Central & South Planning Committee - 13th July 2010
PART 1 - MEMBERS, PUBLIC & PRESS
STOCKLEY PARK PHASE 3 IRON BRIDGE ROAD WEST DRAYTON
Mixed use development comprising 25,000 sq.m office space (Class B1),
26,000 sq.m / 450-room hotel, including leisure facilities and energy centre
(min 3 star) (Class C1), 18,135 sq.m data centre (Sui Generis), a single
storey car parking building (Sui Generis) 3,500 sq.m mixed use building
accommodating office (Class B1), non-residential institution including art
exhibition space (Class D1), retail (Class A1), financial and professional
services (Class A2), cafés and restaurants (Class A3) and associated car
parking and landscaping (Outline application for full details for access.)
25/09/2009
Report of the Head of Planning & Enforcement
Address
Development:
LBH Ref Nos: 37977/APP/2009/2079
Drawing Nos: KAJL1001_103 REV 7_0 (PLOT AND BUILDING LAYOUT)
KAJL1001_104 REV 8_0 (ZONES OF USE)
KAJL1001_105 REV 6_0 (SCALE PARAMETERS)
KAJL1001_106 REV 7_0 (LANDSCAPE AND OPEN SPACE)
KAJL1001_107 REV 8_0 (ACCESS AND CIRCULATION)
Planning & Consultation Statement Prepared by Turley Associates dated
September 2009
Design and Access Statement Prepared by Arup
Energy Statement Prepared by Arup dated 04/09/09
Sustainability Statement Prepared by Turley Associates dated September
2009
Interim Travel Plan Prepared by Arup dated 18/09/09
Hotel Sequential Assessment Prepared by Turley Associates and Jones
Lang Lasalle dated September 2009
Environmental Statement Volume 1: Main Text Prepared by Arup dated
01/09/09
Environmental Statement Volume 2: Appendices Prepared by Arup
Environmental Statement Volume 3: Non-Technical Summary Prepared by
Arup dated 24/09/09
Energy Letter 208544/A.R Prepared by Arup dated 25/3/2010
Energy Letter 208544/N.R Prepared by Arup dated 27 November 2009
Date Plans Received: 25/09/2009
27/11/2009
25/03/2010
Date(s) of Amendment(s):
1. SUMMARY
This application seeks outline planning permission for a mixed use development
comprising a total floor area of 72,635m² on land identified as Phase 3 of Stockley Par k,
West Drayton. Details of access are under consideration with details of appearance,
layout, scale and landscaping reserved for future consideration. Indicative details for
layout, scale and landscaping have been provided.
The proposal would comprise 7 building plots, which would contain the following uses:
Plot 1: 7,500m² offices (B1)
Plot 2: 10,000m² offices (B1)
Plot 3: 18,135m² data centre (sui-generis)
25/09/2009 Date Application Valid:
Central & South Planning Committee - 13th July 2010
PART 1 - MEMBERS, PUBLIC & PRESS
Plot 4: 7,500m² Offices (B1)
Plot 5: 26,000m² (450 room) hotel (C1)
Plot 6: 3,500m² mixed use building comprising A1, A2, A3, B1 and D1 uses
Plot 7: Single storey car park structure
The site is known as Phase 3 of Stockley Park, and is partially located withi n the Green
Belt; additionally a portion of the site is designated as an Industrial and Business A rea
(IBA).
With regard to development proposed in the Green Belt, it should be noted that planning
permission was granted to develop the site for office uses in 2000. That earlier sc heme
set out the very special circumstances which justified development in the Green Bel t;
these circumstances were accepted by both the Council and the Secretary of State and
still exist. Importantly, the 2000 permission has been given effect to onsite w ith all
engineering, roads, and landscaping having been established on the site.
The previous planning permission issued in 2000, together with further extant planning
permissions relating to reserved matters applications are material planning
considerations relevant to the current scheme.
The earlier extant 2000 permission identified five plots within which five buildings were to
be sited. The floor areas within each plot varied between 8,000m² to 14,000m² in area
and ranged between 3 to 5 storeys in height. The orientation of the buildings was
directed towards the Horton Road roundabout, with the 3rd plot forming the focal point of
a formal composition of four buildings, with the massing of each adjoining building
progressively being stepped down from five to three storeys in height.
The site layout proposed in the current scheme has evolved from this extant 2000
planning permission and, the new units are proposed to be located in roughly the same
layout as the original master plan, and large areas of the site are to be dedicated to
landscaping.
There is no objection in principle to the introduction of a hotel use within that part of the
site designated as an Industrial and Business Area (IBA) in that a significant am ount of
B1 office space is also proposed within the wider site. There is no objection to t he siting,
size, bulk and height of the proposed buildings.
The proposed development is considered to deliver a high quality scheme which would
be in keeping with the character and appearance of the existing Phases 1 and 2 of
Stockley Park. Very Special Circumstances have been demonstrated to justify i ts
location within the Green Belt, including the significant employment and economic
benefits it would have for this part of West Drayton and the wider area. The scheme is
considered to be visually acceptable and is considered to comply with relevant London
Plan and UDP policies and, accordingly, approval is recommended.
2.
RECOMMENDATION
1. That the application be referred to the Greater London Authority (under Article 5
of the Town and Country Planning (Mayor of London) Order 2008) and the
Government Office For London.
2. That subject to the Secretary of State not calling in the application and the
Mayor not directing the Council under Article 6 of the Town and Country Planning
(Mayor of London) Order 2008 to refuse the application, or under Article 7 of the
Central & South Planning Committee - 13th July 2010
PART 1 - MEMBERS, PUBLIC & PRESS
Order that he is to act as the local planning authority for the purpose of
determining the application, delegated powers be given to the Director of Planning
and Community Services to grant planning permission, subject to any relevant
amendments requested by the Government Office for London or the Greater
London Authority and the following:
a) That the Council enters into an agreement with the applicant under Section 106
of the Town and Country Planning Act 1990 (as amended) and/or Section 278 of
the Highways Act 1980 (as amended) and/ or other appropriate legislation to
secure:
1. LANDSCAPING WORKS /PUBLIC REALM IMPROVEMENTS
1.1 Landscaping of land formerly known as Land Parcel A, now known as Land
Parcels 2-5;
1.2 Landscaping of land formerly known as Land Parcel B, now known as Land
Parcels 1c, 1 d and 9. The freehold of this land is to be transferred to LBH once the
works are complete;
1.3 Landscaping of land at Packet Boat Lane and a contribution towards
maintenance of the site to ensure public access is maintained. The freehold of this
land is to be transferred to LBH once the works are complete;
1.4 Undertake works or provide a contribution to a value not less than £150,000
for the provision of public realm /public art within the application site.
1.5 A contribution of £207,000 towards enhancements and maintenance of areas
of publicly accessible open space in the vicinity of the application site.
2. TRAINING
2.1 Construction and Employment Training: A contribution towards construction
training , as well as contribution towards cost of a construction training co-
ordinator, and also an employment training contribution. Total sum required being
£372,418;
2.2 Hotel and Leisure Training: a contribution of £30,000;
2.3 Local Education Initiatives: a contribution of £50,000 to be shared between
Brunel University and Uxbridge College.
3. CANAL AND CANAL SIDE WORKS
3.1 The provision of two 24hour canal side moorings;
3.2 A contribution of £200,000 towards improvements along the canal towpath
adjoining the Phase 3 site;
3.3) A contribution towards maintenance of the tow path;
3.4) A contribution in the sum of £15,000 towards British waterways Water space
strategy and its implementation;
3.5) Carry out work or make financial contribution towards works along tow path
as required by TfL (value not to exceed £1,200).
4 AIR QUALITY
4.1) A contribution in the sum of £25,000 for the air quality monitoring and
management.
5. PUBLIC TRANSPORT
5.1 A contribution of £320,000 towards improvements in public transport and for
upgrading of bus stops.
5.2 £500,000 to fund studies and works to improve traffic flows and public
Central & South Planning Committee - 13th July 2010
PART 1 - MEMBERS, PUBLIC & PRESS
OUT1 Time Limit- outline planning application
The development hereby permitted shall begin either before the expiration of five years
1
transport, off site highways improvements and traffic calming measures.
6. OFF SITE HIGHWAYS WORKS
6.1 Creation of the new site access (priority junction, north end of site);
6.2 Creation of new proposed roundabout (northwest of site on Horton Road);
6.3 Provision of a pedestrian crossing from the site to near by bus stops;
6.4 Upgrading the uncontrolled pedestrian crossing facilities at the existing
Horton Road/Ironbridge roundabout;
7. HORTON ROAD INTERCHANGE (STOCKLEY RD/HORTON RD/BEN NETSFIELD
RD)
7.1 Undertake a study (to be submitted to and approved by the Council) which
examines of the need for pedestrian crossings cross each approach road leading
into/from the roundabout. Carry out any works identified in the study as being
necessary.
7.2 Undertake a study (to be submitted to and approved by the Council) of the
Horton Road interchange which examines the need for capacity enhancements
(including the need for traffic signals) made necessary by the development. Carry
out any works identified in the study as being necessary.
8. 10 YEAR TRAVEL PLAN TO TFL GUIDELINES. Measures to include linking the
scheme to the Heathrow Hotels Hoppa bus service or an equivalent bus service
from the hotel to the airport terminals.
9. PROJECT MANAGEMENT AND MONITORING FEE
9.1 A contribution equal to 5% of the total cash contributions secured under the
scheme to enable the management and monitoring of the resulting agreement.
b) That in respect of the application for planning permission, the applicant meets
the Council's reasonable costs in preparation of the Section 106 Agreement and
any abortive work as a result of the agreement not being completed.
c) That officers be authorised to negotiate and agree the detailed terms of the
proposed agreement.
d) That if any of the heads of terms set out above have not been agreed and the
S106 legal agreement has not been finalised within 6 months of the date of this
committee resolution, or any other period deemed appropriate by the Director of
Planning and Community Services, then the application may be referred back to
the Committee for determination.
e) That subject to the above, the application be deferred for determination by the
Director of Planning and Community Services under delegated powers, subject to
the completion of the legal agreement under Section 106 of the Town and Country
Planning Act 1990 and other appropriate powers with the applicant.
f) That if the application is approved, the following conditions be imposed:
Central & South Planning Committee - 13th July 2010
PART 1 - MEMBERS, PUBLIC & PRESS
OUT2
OUT3
Reserved matters - submission
Approval of Details
from the date of this permission, or before the expiration of two years from the dat e of
approval of the last of the reserved matters to be approved, whichever is the later.
REASON
To comply with Section 92 of the Town and Country Planning Act 1990 (As Amended)
Application for approval of the following reserved matters shall be made to the Local
Planning Authority before the expiry of three years from the date of this permissi on: -
(a) Layout
(b) Scale
(c) Appearance
(d) Landscaping
REASON
To comply with Section 92 of the Town and Country Planning Act 1990 (As Amended).
