
Ruislip
26-Feb-98 Cavendish Enforcement suspended pending installation of
formal scheme
Shelly Close, Hayes 25-May-89 Barnhill Formal scheme with signs and lines
David Knowles, May 2025
Page26
Street Date scheme
approved14
Ward
(old ward names)
Comments
Silverdale Gardens,
Hayes
02-Mar-00 Townfield Enforcement suspended ON THE TARMAC
VERGES ONLY pending installation of formal
scheme
Sipson Road, Harlington 01-Oct-88 Heathrow
Villages
Formal scheme with signs and lines
Snowdon Avenue,
Uxbridge
12-Aug-97 Hillingdon
East
Enforcement suspended pending installation of
formal scheme
Southfield Close,
Hillingdon
23-Mar-92 Brunel Formal scheme with signs and lines
Spencer Avenue, Hayes 25-May-89 Barnhill Formal scheme with signs and lines
St Annes Road, Harefield 11-Oct-90 Harefield Formal scheme with signs and lines
St Christopher Road,
Cowley
02-Apr-93 Brunel Formal scheme with signs and lines
St David Close, Cowley 15-Sep-10 Brunel Enforcement suspended pending installation of
formal scheme
St Giles Avenue,
Ickenham
21-Oct-13 Ickenham Formal scheme with compliant signs and lines
St Martins Road, Cowley 13-Mar-96 West Drayton Enforcement suspended pending installation of
formal scheme
St Marys Close, Harefield 01-Oct-88 Harefield Formal scheme with signs and lines
St Marys Road, Hayes 05-Jun-89 Townfield Formal scheme with signs and lines
St Marys Walk, Hayes 05-Jun-89 Townfield Formal scheme with signs and lines
St Matthew Close, Cowley 12-Mar-96 Brunel Enforcement suspended pending installation of
formal scheme
St Paul Close, Cowley 16-Jul-89 Brunel Formal scheme with signs and lines
St Peters Road, Cowley 12-Mar-96 Brunel Enforcement suspended ON BOTH SIDES FROM
THE JUNCTION OF MOORFIELD ROAD TO THE
COMMON BOUNDARY OF NOS. 41 AND 43 ST
PETERS ROAD pending installation of formal
scheme -
St. Martin Close, Cowley 28-Aug-02 West Drayton Enforcement suspended pending installation of
formal scheme, INCLUDING FOR VEHICLES
OVER 1525kg.
Star Road, Hillingdon 26-Feb-98 Hillingdon
East
Enforcement suspended pending installation of
formal scheme
Stirling Road, Hayes 01-Mar-94 Townfield Formal scheme with signs and lines
Stowe Crescent , Ruislip 28-Apr-15 West Ruislip Enforcement suspended pending installation of
formal scheme - Outside No 10, 12, 14,16 and 18
except where waiting restrictions are in place.
Strathearn Avenue,
Harlington
01-Apr-87 Heathrow
Villages
Formal scheme with signs and lines
Strone Wáy, Yeading 15-Apr-89 Yeading Enforcement suspended pending installation of
formal scheme
Stuart Crescent, Hayes 21-Sep-00 Botwell Enforcement suspended pending installation of
formal scheme
Sullivan Crescent,
Harefield
04-Feb-91 Harefield Formal scheme with signs and lines
Summerhouse Lane,
Harmondsworth
26-Feb-96 Heathrow
Villages
Enforcement suspended pending installation of
formal scheme
Sutherland Avenue,
Hayes
29-Apr-91 Botwell Formal scheme with signs and lines
Sycamore Avenue, Hayes 29-Apr-91 Botwell Formal scheme with signs and lines
Temple Park, Hillingdon 20-Sep-01 Brunel Enforcement suspended pending installation of
formal scheme
David Knowles, May 2025
Page27
Street Date scheme
approved14
Ward
(old ward names)
Comments
Thackeray Close,
Hillingdon
04-Jan-05 Yiewsley Enforcement suspended pending consideration of
a petition by the Cabinet Member for Planning and
Transportation.