Approval of the details of the landscaping, layout, scale and appearance of individual
phases of the development (hereinafter called the reserved matters) shall be obtained in
writing from the Local Planning Authority for each phase of development, before
development of that phase is commenced.
For each phase, the detailed drawings and supporting documentation to be submitted
shall, as part of the reserved matters, incorporate the following:
(i) Traffic and car parking arrangements, including electric vehicle charging points, the
means of ingress and egress, roundabouts and new road junctions, the closure of
existing access (where appropriate), visibility splays, the phasing of any cons truction
work and construction traffic signage, a construction logistics plan and constr uction
method statement,
(ii) A delivery and servicing plan, to include details of the parking, turning, loading and
unloading arrangements,
(iii) The means of construction and surfacing of all roads, drives, parking areas cycle
ways and footpaths,
(iv) The use, surface treatment and landscaping of all open areas not occupied by
buildings or roads, including the provision for protected areas of landscaping and planting
from accidental damage by vehicles,
(v) Hard and soft landscaping plans,
(vi) Plans of the site showing the existing and proposed ground levels and the proposed
finished height of all proposed buildings. Such levels shall be shown in relation to a f ixed
and know ordinance datum point,
(vii) Full plans and elevations of all buildings and any other structures, incorporati ng
details of all materials to be used for external surfaces, including samples of al l such
materials,
(viii) Plans and elevations of all boundary treatment and incorporation of full details of
height and materials,
(ix) Details of secure cycle storage, changing facilities, lockers and s howers for staff and
visitors to the development,
(x) A demolition and construction management plan including a method statement,
(xi) Plans and details which demonstrate the design and internal layout of buildings and
external areas are inclusive and accessible to all persons, including persons with
2
3
Central & South Planning Committee - 13th July 2010
PART 1 - MEMBERS, PUBLIC & PRESS
NONSC Phasing
disabilities.
(xii) Plans and details of proposed energy centre(s) and associated technology including
biomass boilers, Photovoltaic panels, CHP systems (sized to the average combined
space heating and domestic hot water thermal demand of the development) and the like.
(xiii) Bird Hazard Management Plan.
REASON
To comply with Section 91 of the Town and Country Planning Act 1990 (As Amended),
and
(i), (ii), and (iii) To ensure pedestrian and vehicular safety and the free flow of traffic and
conditions of general safety within the site and on the local highway network in
accordance with Policies AM7, AM9, and AM14 of the Hillingdon Unitary Development
Plan Saved Polices (September 2007),
(iv) To ensure the appearance of the locality is protected in accordance with Policies BE
13 and BE38 of the Hillingdon Unitary Development Plan Saved Polices (September
2007),
(v) To ensure the Local Planning Authority is able to assess the amenity value of ex isting
trees, hedges and shrubs and the impact of the proposed development on them, to
ensure the site is adequately landscaped and to accord with Policy BE38 of the
Hillingdon Unitary Development Plan Saved Polices (September 2007),
(vi) To ensure the development relates satisfactorily to adjoining Green Belt land and
other properties in accordance with Policies OL5 and BE13 of the Hillingdon Unitary
Development Plan Saved Polices (September 2007),
(vii) To ensure the development presents a satisfactory appearance and to safeguard the
visual amenities of the area in accordance with Policy BE13 of the Hillingdon Unit ary
Development Plan Saved Polices (September 2007),
(viii) To provide a safe and secure environment in accordance with Policies 4B.1 and
4B.6 of the London Plan (February 2008),
(ix) To ensure adequate facilities are provided for cyclists in accordance with Policy AM9
of the Hillingdon Unitary Development Plan Saved Polices (September 2007),
(x) To safeguard the amenity of the surrounding area in accordance with Policy OE1 of
the Hillingdon Unitary Development Plan Saved Polices (September 2007),
(xi) To ensure disabled persons are provided with adequate facilities and access to the
development in accordance with Policies AM13 and R16 of the Hillingdon Unitary
Development Plan Saved Policies (September 2007) and London Plan Policies (February
2008) Policies 3A.13, 3A.17 and 4B.5.
(xii) To provide on site renewable energy and reduce carbon emissions in accordance
with Policy 4A.7 of the London Plan (February 2008).
(xiii) To protect Aircraft safety in accordance with Policy A6 of the H illingdon Unitary
Development Plan Saved Polices (September 2007).
Before commencement of any development, a detailed phasing and implementation plan,
including the order and timing of development of individual buildings, landscaped and car
parking areas within each phase, shall be submitted to and approved in writing by the
Local Planning Authority.
REASON
To ensure the development proceeds in a satisfactory manner and to accord with Policy
LE2and BE38 of the Hillingdon Unitary Development Plan Saved Policies (September
2007).
4
Central & South Planning Committee - 13th July 2010
PART 1 - MEMBERS, PUBLIC & PRESS
OM1
NONSC
NONSC
NONSC
Development in accordance with Approved Plans
Boundary treatment
Traffic and cycle arrangements
Parking/turning/loading/ unloading
Not withstanding any illustrative information contained in supporting documentation, the
development shall not be carried out otherwise than in strict accordance with the plans
hereby approved:
KAJL1001_103 REV 7_0 (PLOT AND BUILDING LAYOUT)
KAJL1001_104 REV 8_0 (ZONES OF USE)
KAJL1001_105 REV 6_0 (SCALE PARAMETERS)
KAJL1001_106 REV 7_0 (LANDSCAPE AND OPEN SPACE)
KAJL1001_107 REV 8_0 (ACCESS AND CIRCULATION)
Unless consent to any variation is first obtained in writing from the Local Pl anning
Authority.
REASON
To ensure that the external appearance of the development is satisfactory and to protect
the visual amenities of the Green Belt and to accord with Policies BE13 and OL1, OL2,
and OL5 of the Hillingdon Unitary Development Plan Saved Policies (September 2007).
The boundary treatment for each phase of development approved in compliance with
Condition 3(viii) shall be provided before occupation of any of the buildings approved in
the relevant phase or within such longer periods as the Local Planning Authority may
agree in writing. The boundary treatment shall thereafter be retained and maintained for
so long as the development remains in existence.
REASON
To safeguard the visual amenities of the area in accordance with Policy BE13 of the
Hillingdon Unitary Development Plan Saved Policies (September 2007).
The access and traffic arrangements approved in compliance with Condition 3(i), and
cycle storage facilities approved in compliance with Condition 3(ix) shall be prov ided
before that part of the development is occupied or brought into use, or within such longer
periods as the Local Planning Authority may agree in writing.
Thereafter, they shall be retained and maintained for so long as the development
remains in existence.
REASON
To ensure that adequate facilities exist to serve the development and ensure the
provision and retention of facilities for cyclists to the development and hence the
availability of sustainable forms of transport to the site in accordance with Pol icy AM9 of
the Hillingdon Unitary Development Plan Saved Polices (September 2007) and Chapter
3C of the London Plan (February 2008).
The parking/turning/loading/unloading facilities approved in compliance with Condition
3(ii) shall accord with the Local Planning Authority standards and shall be provided
before the development of each phase is occupied, or brought into use, or within such
5
6
7
8
Central & South Planning Committee - 13th July 2010
PART 1 - MEMBERS, PUBLIC & PRESS
NONSC
NONSC
Surfacing and landscaping
Landscape plan for each phase
longer period as the Local Planning Authority may agree in writing. Thereafter, they shall
be retained for so long as the development remains in existence.
REASON
To ensure that adequate facilities are provided and retained to service the development
without creating conditions prejudicial to the free flow of traffic in accordance with
Policies AM3 and AM14 of the Hillingdon Unitary Development Plan Saved Policies
(September 2007).
All surfacing and landscaping agreed in compliance with Condition 3(iv) for each phase
of the development shall be provided before occupation of the buildings in the relevant
phase or during the first planting season following such occupation.
REASON
To fulfil the objectives of Green Belt enhancement and to enhance the visual amenities of
the development and its impact on the locality, and to ensure the development conforms
with Policy BE38 of the Hillingdon Unitary Development Plan Saved Policies (S eptember
2007).
The detailed landscape plan for each phase approved in compliance with Condition 3(v)
shall include:-
(i) An accurate survey plan at a scale of not less than 1:200, showing:-
(a) Species, position, height, condition, vigour, age-class, branch spread and st em
diameter of all existing trees, shrubs and hedges on and immediately adjoining the site.
(b) A clear indication of trees, hedges and shrubs to be retained and removed.
(c) Routes of any existing or proposed underground works and overhead lines including
their manner of construction.
(ii) Detailed drawings showing the position and type of fencing to protect the entir e root
areas/crown spread of trees, hedges and other vegetation to be retained.
(iii) Planting plans (at not less than a scale of 1:100),
(iv) Written specification of planting and cultivation works to be undertaken,
(v) Schedule of plants giving species, plant sizes, and proposed numbers/densities
where appropriate,
(vi) Implementation programme,
(vii) Proposed finishing levels or contours,
(viii) Means of enclosure,
(ix) Car parking layouts (including landscaping around car parking areas),
(x) Other vehicle and pedestrian access and circulation areas,
(xi) Hard surfacing materials proposed,
(xii) Minor artefacts and structures (such as play equipment, furniture, refus e storage,
signs, or lighting),
(xiii) Existing and proposed functional services above and below ground (e.g. drainage,
power cables or communications equipment, indicating lines, manholes or associated
structures),
(xiv) Retained historic landscape features and proposals for their restoration where
relevant.
(xv) A schedule of landscape maintenance for a minimum period of 5 years. The
9
10
Central & South Planning Committee - 13th July 2010
PART 1 - MEMBERS, PUBLIC & PRESS
TL6
NONSC
Landscaping scheme - implementation
Phasing of landscape works
maintenance scheme shall include details of the arrangements for its implementation.
REASON
To ensure that the proposed development will preserve and enhance the visual amenities
of the locality and to ensure that the approved landscaping is properly maintained in
accordance with policy BE38 of the Hillingdon Unitary Development Plan Saved Polici es
(September 2007).
All hard and soft landscaping shall be carried out in accordance the detailed landscape
plans for each phase, and shall be completed within the first planting and seeding
seasons following the completion of the relevant phase of development or the occupation
of the buildings completed in the relevant phase, whichever is the earlier period.
The new planting and landscape operations should comply with the requirements
specified in BS 3936 (1992) 'Nursery Stock, Part 1, Specification for Trees and Shrubs'
and in BS 4428 (1989) 'Code of Practice for General Landscape Operations (Excluding
Hard Surfaces)'. Thereafter, the areas of hard and soft landscaping shall be permanently
retained.
Any tree, shrub or area of turfing or seeding shown on the approved landscaping scheme
which within a period of 5 years from the completion of development dies, is removed or
in the opinion of the Local Planning Authority becomes seriously damaged or diseased
shall be replaced in the same place in the next planting season with another such tree,
shrub or area of turfing or seeding of similar size and species unless the Local Pl anning
Authority first gives written consent to any variation.
REASON
To ensure that the landscaped areas are laid out and retained in accordance with the
approved plans in order to preserve and enhance the visual amenities of the locality in
compliance with policy BE38 of the Hillingdon Unitary Development Plan Saved Polic ies
(September 2007).
Not withstanding any illustrative information contained in supporting documentation:
The landscape areas shown on Drawing KAJL1001_106 Rev 7 as the 'Woodland',
'Gateway' and 'The Wilderness' shall be completed within the first planting and seeding
seasons following the completion or occupation of the building approved on Plot 1,
whichever is the earlier period.
The landscape areas shown on Drawing KAJL1001_106 Rev 7 as the 'The Wilderness'
and 'The Park' shall be completed within the first planting and seeding seasons followi ng
the completion or occupation of the building approved on Plot 2, whichever is the earlier
period.
The landscape areas shown on Drawing KAJL1001_106 Rev 7 as the 'The Wilderness',
'The Park' and 'Canal Side' shall be completed within the first planting and seeding
seasons following the completion or occupation of the building approved on Plot 3,
whichever is the earlier period.
11
12
Central & South Planning Committee - 13th July 2010
PART 1 - MEMBERS, PUBLIC & PRESS
NONSC Height, floor space, width and length
The landscape areas shown on Drawing KAJL1001_106 Rev 7 as the 'The Park' and
'Canal Side' shall be completed within the first planting and seeding seasons following
the completion or occupation of the building approved on Plot 4, whichever is the earlier
period.
The landscape areas shown on Drawing KAJL1001_106 Rev 7 as the 'Lakeside', 'Canal
Side' and 'Hotel Court' shall be completed within the first planting and seeding seasons
following the completion or occupation of the building approved on Plot 5, whichever is
the earlier period.
The landscape areas shown on Drawing KAJL1001_106 Rev 7 as the 'Woodland',
'Gateway' and 'Hotel Court' shall be completed within the first planting and seeding
seasons following the completion or occupation of the building approved on Plot 6,
whichever is the earlier period.
The landscape areas shown on Drawing KAJL1001_106 Rev 7 as the 'Canalside' shall
be completed within the first planting and seeding seasons following the completion or
occupation of the building approved on Plot 7, whichever is the earlier period.
REASON
To ensure that the landscaped areas are laid out in accordance with the approved plans
in order to preserve and enhance the visual amenities of the locality in compliance with
policy BE38 of the Hillingdon Unitary Development Plan Saved Policies (September
2007).
The proposed floor area/size and heights of any buildings or structures parts of building s
or structures identified on Parameters Plan KAJL1001_105 Rev 6_0, including any plant
and equipment, shall not exceed the following:
Plot 1: 7,500sqm up to 4 storeys (max 54m AOD)
Plot 2: 10,000sqm up to 4 storeys (max 57.5m AOD)
Plot 3: 18,1385sqm up to 6 storeys (max 62 AOD)
Plot 4: 7,500sqm up to 4 storeys (max 57.5m AOD)
Plot 5: 26,000sqm between 3 and 8 storeys (max 62m AOD),
Plot 6: 3,500sqm up to 4 storeys (max 54m AOD)
Plot 7: car parking building maximum 256 spaces 1 storey
Glazed pavilion (northwest corner) 1 storey.
Not withstanding any illustrative information contained in supporting documentation, the
siting, maximum and minimum width and length of any buildings shall accord with
Parameters Plan KAJL1001_105 Rev 6_0, unless otherwise agreed in writing by the
Local Planning Authority.
REASON
i) To prevent over development of the site, to ensure that the scale and massing of the
buildings are appropriate to their setting, to comply with the terms of the applic ation and
to accord with Policy BE13 of the Hillingdon Unitary Development Plan Saved Poli cies
(September 2007),
ii) To safeguard the visual amenities of the Green Belt and to accord with Polici es OL1,
OL2 and OL5 of the Hillingdon Unitary Development Plan Saved Policies (September
2007) and to accord with London Plan (February 2008) Policy 4B.1.
13
Central & South Planning Committee - 13th July 2010
PART 1 - MEMBERS, PUBLIC & PRESS
DIS1
DIS3
DIS4
Facilities for People with Disabilities
Parking for Wheelchair Disabled People
Signposting for People with Disabilities
The plans and details relating to disabled access and facilities approved in compliance
with Condition 3(xi) shall ensure that:
(i) The proposed 450 room hotel is designed to be fully accessible in accordance with BS
8300:2009 and incorporating horizontal evacuation and evacuation lifts as detailed in BS
9999:2008, and a minimum of 10 percent of the hotel rooms are to be designed for wheel
chair accessible, compliant with BS8300 Figure 59,
(ii) All areas to which the public have access are designed to achieve, where feasibl e, a
gradient no steeper than 1:60,
(iii) Level access is provided to all buildings
(iv) Building entrances (including level approaches, signposting, types and dimensions of
door width and lobby openings) meet the needs of disabled persons,
(v) All buildings, including their approach designed in accordance with BS 8300:2009,
(vi) External areas, including landscaped areas designed to be inclusive.
The facilities approved in compliance with Condition 3(xi) shall be provided prior to the
occupation of each relevant phase of development and shall be permanently retained
thereafter.
REASON
To ensure that people with disabilities have adequate access to the development and to
ensure adequate facilities are provided for people with disabilities in accordance with
Policies AM13 and R16 of the Hillingdon Unitary Development Plan Saved Policies
(September 2007) and London Plan Policies (February 2008) Policies 3A.13, 3A.17 and
4B.5.
Development of individual phases of development shall not commence until details of
parking provision for wheelchair users for the relevant phase, have been submitted to
and approved in writing by the Local Planning Authority. The approved facilities shall be
provided prior to occupation of the relevant phase of development and shall be
permanently retained thereafter.
REASON
To ensure that people in wheelchairs are provided with adequate car parking and
convenient access to building entrances in accordance with Policy AM5 of the Hilli ngdon
Unitary Development Plan Saved Policies (September 2007).
Signplates, incorporating a representation of the Universal Wheelchair Symbol, should
be displayed to indicate the location of convenient facilities to meet the needs of people
with disabilities. Such signplates should identify or advertise accessible entr ances to
buildings, reserved parking spaces, accessible lifts and lavatory accommodation,
manageable routes through buildings and availability of additional services. Signs for
direction and location should have large characters or numerals and clearly contrast wit h
the background colour.
REASON
To ensure that people with disabilities are aware of the location of convenient faciliti es in
accordance with Policy AM13 of the Hillingdon Unitary Development Plan Saved Polic ies
14
15
16
Central & South Planning Committee - 13th July 2010
PART 1 - MEMBERS, PUBLIC & PRESS
NONSC
NONSC
NONSC
NONSC
Biosmass boiler
Fuel used in biomass boiler
Maintenance of biomass boiler
Noise from biomass boiler
(September 2007).
Any biomass boiler approved in compliance with Condition 3 (xii) shall not be install ed
until a scheme which specifies the provisions to be made for the control of air poll utants
from the site has been submitted to and approved by the Local Planning Authority. The
scheme shall include such combination of measures as may be approved by the Local
Planning Authority. The said scheme shall include such secure provision as will ens ure
that the said scheme and all of it endures for use and that any and all constituent parts
are repaired and maintained and replaced in whole or in part so often as occasion may
require.
REASON
To safeguard the amenities of the surrounding area and to accord with Policy OE1 of the
Hillingdon Unitary Development Plan Saved Policies (September 2007).
Any biomass boiler approved in compliance with Condition 3 (xii) shall only be operated
using clean biomass fuel that complies with a recognised fuel standard (such as CEN /TS
14961:2005). A written guarantee shall be submitted to the Local Planning Authority prior
to the commencement of the development with a declaration that biomass fuel
conforming to a recognised fuel quality will be used in the biomass boiler. A st atement
shall be submitted to the Local Planning Authority specifying the fuel specificati ons in
accordance with CEN/TS 14961:2005 or a similar recognised standard. (The statement
shall be obtained from the fuel supplier).
REASON
To safeguard the amenities of the surrounding area in accordance with Policy OE1 of the
Hillingdon Unitary Development Plan Saved Policies (September 2007).
Before any biomass boiler approved in compliance with Condition 3 (xii) is installed at the
site, a written schedule of maintenance, which shall include removal of ash, inspecti on
and maintenance of particulate arrestment equipment, boiler servicing and stack cleaning
has been provided to and approved in writing by the Local Planning Authority.
REASON
To safeguard the amenities of the surrounding area and to accord with Policy OE1 of the
Hillingdon Unitary Development Plan Saved Policies (September 2007).
The rating level of noise emitted from any biomass boiler plant hereby approved shall be
at least 5 dB below the existing background noise level. The noise levels shall be
determined at the nearest residential property. The measurements and assessment shall
be made in accordance with British Standard 4142 'Method for rating industrial noise
affecting mixed residential and industrial areas'.
REASON
To prevent harm to the amenity of surrounding areas due to noise in accordance with
Policy OE1 of the Hillingdon Unitary Development Plan Saved Policies (September
17
18
19
20
Central & South Planning Committee - 13th July 2010
PART 1 - MEMBERS, PUBLIC & PRESS
NONSC
N12
N11
NONSC
Air quality
Air extraction system - noise and odour
Control of plant/machinery noise
Phasing of car parking
2007).
For each phase of the development, any traffic management proposals for mitigation of
the impact of the development must be accompanied by an (air quality) assessment of
their environmental benefits. The said traffic schemes must also be monitored, for a
specified time to be agreed by the Local Planning Authority, both pre and post operation,
to ensure the proposed scheme is effective.
REASON
To protect air quality in accordance with Policy OE1 of the Hillingdon Unitar y
Development Plan Saved Policies (September 2007).
No air extraction system shall be used on the premises until a scheme for the contr ol of
noise and odour emanating from the site has been submitted to and approved in writing
by the Local Planning Authority. The approved scheme shall then be fully implemented
before the development is occupied/the use commences and thereafter shall be retained
and maintained in good working order for so long as the building remains in use.
REASON
To safeguard the amenity of the occupants of surrounding properties in accordance with
policy OE1 of the Hillingdon Unitary Development Plan Saved Policies (September 2007)
and Policy 4A.20 of the London Plan (February 2008).
No plant and or machinery shall be used on the premises until a scheme for the control
of noise emanating from the site has been submitted to and approved in writing by the
Local Planning Authority. The scheme shall be fully implemented before the
development is occupied and thereafter shall be retained and maintained in good working
order for so long as the building remains in use.