The Crescent, Harlington 01-Apr-89 Heathrow
Villages
Formal scheme with signs and lines
The Dingle, Hillingdon 09-Feb-91 Hillingdon
East
Formal scheme with signs and lines
The Furrows, Harefield 04-Feb-91 Harefield Formal scheme with signs and lines
The Glebe, West Drayton 04-Aug-97 Heathrow
Villages
Enforcement suspended pending installation of
formal scheme
The Green, West Drayton 18-Aug-05 West Drayton Enforcement suspended pending installation of
formal scheme
The Larches, Hillingdon 01-Oct-96 Hillingdon
East
Formal scheme with signs and lines
The Oaks , Hayes 15-Jan-07 Hillingdon
East
Enforcement suspended pending installation of
formal scheme
Thorton Avenue, West
Drayton
25-Feb-05 West Drayton Enforcement suspended pending installation of
formal scheme, exemption only valid between
junction of Bell Avenue and East Road
Tiptree Road Ruislip 05-Dec-05 South Ruislip Enforcement suspended pending installation of
formal scheme
Towers Avenue,
Hillingdon
09-Sep-99 Hillingdon
East
Enforcement suspended pending installation of
formal scheme
Townfield Road, Hayes 26-Nov-98 Townfield Enforcement suspended pending installation of
formal scheme
Tudor Square, Hayes 21-Sep-00 Botwell Enforcement suspended pending installation of
formal scheme
Uxbridge Road, Hillingdon 23-Mar-92 Barnhill Formal scheme with signs and lines
Vincent Close, Sipson 19-Sep-96 Heathrow
Villages
Enforcement suspended pending installation of
formal scheme
Violet Avenue, Hillingdon 20-Jan-95 Yiewsley Formal scheme with signs and lines
Warley Avenue, Hayes 01-Nov-89 Barnhill Formal scheme with signs and lines
Warley Road, Hayes 01-Nov-89 Barnhill Formal scheme with signs and lines
Warwick Crescent, Hayes 06-Jan-89 Charville Formal scheme with signs and lines
Waverley Close, Hayes 16-Nov-99 Pinkwell Enforcement suspended pending installation of
formal scheme
Waylands, Hayes 28-Aug-02 Botwell Enforcement suspended pending installation of
formal scheme, INCLUDING FOR VEHICLES
OVER 1525kg.
Weald Road, Hillingdon 20-Sep-01 Uxbridge
North
Enforcement suspended pending installation of
formal scheme
Wentworth Crescent,
Hayes
01-Apr-89 Pinkwell Formal scheme with signs and lines
West Avenue, Hayes 04-Feb-91 Townfield Formal scheme with signs and lines
West Drayton Road,
Hillingdon
20-Nov-90 Botwell Enforcement suspended pending installation of
formal scheme
Westacott, Hayes 20-Jun-96 Charville Enforcement suspended pending installation of
formal scheme
Westcott Way, Uxbridge 10-Mar-99 Uxbridge
South
Enforcement suspended pending installation of
formal scheme
Westwood Close, Ruislip 23-Jun-04 West Ruislip Enforcement suspended AT THE EASTERN END
OF WESTWOOD CLOSE ON THE SW & SE
SIDES OF THE CENTRAL GRASSED AREA
pending installation of formal scheme
David Knowles, May 2025
Page28
Street Date scheme
approved14
Ward
(old ward names)
Comments
White Heart Avenue,
Hillingdon
04-Feb-91 Brunel Formal scheme with signs and lines
Whitethorn Avenue,
Yiewsley
01-Nov-89 Yiewsley Formal scheme with signs and lines
Whittington Avenue,
Hayes
02-Nov-88 Barnhill Formal scheme with signs and lines
Willow Avenue, Yiewsley 09-Sep-93 Yiewsley Enforcement suspended pending installation of
formal scheme
Willow Tree Lane, Hayes 11-Mar-97 Yeading Enforcement suspended pending installation of
formal scheme
Wilmar Close, Hayes 11-Mar-97 Charville Enforcement suspended pending installation of
formal scheme
Winchester Road,
Harlington
20-Nov-01 Heathrow
Villages
Enforcement suspended pending installation of
formal scheme
Windsor Avenue,
Hillingdon
13-Nov-97 Hillingdon
East
Enforcement suspended pending installation of
formal scheme
Windsor Close,
Northwood
09-Sep-99 Northwood
Hills
Enforcement suspended pending installation of
formal scheme
Windsor Gardens, Hayes 06-Jan-89 Pinkwell Formal scheme with signs and lines
Windsor Park Road,
Harlington
01-Nov-89 Heathrow
Villages
Formal scheme with signs and lines
Wolfe Close, Hayes 16-Jul-98 Barnhill Enforcement suspended pending installation of
formal scheme
Wooburn Close, Hayes 18-Oct-95 Brunel Enforcement suspended pending installation of
formal scheme
Wood End Green Road,
Hayes
TBA Botwell Enforcement suspended pending installation of
formal scheme
Wood Stock Gardens,
Hayes
06-Jan-84 Charville Formal scheme with signs and lines
Woodcroft Crescent,
Hillingdon
26-Nov-98 Hillingdon
East
Enforcement suspended pending installation of
formal scheme
Woodhouse Close, Hayes 15-Jan-07 Pinkwell Enforcement suspended pending installation of
formal scheme
Woodrow Avenue, Hayes 01-Dec-88 Charville Formal scheme with signs and lines
Wrays Way, Hayes 01-Nov-89 Charville Formal scheme with signs and lines
Wyteleaf Close, Ruislip 19-Sep-96 West Ruislip Enforcement suspended pending installation of
formal scheme
Yeading Lane, Hayes 11-Mar-97 Barnhill Enforcement suspended pending installation of
formal scheme, INCLUDING IN THE SERVICE
ROAD ADJACENT TO THE SHOPS
York Avenue, Hayes 01-Mar-01 Botwell Enforcement suspended pending installation of
formal scheme
Text extracted automatically from the PDF, so layout, tables and images are not shown. Open the original PDF on LB Hillingdon’s website.