REASON
To safeguard the amenity of the surrounding area in accordance with Policy OE1 of the
Hillingdon Unitary Development Plan Saved Policies (September 2007) and Policy 4A.20
of the London Plan (February 2008).
Car parking arrangements approved in compliance with Condition 3(i) shall demonstrate
that parking provision is commensurate with the scale of development completed in each
phase, and shall ensure:
(i) Following completion of the building approved on Plot 1, not more than 150 additional
car parking spaces are provided on the site.
(ii) Following the completion of the building approved on Plot 2, not more than 200
additional car parking spaces are provided on the site.
(iii) Following the completion of the building approved on Plot 3, not more than 94
additional car parking spaces are provided on the site.
(iv) Following the completion of the building approved on Plot 4, not more than 150
additional car parking spaces are provided on the site.
21
22
23
24
Central & South Planning Committee - 13th July 2010
PART 1 - MEMBERS, PUBLIC & PRESS
NONSC
OM19
Electric charging points
Construction Management Plan
(v) Following the completion of the building approved on Plot 5, not more than 210
additional car parking spaces are provided on the site.
(vi) Following the completion of the building approved on Plot 6, not more than 40
additional car parking spaces are provided on the site.
(vii) Following the completion of the building approved on Plot 7, not more than 256
additional car parking spaces are provided on the site.
Following completion of all buildings, no more than 1,100 car parking spaces are to be
provided on the site at any time.
REASON
To ensure that car parking provided on the site is commensurate with the proportion of
development occupied at the site and to accord with Policies AM7, AM9, and AM14 of the
Hillingdon Unitary Development Plan Saved Polices (September 2007).
Details of electric vehicle charging points approved in compliance with Condition 3 (i)
shall include the details of the installation (including location and type) of secure el ectric
vehicle charging points capable of charging multiple vehicles simultaneously withi n the
car park for each relevant phase and these shall be provided for at least 3 percent of car
parking spaces in each phase or a higher level, if supported by London Plan policies in
place at the time the condition is discharged. These shall be installed prior to occ upation
of the relevant phase and retained and maintained for the lifetime of the buildings in each
relevant phase thereafter.
REASON
To encourage sustainable travel and to comply with London Plan Policy 4A.3.
The demolition and construction management plan approved in compliance with
Condition 3(x) shall include:
(i) The phasing of development works
(ii) The hours during which development works will occur (please refer to inform ative 10
for maximum permitted working hours).
(iii) A programme to demonstrate that the most valuable or potentially contaminating
materials and fittings can be removed safely and intact for later re-use or process ing.
(iv)Measures to prevent mud and dirt tracking onto footways and adjoining roads
(including wheel washing facilities).
(v) Traffic management and access arrangements (vehicular and pedestrian) and
parking provisions for contractors during the development process (including measures
to reduce the numbers of construction vehicles accessing the site during peak hours).
(vi) Measures to reduce the impact of the development on local air quality and dust
through minimising emissions throughout the demolition and construction process.
(vii) The storage of demolition/construction materials on site.
The approved details shall be implemented and maintained throughout the duration of
the demolition and construction process.
REASON
To safeguard the amenity of surrounding areas in accordance with Policy OE1 of the
25
26
Central & South Planning Committee - 13th July 2010
PART 1 - MEMBERS, PUBLIC & PRESS
NONSC
NONSC
NONSC
NONSC
Safeguarding
Site survey and remediation scheme
Landfill Gas
Landfill gas mitigation
Hillingdon Unitary Development Plan (Saved Policies 2007).
For each phase of development, no building, structure or part of a building or structure
approved in compliance with Condition 3(vii) shall exceed 67.93m AOD.
REASON
Development exceeding this height would penetrate the Obstacle Limitation Surface
(OLS) surrounding Heathrow Airport and endanger aircraft movements and the safe
operation of the aerodrome, contrary to the aims of Policy A6 of the Hillingdon Unit ary
Development Plan Saved Policies (September 2007).
See advice Note 1. 'Safeguarding an overview' for further information (available at
wwww.aoa.org.uk/publications/safeguarding.asp).
Before commencement of any phase of this development a site survey to assess the
land contamination levels shall be carried out to the satisfaction of the Council and a
remediation scheme for removing or rendering innocuous all contaminates from the site
shall be submitted to and approved by the Local Planning Authority. The remediation
scheme shall include an assessment of the extent of site contamination and provide in
detail the remedial measures to be taken to avoid risk to the occupiers and environment
when the site is developed. All works which form part of this remediation schem e shall
be completed before any part of the development is occupied (unless otherwise agreed
in writing by the Local Planning Authority).
Any imported material i.e. soil shall be tested for contamination levels therein t o the
satisfaction of the Council.
REASON
To ensure that the occupants of the development are not subjected to any risks from soil
contamination in accordance with Policy OE11 of the Hillingdon Unitary Development
Plan Saved Policies (September 2007) and Policy 4A.33 of the London Plan (February
2008).
Before any phase of the development is commenced, the applicant shall carry out further
landfill gas monitoring and a landfill gas risk assessment at the development sit e. The
landfill gas monitoring shall include assessment of the areas below proposed buildings.
REASON
To fully clarify the current levels of any gas on the site from previously imported
construction waste or residual fill, and from gas potentially migrating from the adjacent
landfill north of Horton Road; and to accord with Policy OE11 of the Hillingdon Uni tary
Development Plan Saved Policies (September 2007) and Policy 4A.33 of the London
Plan (February 2008).
Before commencement of any phase of development, remediation measures identified
as being necessary to prevent gas ingress to any buildings proposed in the relevant
27
28
29
30
Central & South Planning Committee - 13th July 2010
PART 1 - MEMBERS, PUBLIC & PRESS
NONSC
NONSC
Preliminary risk assessment
Foul surface water
phase shall be installed to the satisfaction of the Local Planning Authority.
REASON
To mitigate any risk to the buildings and users of the site from landfill gas , and to ensure
that the occupants of the development are not subjected to any risks from gas in
accordance with Policy OE11 of the Hillingdon Unitary Development Plan Saved Polic ies
(September 2007) and Policy 4A.33 of the London Plan (February 2008).
Prior to commencement of any phase of the development, plans and details of a scheme
to deal with the risks associated with contamination of the site shall be submitt ed to and
approved in writing by the Local Planning Authority. The scheme shall include the
following:
(i) A preliminary risk assessment which has identified:
(a) all previous uses,
(b) potential contaminants associated with those uses,
(c) a conceptual model of the site indicating sources, pathways and receptors
(d) potentially unacceptable risks arising from contamination
(ii) A site investigation scheme, based on the findings of the preliminary ris k assessment
required in (i) of this condition. Site investigation scheme to provide inform ation for a
detailed assessment of risk to all receptors that may be affected, including those off site
(iii) An options appraisal and remediation strategy based on the site investigation r esults
and the detailed risk assessment required in (i) and (ii) of this condition and giv ing full
details of remediation measures required and how they are to be undertaken.
(iv) A verification plan providing details of the data that will be collected i n order to
demonstrate that the works set out in (iii) above complete and identify any requirement s
for longer term monitoring of pollutant linkages, maintenance and arrangements for
contingency action.
Any changes to these components require the express written consent of the Local
Planning Authority. The scheme shall be implemented as approved.
REASON
To ensure protection of controlled waters and users of the surrounding area in
compliance with Policy OE11 of the Hillingdon Unitary Development Plan Saved Poli cies
(September 2007).
Development for each phase shall not commence until a scheme to dispose of foul and
surface water has been submitted to and approved in writing by the Local Planning
Authority. The scheme shall be implemented as approved.
No infiltration of surface water drainage into the ground is permitted unless where i t has
been demonstrated that there is no resultant unacceptable risk to controlled waters.
REASON
To ensure protection of controlled waters and users of the surrounding area in
compliance with Policy OE11 of the Hillingdon Unitary Development Plan Saved Poli cies
(September 2007).
31
32
Central & South Planning Committee - 13th July 2010
PART 1 - MEMBERS, PUBLIC & PRESS
NONSC
N13
NONSC
Unknown contamination
Noise control
Bird Hazard Management Plan
If any potentially contaminated ground is found on the site during the development works
the developer shall carry out investigations and chemical testing of the potentially
contaminated ground. Any contaminated land shall be remediated (i.e. removed or
rendered innocuous) to the satisfaction of the Local Planning Authority. Copies of all
documentation relating to the aforementioned investigations and works including
chemical testing, the remediation scheme, the remedial works and the validation report
shall be submitted to and approved by the Local Planning Authority.
REASON
To protect future occupants and controlled waters from the risks of hitherto unknown
contamination in accordance with Policy OE11 of the Hillingdon Unitary Development
Plan Saved Policies (September 2007) and Policy 4A.33 of the London Plan (February
2008).
The development shall not begin until a scheme for the control of noise from vehicles
(entering and leaving the site) to the child care centre / day nursery has been submitt ed
to and approved in writing by the Local Planning Authority. The scheme shall be fully
implemented before the development is occupied/use commences and thereafter shall
be retained and maintained in good working order for so long as the building remains in
use.
REASON
To safeguard the amenity of the occupants of surrounding properties in accordance with
Policy OE1 of the Hillingdon Unitary Development Plan Saved Policies (September 2007)
and Policy 4A.20 of the London Plan (February 2008).
The Bird Hazard Management Plan approved in compliance with Condition 3(xiii) shall
include the following details:
- monitoring of any standing water within the site,
- sustainable urban drainage schemes (SUDS) compliant with Advice Note 6 - Bird
Hazards from SUDS (www.aoa.org.uk/publications/safegaurding.asp)
- management of any flat roofs within the site which may be attractive to nesti ng, roosting
or 'loafing' birds. The management plan shall comply with Advice Note 8 - Potent ial Bird
Hazards from Building Design (www.aoa.org.uk/publications/safegaurding.asp),
- reinstatement of grass areas
- maintenance of planted and landscaped areas, particularly in terms of the height and
species of plants that are allowed to grow,
- which waste materials can be brought on to the site,
- monitoring of waste imports,
- physical arrangement for collection and storage of putrescible waste,
- signs deterring people from feeding birds,
The Bird hazard management plan shall be implemented as approved when construction
begins for any phase and shall remain in force for the life of the buildings. No
subsequent alterations to the plan are to take place unless first submitted to and
approved in writing by the Local Planning Authority.
33
34
35
Central & South Planning Committee - 13th July 2010
PART 1 - MEMBERS, PUBLIC & PRESS
NONSC
NONSC
NONSC
OM14
Height limitation landscaping
Potential Bird hazard from landscaping
Health and safety during construction
Secured by Design
REASON
To comply with Policy A6 of the Hillingdon Unitary Development Plan Saved Poli cies
(September 2007) and to minimise the attractiveness of the development to birds which
could endanger the safe movement of aircraft and the operation of Heathrow Airport.
No existing individual trees, shrubs, or stands of trees or shrubs and no trees and s hrubs
planted on the application site as part of the approved landscaping scheme shall be
permitted to grow above a height of 67.93 AOD.
REASON
To ensure trees or shrubs do not penetrate the Obstacle Limitation Surface (OLS)
surrounding Heathrow Airport and endanger the movements of aircraft and the safe
operation of the aerodrome and to accord with Policy A6 of the Hillingdon Unitary
Development Plan Saved Policies (September 2007).
The detailed landscape plan for each phase approved in compliance with Condition 3(vi)
shall comply with Advice Note 3, 'Potential Bird Hazards from Amenity Landsc aping and
Building Design (www.aoa.org.uk/publications/safegaurding.asp).
REASON
To comply with Policy A6 of the Hillingdon Unitary Development Plan Saved Poli cies
(September 2007) and to minimise the attractiveness of the development to birds which
could endanger the safe movement of aircraft and the operation of Heathrow Airport.
Prior to the commencement of each phase of the development a Risk Assessment and
Method Statement outlining all works to be carried out adjacent to the Grand Union Canal
must be submitted to and approved in writing by the Local Planning Authority. The ris k
assessment shall also include details of the proposed safety equipment along the canal
frontage, which shall be installed prior to first occupation of the development herby
permitted.
REASON
To ensure the safety of workers and the public during development in compliance with
the Construction (Design management) Regulations 1994, and to accord with Blue
Ribbon Network Policies 3C.25 & 4C.8 of the Consolidated London Plan, 2008.
For each phase of development hereby approved, a scheme shall be submitted to and
approved in writing by the Local Planning Authority which sets out the measures, whi ch
shall include lighting and CCTV, to minimise the risk of crime and to meet the specific
security needs of the application site and the development. Details of security measures
shall ensure vehicles are prevented from being able to be parked against the buildings,
and in particular the data centre. Details shall be submitted and approved in writing by
the Local Planning Authority before development of each phase commences. Any
security measures to be implemented in compliance with this condition shall reach the
36
37
38
39
Central & South Planning Committee - 13th July 2010
PART 1 - MEMBERS, PUBLIC & PRESS
NONSC
NONSC
SUS5
Freight
Flood risk
Sustainable Urban Drainage
standard necessary to achieve the 'Secured by Design' accreditation awarded by the
Hillingdon Metropolitan Police Crime Prevention Design Adviser (CPDA) on behalf of the
Association of Chief Police Officers (ACPO).
REASON
In pursuance of the Council's duty under section 17 of the Crime and Disorder Act 1998
to consider crime and disorder implications in excising its planning functions; to promote
the well being of the area in pursuance of the Council's powers under section 2 of the
Local Government Act 2000, to reflect the guidance contained in the Council's SPG on
Community Safety By Design and to ensure the development provides a safe and secure
environment in accordance with policies 4B.1 and 4B.6 of the London Plan.
Before any phase of development is commenced, a feasibility study shall be carried out
to assess the potential for moving freight by water during the construction cyc le (waste
and bulk materials) and following occupation of the development (waste and recyclables).
The use of waterborne transport shall be maximised during the construction of the
development unless the above assessment demonstrates that such use of the canal is
not physically or economically feasible.
REASON
To encourage the use of the canal for transporting waste and bulk materials in
accordance with Blue Ribbon Network Policies 3C.25 & 4C.8 of the London Plan
(February 2008).
The development permitted by this planning permission shall only be carried out in
accordance with the approved Flood Risk Assessment (FRA) dated 24 September 2009
and the following mitigation measures detailed within these documents:
(i) Limiting the surface water run-off generated by the 1 in 100 year plus climate change
critical storm so that there is at least a 50% reduction in run-off from the existing site
discharge rate of 1099l/s and no increase to the risk of flooding off-site.
REASON
To ensure the development does not increase the risk of flooding in accordance with
Policy OE8 of the Hillingdon Unitary Development Plan Saved Policies (September
2007), Polices 4A.12 and 4A.13 of the London Plan (February 2008) and PPS25.
No development shall take place on site until details of the incorporation of (where
(following contamination investigation works) it is feasible) sustainable urban dr ainage
have been submitted to, and approved in writing by the Local Planning Authority. The
approved details shall thereafter be installed on site and thereafter permanently retained
and maintained.
REASON
To ensure that surface water run off is handled as close to its source as possible i n
compliance with policy 4A.14 of the London Plan (February 2008) and to ensure the
development does not increase the risk of flooding in compliance with Policy OE8 of the
40
41
42
Central & South Planning Committee - 13th July 2010
PART 1 - MEMBERS, PUBLIC & PRESS
NONSC
NONSC
NONSC
NONSC
Refuse and recycling
Storage of plant and equipment
Deliveries
Water recycling
Hillingdon Unitary Development Plan Saved Policies (September 2007), polices 4A.12
and 4A.13 of the London Plan (February 2008) and PPS25.
Prior to commencement of each phase of the development, details shall be submitted to
and approved by the Local Planning Authority of covered, secure, signposted refuse and
recycling storage areas/facilities for that phase. The storage areas shall be c ompleted
and available for use for each phase of development prior to the first occupation of any of
that phase. These facilities shall not thereafter be obstructed or used for any other
purpose except with the prior permission of the local planning authority obtained through
the submission of a planning application.
REASON
To ensure appropriate refuse and recycling facilities are provided and retained in the
interests of the amenities of the occupiers of the proposed development and the visual
and general amenities of the locality and in accordance with Policy OE3 of the Hill ingdon
Unitary Development Plan Saved Policies (September 2007).
There shall be no storage of plant, machines or other materials outside buildings unless
adequately screened. No such storage shall commence until details of the screening
have been submitted to and approved in writing by the Local Planning Authority.
REASON
The Local Planning Authority considers it necessary to safeguard visual amenity, hav ing
regard to the Green Belt setting of the proposed development in accordance with Policies
OL1 and OL3.
The site shall not be used for delivery and the loading or unloading of goods or fuel
(including fuel for any biomass boiler) outside the hours of '08:00 to 18:00 hours
Mondays to Fridays, 08:00 to 13:00 Saturdays and at no time on Sundays, Bank or
Public holidays.
REASON
To prevent harm to the amenity of surrounding areas due to noise in accordance with
Policy OE1 of the Hillingdon Unitary Development Plan Saved Policies (September
2007).
Prior to commencement of the development hereby approved details demonstrating the
incorporation of either rainwater greywater recycling facilities into each of t he buildings
shall be submitted to and approved in writing by the Local Planning Authority. The
approved facilities shall thereafter be installed, maintained and retained for the lifetim e of
the building.
REASON
In order to provide a sustainable form of development and promote water conservation in
43
44
45
46
Central & South Planning Committee - 13th July 2010
PART 1 - MEMBERS, PUBLIC & PRESS
NONSC
NONSC
NONSC
Control of lights
Energy
Pathways and access
compliance with Policies 4A.3 and 4A.16 of the London Plan 2008.
The lighting of the buildings shall employ devices that automatically turn the li ghts off
when the rooms are not in use.
REASON
In the interests of energy conservation, in accordance with Policy 4A.3 of the London
Plan.
Unless other wise agreed in writing by the Local Planning Authority, the plans and det ails
of proposed energy centre(s) and associated technology including biomass boilers,
Photovoltaic panels, CHP systems and the like for each phase of development, required
to be provided in accordance with Condition 3(xii), shall include a combined heat and
power plant (sized to the average combined space heating and domestic hot water
thermal demand of the development) and the areas of photovoltaic panels proposed, and
shall accord with the energy Statement prepared by Arup (04/09/2009) and
supplementary letters prepared by ARUP (208544/N.R. dated 27 November 2009 and
208544.AR. dated 25 March 2010) and where feasible, should demonstrate that the
infrastructure would be compatible with any potential future district heating network s, and
should safeguard the potential future connection to such a network. For each relevant
phase, the approved details shall be implemented prior to the occupation of buildings in
the relevant phase and thereafter permanently retained and maintained.
REASON
To ensure an appropriate proportion of the development's energy needs are from on-site
renewable energy sources in compliance with the requirements of Policy 4A.7 of the
London Plan 2008.
No part of the development shall be commenced until plans have been submitted to and
approved in writing by the Local Planning Authority showing in respect of all developm ent
within the application site the following:
i) Those areas within the site over which the public are to have an unimpeded
right of access and those areas over which the public are to have a discretionary acces s;
ii) The network of footpaths and pedestrian ways throughout the site s pecifying
those paths and ways over which the public are to have an unimpeded right of access
and those paths and ways over which the public are to have a discretionary access;
iii) The programme for the commencement and completion of landscaping f or the
public and canal side open space;
iv) The sequence of development within the site
Text extracted automatically from the PDF, so layout, tables and images are not shown. Only the start of this long document is shown here. Open the original PDF on LB Hillingdon’s website.
Read the text of: Printed minutes PDF 94 KB (66 pages)
Central & South Planning Committee - 13th July 2010
PART 1 - MEMBERS, PUBLIC & PRESS
STOCKLEY PARK PHASE 3 IRON BRIDGE ROAD WEST DRAYTON
Mixed use development comprising 25,000 sq.m office space (Class B1),
26,000 sq.m / 450-room hotel, including leisure facilities and energy centre
(min 3 star) (Class C1), 18,135 sq.m data centre (Sui Generis), a single
storey car parking building (Sui Generis) 3,500 sq.m mixed use building
accommodating office (Class B1), non-residential institution including art
exhibition space (Class D1), retail (Class A1), financial and professional
services (Class A2), cafés and restaurants (Class A3) and associated car
parking and landscaping (Outline application for full details for access.)
25/09/2009
Report of the Head of Planning & Enforcement
Address
Development:
LBH Ref Nos: 37977/APP/2009/2079
Drawing Nos: KAJL1001_103 REV 7_0 (PLOT AND BUILDING LAYOUT)
KAJL1001_104 REV 8_0 (ZONES OF USE)
KAJL1001_105 REV 6_0 (SCALE PARAMETERS)
KAJL1001_106 REV 7_0 (LANDSCAPE AND OPEN SPACE)
KAJL1001_107 REV 8_0 (ACCESS AND CIRCULATION)
Planning & Consultation Statement Prepared by Turley Associates dated
September 2009
Design and Access Statement Prepared by Arup
Energy Statement Prepared by Arup dated 04/09/09
Sustainability Statement Prepared by Turley Associates dated September
2009
Interim Travel Plan Prepared by Arup dated 18/09/09
Hotel Sequential Assessment Prepared by Turley Associates and Jones
Lang Lasalle dated September 2009
Environmental Statement Volume 1: Main Text Prepared by Arup dated
01/09/09
Environmental Statement Volume 2: Appendices Prepared by Arup
Environmental Statement Volume 3: Non-Technical Summary Prepared by
Arup dated 24/09/09
Energy Letter 208544/A.R Prepared by Arup dated 25/3/2010
Energy Letter 208544/N.R Prepared by Arup dated 27 November 2009
Date Plans Received: 25/09/2009
27/11/2009
25/03/2010
Date(s) of Amendment(s):
1. SUMMARY
This application seeks outline planning permission for a mixed use development
comprising a total floor area of 72,635m² on land identified as Phase 3 of Stockley Par k,
West Drayton. Details of access are under consideration with details of appearance,
layout, scale and landscaping reserved for future consideration. Indicative details for
layout, scale and landscaping have been provided.
The proposal would comprise 7 building plots, which would contain the following uses:
Plot 1: 7,500m² offices (B1)
Plot 2: 10,000m² offices (B1)
Plot 3: 18,135m² data centre (sui-generis)
25/09/2009 Date Application Valid:
Central & South Planning Committee - 13th July 2010
PART 1 - MEMBERS, PUBLIC & PRESS
Plot 4: 7,500m² Offices (B1)
Plot 5: 26,000m² (450 room) hotel (C1)
Plot 6: 3,500m² mixed use building comprising A1, A2, A3, B1 and D1 uses
Plot 7: Single storey car park structure
The site is known as Phase 3 of Stockley Park, and is partially located withi n the Green
Belt; additionally a portion of the site is designated as an Industrial and Business A rea
(IBA).
With regard to development proposed in the Green Belt, it should be noted that planning
permission was granted to develop the site for office uses in 2000. That earlier sc heme
set out the very special circumstances which justified development in the Green Bel t;
these circumstances were accepted by both the Council and the Secretary of State and
still exist. Importantly, the 2000 permission has been given effect to onsite w ith all
engineering, roads, and landscaping having been established on the site.
The previous planning permission issued in 2000, together with further extant planning
permissions relating to reserved matters applications are material planning
considerations relevant to the current scheme.
The earlier extant 2000 permission identified five plots within which five buildings were to
be sited. The floor areas within each plot varied between 8,000m² to 14,000m² in area
and ranged between 3 to 5 storeys in height. The orientation of the buildings was
directed towards the Horton Road roundabout, with the 3rd plot forming the focal point of
a formal composition of four buildings, with the massing of each adjoining building
progressively being stepped down from five to three storeys in height.
The site layout proposed in the current scheme has evolved from this extant 2000
planning permission and, the new units are proposed to be located in roughly the same
layout as the original master plan, and large areas of the site are to be dedicated to
landscaping.
There is no objection in principle to the introduction of a hotel use within that part of the
site designated as an Industrial and Business Area (IBA) in that a significant am ount of
B1 office space is also proposed within the wider site. There is no objection to t he siting,
size, bulk and height of the proposed buildings.
The proposed development is considered to deliver a high quality scheme which would
be in keeping with the character and appearance of the existing Phases 1 and 2 of
Stockley Park. Very Special Circumstances have been demonstrated to justify i ts
location within the Green Belt, including the significant employment and economic
benefits it would have for this part of West Drayton and the wider area. The scheme is
considered to be visually acceptable and is considered to comply with relevant London
Plan and UDP policies and, accordingly, approval is recommended.
2.
RECOMMENDATION
1. That the application be referred to the Greater London Authority (under Article 5
of the Town and Country Planning (Mayor of London) Order 2008) and the
Government Office For London.
2. That subject to the Secretary of State not calling in the application and the
Mayor not directing the Council under Article 6 of the Town and Country Planning
(Mayor of London) Order 2008 to refuse the application, or under Article 7 of the
Central & South Planning Committee - 13th July 2010
PART 1 - MEMBERS, PUBLIC & PRESS
Order that he is to act as the local planning authority for the purpose of
determining the application, delegated powers be given to the Director of Planning
and Community Services to grant planning permission, subject to any relevant
amendments requested by the Government Office for London or the Greater
London Authority and the following:
a) That the Council enters into an agreement with the applicant under Section 106
of the Town and Country Planning Act 1990 (as amended) and/or Section 278 of
the Highways Act 1980 (as amended) and/ or other appropriate legislation to
secure:
1. LANDSCAPING WORKS /PUBLIC REALM IMPROVEMENTS
1.1 Landscaping of land formerly known as Land Parcel A, now known as Land
Parcels 2-5;
1.2 Landscaping of land formerly known as Land Parcel B, now known as Land
Parcels 1c, 1 d and 9. The freehold of this land is to be transferred to LBH once the
works are complete;
1.3 Landscaping of land at Packet Boat Lane and a contribution towards
maintenance of the site to ensure public access is maintained. The freehold of this
land is to be transferred to LBH once the works are complete;
1.4 Undertake works or provide a contribution to a value not less than £150,000
for the provision of public realm /public art within the application site.
1.5 A contribution of £207,000 towards enhancements and maintenance of areas
of publicly accessible open space in the vicinity of the application site.
2. TRAINING
2.1 Construction and Employment Training: A contribution towards construction
training , as well as contribution towards cost of a construction training co-
ordinator, and also an employment training contribution. Total sum required being
£372,418;
2.2 Hotel and Leisure Training: a contribution of £30,000;
2.3 Local Education Initiatives: a contribution of £50,000 to be shared between
Brunel University and Uxbridge College.
3. CANAL AND CANAL SIDE WORKS
3.1 The provision of two 24hour canal side moorings;
3.2 A contribution of £200,000 towards improvements along the canal towpath
adjoining the Phase 3 site;
3.3) A contribution towards maintenance of the tow path;
3.4) A contribution in the sum of £15,000 towards British waterways Water space
strategy and its implementation;
3.5) Carry out work or make financial contribution towards works along tow path
as required by TfL (value not to exceed £1,200).
4 AIR QUALITY
4.1) A contribution in the sum of £25,000 for the air quality monitoring and
management.
5. PUBLIC TRANSPORT
5.1 A contribution of £320,000 towards improvements in public transport and for
upgrading of bus stops.
5.2 £500,000 to fund studies and works to improve traffic flows and public
Central & South Planning Committee - 13th July 2010
PART 1 - MEMBERS, PUBLIC & PRESS
OUT1 Time Limit- outline planning application
The development hereby permitted shall begin either before the expiration of five years
1
transport, off site highways improvements and traffic calming measures.
6. OFF SITE HIGHWAYS WORKS
6.1 Creation of the new site access (priority junction, north end of site);
6.2 Creation of new proposed roundabout (northwest of site on Horton Road);
6.3 Provision of a pedestrian crossing from the site to near by bus stops;
6.4 Upgrading the uncontrolled pedestrian crossing facilities at the existing
Horton Road/Ironbridge roundabout;
7. HORTON ROAD INTERCHANGE (STOCKLEY RD/HORTON RD/BEN NETSFIELD
RD)
7.1 Undertake a study (to be submitted to and approved by the Council) which
examines of the need for pedestrian crossings cross each approach road leading
into/from the roundabout. Carry out any works identified in the study as being
necessary.
7.2 Undertake a study (to be submitted to and approved by the Council) of the
Horton Road interchange which examines the need for capacity enhancements
(including the need for traffic signals) made necessary by the development. Carry
out any works identified in the study as being necessary.
8. 10 YEAR TRAVEL PLAN TO TFL GUIDELINES. Measures to include linking the
scheme to the Heathrow Hotels Hoppa bus service or an equivalent bus service
from the hotel to the airport terminals.
9. PROJECT MANAGEMENT AND MONITORING FEE
9.1 A contribution equal to 5% of the total cash contributions secured under the
scheme to enable the management and monitoring of the resulting agreement.
b) That in respect of the application for planning permission, the applicant meets
the Council's reasonable costs in preparation of the Section 106 Agreement and
any abortive work as a result of the agreement not being completed.
c) That officers be authorised to negotiate and agree the detailed terms of the
proposed agreement.
d) That if any of the heads of terms set out above have not been agreed and the
S106 legal agreement has not been finalised within 6 months of the date of this
committee resolution, or any other period deemed appropriate by the Director of
Planning and Community Services, then the application may be referred back to
the Committee for determination.
e) That subject to the above, the application be deferred for determination by the
Director of Planning and Community Services under delegated powers, subject to
the completion of the legal agreement under Section 106 of the Town and Country
Planning Act 1990 and other appropriate powers with the applicant.
f) That if the application is approved, the following conditions be imposed:
Central & South Planning Committee - 13th July 2010
PART 1 - MEMBERS, PUBLIC & PRESS
OUT2
OUT3
Reserved matters - submission
Approval of Details
from the date of this permission, or before the expiration of two years from the dat e of
approval of the last of the reserved matters to be approved, whichever is the later.
REASON
To comply with Section 92 of the Town and Country Planning Act 1990 (As Amended)
Application for approval of the following reserved matters shall be made to the Local
Planning Authority before the expiry of three years from the date of this permissi on: -
(a) Layout
(b) Scale
(c) Appearance
(d) Landscaping
REASON
To comply with Section 92 of the Town and Country Planning Act 1990 (As Amended).
Approval of the details of the landscaping, layout, scale and appearance of individual
phases of the development (hereinafter called the reserved matters) shall be obtained in
writing from the Local Planning Authority for each phase of development, before
development of that phase is commenced.
For each phase, the detailed drawings and supporting documentation to be submitted
shall, as part of the reserved matters, incorporate the following:
(i) Traffic and car parking arrangements, including electric vehicle charging points, the
means of ingress and egress, roundabouts and new road junctions, the closure of
existing access (where appropriate), visibility splays, the phasing of any cons truction
work and construction traffic signage, a construction logistics plan and constr uction
method statement,
(ii) A delivery and servicing plan, to include details of the parking, turning, loading and
unloading arrangements,
(iii) The means of construction and surfacing of all roads, drives, parking areas cycle
ways and footpaths,
(iv) The use, surface treatment and landscaping of all open areas not occupied by
buildings or roads, including the provision for protected areas of landscaping and planting
from accidental damage by vehicles,
(v) Hard and soft landscaping plans,
(vi) Plans of the site showing the existing and proposed ground levels and the proposed
finished height of all proposed buildings. Such levels shall be shown in relation to a f ixed
and know ordinance datum point,
(vii) Full plans and elevations of all buildings and any other structures, incorporati ng
details of all materials to be used for external surfaces, including samples of al l such
materials,
(viii) Plans and elevations of all boundary treatment and incorporation of full details of
height and materials,
(ix) Details of secure cycle storage, changing facilities, lockers and s howers for staff and
visitors to the development,
(x) A demolition and construction management plan including a method statement,
(xi) Plans and details which demonstrate the design and internal layout of buildings and
external areas are inclusive and accessible to all persons, including persons with
2
3
Central & South Planning Committee - 13th July 2010
PART 1 - MEMBERS, PUBLIC & PRESS
NONSC Phasing
disabilities.
(xii) Plans and details of proposed energy centre(s) and associated technology including
biomass boilers, Photovoltaic panels, CHP systems (sized to the average combined
space heating and domestic hot water thermal demand of the development) and the like.
(xiii) Bird Hazard Management Plan.
REASON
To comply with Section 91 of the Town and Country Planning Act 1990 (As Amended),
and
(i), (ii), and (iii) To ensure pedestrian and vehicular safety and the free flow of traffic and
conditions of general safety within the site and on the local highway network in
accordance with Policies AM7, AM9, and AM14 of the Hillingdon Unitary Development
Plan Saved Polices (September 2007),
(iv) To ensure the appearance of the locality is protected in accordance with Policies BE
13 and BE38 of the Hillingdon Unitary Development Plan Saved Polices (September
2007),
(v) To ensure the Local Planning Authority is able to assess the amenity value of ex isting
trees, hedges and shrubs and the impact of the proposed development on them, to
ensure the site is adequately landscaped and to accord with Policy BE38 of the
Hillingdon Unitary Development Plan Saved Polices (September 2007),
(vi) To ensure the development relates satisfactorily to adjoining Green Belt land and
other properties in accordance with Policies OL5 and BE13 of the Hillingdon Unitary
Development Plan Saved Polices (September 2007),
(vii) To ensure the development presents a satisfactory appearance and to safeguard the
visual amenities of the area in accordance with Policy BE13 of the Hillingdon Unit ary
Development Plan Saved Polices (September 2007),
(viii) To provide a safe and secure environment in accordance with Policies 4B.1 and
4B.6 of the London Plan (February 2008),
(ix) To ensure adequate facilities are provided for cyclists in accordance with Policy AM9
of the Hillingdon Unitary Development Plan Saved Polices (September 2007),
(x) To safeguard the amenity of the surrounding area in accordance with Policy OE1 of
the Hillingdon Unitary Development Plan Saved Polices (September 2007),
(xi) To ensure disabled persons are provided with adequate facilities and access to the
development in accordance with Policies AM13 and R16 of the Hillingdon Unitary
Development Plan Saved Policies (September 2007) and London Plan Policies (February
2008) Policies 3A.13, 3A.17 and 4B.5.
(xii) To provide on site renewable energy and reduce carbon emissions in accordance
with Policy 4A.7 of the London Plan (February 2008).
(xiii) To protect Aircraft safety in accordance with Policy A6 of the H illingdon Unitary
Development Plan Saved Polices (September 2007).
Before commencement of any development, a detailed phasing and implementation plan,
including the order and timing of development of individual buildings, landscaped and car
parking areas within each phase, shall be submitted to and approved in writing by the
Local Planning Authority.
REASON
To ensure the development proceeds in a satisfactory manner and to accord with Policy
LE2and BE38 of the Hillingdon Unitary Development Plan Saved Policies (September
2007).
4
Central & South Planning Committee - 13th July 2010
PART 1 - MEMBERS, PUBLIC & PRESS
OM1
NONSC
NONSC
NONSC
Development in accordance with Approved Plans
Boundary treatment
Traffic and cycle arrangements
Parking/turning/loading/ unloading
Not withstanding any illustrative information contained in supporting documentation, the
development shall not be carried out otherwise than in strict accordance with the plans
hereby approved:
KAJL1001_103 REV 7_0 (PLOT AND BUILDING LAYOUT)
KAJL1001_104 REV 8_0 (ZONES OF USE)
KAJL1001_105 REV 6_0 (SCALE PARAMETERS)
KAJL1001_106 REV 7_0 (LANDSCAPE AND OPEN SPACE)
KAJL1001_107 REV 8_0 (ACCESS AND CIRCULATION)
Unless consent to any variation is first obtained in writing from the Local Pl anning
Authority.
REASON
To ensure that the external appearance of the development is satisfactory and to protect
the visual amenities of the Green Belt and to accord with Policies BE13 and OL1, OL2,
and OL5 of the Hillingdon Unitary Development Plan Saved Policies (September 2007).
The boundary treatment for each phase of development approved in compliance with
Condition 3(viii) shall be provided before occupation of any of the buildings approved in
the relevant phase or within such longer periods as the Local Planning Authority may
agree in writing. The boundary treatment shall thereafter be retained and maintained for
so long as the development remains in existence.
REASON
To safeguard the visual amenities of the area in accordance with Policy BE13 of the
Hillingdon Unitary Development Plan Saved Policies (September 2007).
The access and traffic arrangements approved in compliance with Condition 3(i), and
cycle storage facilities approved in compliance with Condition 3(ix) shall be prov ided
before that part of the development is occupied or brought into use, or within such longer
periods as the Local Planning Authority may agree in writing.
Thereafter, they shall be retained and maintained for so long as the development
remains in existence.
REASON
To ensure that adequate facilities exist to serve the development and ensure the
provision and retention of facilities for cyclists to the development and hence the
availability of sustainable forms of transport to the site in accordance with Pol icy AM9 of
the Hillingdon Unitary Development Plan Saved Polices (September 2007) and Chapter
3C of the London Plan (February 2008).
The parking/turning/loading/unloading facilities approved in compliance with Condition
3(ii) shall accord with the Local Planning Authority standards and shall be provided
before the development of each phase is occupied, or brought into use, or within such
5
6
7
8
Central & South Planning Committee - 13th July 2010
PART 1 - MEMBERS, PUBLIC & PRESS
NONSC
NONSC
Surfacing and landscaping
Landscape plan for each phase
longer period as the Local Planning Authority may agree in writing. Thereafter, they shall
be retained for so long as the development remains in existence.
REASON
To ensure that adequate facilities are provided and retained to service the development
without creating conditions prejudicial to the free flow of traffic in accordance with
Policies AM3 and AM14 of the Hillingdon Unitary Development Plan Saved Policies
(September 2007).
All surfacing and landscaping agreed in compliance with Condition 3(iv) for each phase
of the development shall be provided before occupation of the buildings in the relevant
phase or during the first planting season following such occupation.
REASON
To fulfil the objectives of Green Belt enhancement and to enhance the visual amenities of
the development and its impact on the locality, and to ensure the development conforms
with Policy BE38 of the Hillingdon Unitary Development Plan Saved Policies (S eptember
2007).
The detailed landscape plan for each phase approved in compliance with Condition 3(v)
shall include:-
(i) An accurate survey plan at a scale of not less than 1:200, showing:-
(a) Species, position, height, condition, vigour, age-class, branch spread and st em
diameter of all existing trees, shrubs and hedges on and immediately adjoining the site.
(b) A clear indication of trees, hedges and shrubs to be retained and removed.
(c) Routes of any existing or proposed underground works and overhead lines including
their manner of construction.
(ii) Detailed drawings showing the position and type of fencing to protect the entir e root
areas/crown spread of trees, hedges and other vegetation to be retained.
(iii) Planting plans (at not less than a scale of 1:100),
(iv) Written specification of planting and cultivation works to be undertaken,
(v) Schedule of plants giving species, plant sizes, and proposed numbers/densities
where appropriate,
(vi) Implementation programme,
(vii) Proposed finishing levels or contours,
(viii) Means of enclosure,
(ix) Car parking layouts (including landscaping around car parking areas),
(x) Other vehicle and pedestrian access and circulation areas,
(xi) Hard surfacing materials proposed,
(xii) Minor artefacts and structures (such as play equipment, furniture, refus e storage,
signs, or lighting),
(xiii) Existing and proposed functional services above and below ground (e.g. drainage,
power cables or communications equipment, indicating lines, manholes or associated
structures),
(xiv) Retained historic landscape features and proposals for their restoration where
relevant.
(xv) A schedule of landscape maintenance for a minimum period of 5 years. The
9
10
Central & South Planning Committee - 13th July 2010
PART 1 - MEMBERS, PUBLIC & PRESS
TL6
NONSC
Landscaping scheme - implementation
Phasing of landscape works
maintenance scheme shall include details of the arrangements for its implementation.
REASON
To ensure that the proposed development will preserve and enhance the visual amenities
of the locality and to ensure that the approved landscaping is properly maintained in
accordance with policy BE38 of the Hillingdon Unitary Development Plan Saved Polici es
(September 2007).
All hard and soft landscaping shall be carried out in accordance the detailed landscape
plans for each phase, and shall be completed within the first planting and seeding
seasons following the completion of the relevant phase of development or the occupation
of the buildings completed in the relevant phase, whichever is the earlier period.
The new planting and landscape operations should comply with the requirements
specified in BS 3936 (1992) 'Nursery Stock, Part 1, Specification for Trees and Shrubs'
and in BS 4428 (1989) 'Code of Practice for General Landscape Operations (Excluding
Hard Surfaces)'. Thereafter, the areas of hard and soft landscaping shall be permanently
retained.
Any tree, shrub or area of turfing or seeding shown on the approved landscaping scheme
which within a period of 5 years from the completion of development dies, is removed or
in the opinion of the Local Planning Authority becomes seriously damaged or diseased
shall be replaced in the same place in the next planting season with another such tree,
shrub or area of turfing or seeding of similar size and species unless the Local Pl anning
Authority first gives written consent to any variation.
REASON
To ensure that the landscaped areas are laid out and retained in accordance with the
approved plans in order to preserve and enhance the visual amenities of the locality in
compliance with policy BE38 of the Hillingdon Unitary Development Plan Saved Polic ies
(September 2007).
Not withstanding any illustrative information contained in supporting documentation:
The landscape areas shown on Drawing KAJL1001_106 Rev 7 as the 'Woodland',
'Gateway' and 'The Wilderness' shall be completed within the first planting and seeding
seasons following the completion or occupation of the building approved on Plot 1,
whichever is the earlier period.
The landscape areas shown on Drawing KAJL1001_106 Rev 7 as the 'The Wilderness'
and 'The Park' shall be completed within the first planting and seeding seasons followi ng
the completion or occupation of the building approved on Plot 2, whichever is the earlier
period.
The landscape areas shown on Drawing KAJL1001_106 Rev 7 as the 'The Wilderness',
'The Park' and 'Canal Side' shall be completed within the first planting and seeding
seasons following the completion or occupation of the building approved on Plot 3,
whichever is the earlier period.
11
12
Central & South Planning Committee - 13th July 2010
PART 1 - MEMBERS, PUBLIC & PRESS
NONSC Height, floor space, width and length
The landscape areas shown on Drawing KAJL1001_106 Rev 7 as the 'The Park' and
'Canal Side' shall be completed within the first planting and seeding seasons following
the completion or occupation of the building approved on Plot 4, whichever is the earlier
period.
The landscape areas shown on Drawing KAJL1001_106 Rev 7 as the 'Lakeside', 'Canal
Side' and 'Hotel Court' shall be completed within the first planting and seeding seasons
following the completion or occupation of the building approved on Plot 5, whichever is
the earlier period.
The landscape areas shown on Drawing KAJL1001_106 Rev 7 as the 'Woodland',
'Gateway' and 'Hotel Court' shall be completed within the first planting and seeding
seasons following the completion or occupation of the building approved on Plot 6,
whichever is the earlier period.
The landscape areas shown on Drawing KAJL1001_106 Rev 7 as the 'Canalside' shall
be completed within the first planting and seeding seasons following the completion or
occupation of the building approved on Plot 7, whichever is the earlier period.
REASON
To ensure that the landscaped areas are laid out in accordance with the approved plans
in order to preserve and enhance the visual amenities of the locality in compliance with
policy BE38 of the Hillingdon Unitary Development Plan Saved Policies (September
2007).
The proposed floor area/size and heights of any buildings or structures parts of building s
or structures identified on Parameters Plan KAJL1001_105 Rev 6_0, including any plant
and equipment, shall not exceed the following:
Plot 1: 7,500sqm up to 4 storeys (max 54m AOD)
Plot 2: 10,000sqm up to 4 storeys (max 57.5m AOD)
Plot 3: 18,1385sqm up to 6 storeys (max 62 AOD)
Plot 4: 7,500sqm up to 4 storeys (max 57.5m AOD)
Plot 5: 26,000sqm between 3 and 8 storeys (max 62m AOD),
Plot 6: 3,500sqm up to 4 storeys (max 54m AOD)
Plot 7: car parking building maximum 256 spaces 1 storey
Glazed pavilion (northwest corner) 1 storey.
Not withstanding any illustrative information contained in supporting documentation, the
siting, maximum and minimum width and length of any buildings shall accord with
Parameters Plan KAJL1001_105 Rev 6_0, unless otherwise agreed in writing by the
Local Planning Authority.
REASON
i) To prevent over development of the site, to ensure that the scale and massing of the
buildings are appropriate to their setting, to comply with the terms of the applic ation and
to accord with Policy BE13 of the Hillingdon Unitary Development Plan Saved Poli cies
(September 2007),
ii) To safeguard the visual amenities of the Green Belt and to accord with Polici es OL1,
OL2 and OL5 of the Hillingdon Unitary Development Plan Saved Policies (September
2007) and to accord with London Plan (February 2008) Policy 4B.1.
13
Central & South Planning Committee - 13th July 2010
PART 1 - MEMBERS, PUBLIC & PRESS
DIS1
DIS3
DIS4
Facilities for People with Disabilities
Parking for Wheelchair Disabled People
Signposting for People with Disabilities
The plans and details relating to disabled access and facilities approved in compliance
with Condition 3(xi) shall ensure that:
(i) The proposed 450 room hotel is designed to be fully accessible in accordance with BS
8300:2009 and incorporating horizontal evacuation and evacuation lifts as detailed in BS
9999:2008, and a minimum of 10 percent of the hotel rooms are to be designed for wheel
chair accessible, compliant with BS8300 Figure 59,
(ii) All areas to which the public have access are designed to achieve, where feasibl e, a
gradient no steeper than 1:60,
(iii) Level access is provided to all buildings
(iv) Building entrances (including level approaches, signposting, types and dimensions of
door width and lobby openings) meet the needs of disabled persons,
(v) All buildings, including their approach designed in accordance with BS 8300:2009,
(vi) External areas, including landscaped areas designed to be inclusive.
The facilities approved in compliance with Condition 3(xi) shall be provided prior to the
occupation of each relevant phase of development and shall be permanently retained
thereafter.
REASON
To ensure that people with disabilities have adequate access to the development and to
ensure adequate facilities are provided for people with disabilities in accordance with
Policies AM13 and R16 of the Hillingdon Unitary Development Plan Saved Policies
(September 2007) and London Plan Policies (February 2008) Policies 3A.13, 3A.17 and
4B.5.
Development of individual phases of development shall not commence until details of
parking provision for wheelchair users for the relevant phase, have been submitted to
and approved in writing by the Local Planning Authority. The approved facilities shall be
provided prior to occupation of the relevant phase of development and shall be
permanently retained thereafter.
REASON
To ensure that people in wheelchairs are provided with adequate car parking and
convenient access to building entrances in accordance with Policy AM5 of the Hilli ngdon
Unitary Development Plan Saved Policies (September 2007).
Signplates, incorporating a representation of the Universal Wheelchair Symbol, should
be displayed to indicate the location of convenient facilities to meet the needs of people
with disabilities. Such signplates should identify or advertise accessible entr ances to
buildings, reserved parking spaces, accessible lifts and lavatory accommodation,
manageable routes through buildings and availability of additional services. Signs for
direction and location should have large characters or numerals and clearly contrast wit h
the background colour.
REASON
To ensure that people with disabilities are aware of the location of convenient faciliti es in
accordance with Policy AM13 of the Hillingdon Unitary Development Plan Saved Polic ies
14
15
16
Central & South Planning Committee - 13th July 2010
PART 1 - MEMBERS, PUBLIC & PRESS
NONSC
NONSC
NONSC
NONSC
Biosmass boiler
Fuel used in biomass boiler
Maintenance of biomass boiler
Noise from biomass boiler
(September 2007).
Any biomass boiler approved in compliance with Condition 3 (xii) shall not be install ed
until a scheme which specifies the provisions to be made for the control of air poll utants
from the site has been submitted to and approved by the Local Planning Authority. The
scheme shall include such combination of measures as may be approved by the Local
Planning Authority. The said scheme shall include such secure provision as will ens ure
that the said scheme and all of it endures for use and that any and all constituent parts
are repaired and maintained and replaced in whole or in part so often as occasion may
require.
REASON
To safeguard the amenities of the surrounding area and to accord with Policy OE1 of the
Hillingdon Unitary Development Plan Saved Policies (September 2007).
Any biomass boiler approved in compliance with Condition 3 (xii) shall only be operated
using clean biomass fuel that complies with a recognised fuel standard (such as CEN /TS
14961:2005). A written guarantee shall be submitted to the Local Planning Authority prior
to the commencement of the development with a declaration that biomass fuel
conforming to a recognised fuel quality will be used in the biomass boiler. A st atement
shall be submitted to the Local Planning Authority specifying the fuel specificati ons in
accordance with CEN/TS 14961:2005 or a similar recognised standard. (The statement
shall be obtained from the fuel supplier).
REASON
To safeguard the amenities of the surrounding area in accordance with Policy OE1 of the
Hillingdon Unitary Development Plan Saved Policies (September 2007).
Before any biomass boiler approved in compliance with Condition 3 (xii) is installed at the
site, a written schedule of maintenance, which shall include removal of ash, inspecti on
and maintenance of particulate arrestment equipment, boiler servicing and stack cleaning
has been provided to and approved in writing by the Local Planning Authority.
REASON
To safeguard the amenities of the surrounding area and to accord with Policy OE1 of the
Hillingdon Unitary Development Plan Saved Policies (September 2007).
The rating level of noise emitted from any biomass boiler plant hereby approved shall be
at least 5 dB below the existing background noise level. The noise levels shall be
determined at the nearest residential property. The measurements and assessment shall
be made in accordance with British Standard 4142 'Method for rating industrial noise
affecting mixed residential and industrial areas'.
REASON
To prevent harm to the amenity of surrounding areas due to noise in accordance with
Policy OE1 of the Hillingdon Unitary Development Plan Saved Policies (September
17
18
19
20
Central & South Planning Committee - 13th July 2010
PART 1 - MEMBERS, PUBLIC & PRESS
NONSC
N12
N11
NONSC
Air quality
Air extraction system - noise and odour
Control of plant/machinery noise
Phasing of car parking
2007).
For each phase of the development, any traffic management proposals for mitigation of
the impact of the development must be accompanied by an (air quality) assessment of
their environmental benefits. The said traffic schemes must also be monitored, for a
specified time to be agreed by the Local Planning Authority, both pre and post operation,
to ensure the proposed scheme is effective.
REASON
To protect air quality in accordance with Policy OE1 of the Hillingdon Unitar y
Development Plan Saved Policies (September 2007).
No air extraction system shall be used on the premises until a scheme for the contr ol of
noise and odour emanating from the site has been submitted to and approved in writing
by the Local Planning Authority. The approved scheme shall then be fully implemented
before the development is occupied/the use commences and thereafter shall be retained
and maintained in good working order for so long as the building remains in use.
REASON
To safeguard the amenity of the occupants of surrounding properties in accordance with
policy OE1 of the Hillingdon Unitary Development Plan Saved Policies (September 2007)
and Policy 4A.20 of the London Plan (February 2008).
No plant and or machinery shall be used on the premises until a scheme for the control
of noise emanating from the site has been submitted to and approved in writing by the
Local Planning Authority. The scheme shall be fully implemented before the
development is occupied and thereafter shall be retained and maintained in good working
order for so long as the building remains in use.
REASON
To safeguard the amenity of the surrounding area in accordance with Policy OE1 of the
Hillingdon Unitary Development Plan Saved Policies (September 2007) and Policy 4A.20
of the London Plan (February 2008).
Car parking arrangements approved in compliance with Condition 3(i) shall demonstrate
that parking provision is commensurate with the scale of development completed in each
phase, and shall ensure:
(i) Following completion of the building approved on Plot 1, not more than 150 additional
car parking spaces are provided on the site.
(ii) Following the completion of the building approved on Plot 2, not more than 200
additional car parking spaces are provided on the site.
(iii) Following the completion of the building approved on Plot 3, not more than 94
additional car parking spaces are provided on the site.
(iv) Following the completion of the building approved on Plot 4, not more than 150
additional car parking spaces are provided on the site.
21
22
23
24
Central & South Planning Committee - 13th July 2010
PART 1 - MEMBERS, PUBLIC & PRESS
NONSC
OM19
Electric charging points
Construction Management Plan
(v) Following the completion of the building approved on Plot 5, not more than 210
additional car parking spaces are provided on the site.
(vi) Following the completion of the building approved on Plot 6, not more than 40
additional car parking spaces are provided on the site.
(vii) Following the completion of the building approved on Plot 7, not more than 256
additional car parking spaces are provided on the site.
Following completion of all buildings, no more than 1,100 car parking spaces are to be
provided on the site at any time.
REASON
To ensure that car parking provided on the site is commensurate with the proportion of
development occupied at the site and to accord with Policies AM7, AM9, and AM14 of the
Hillingdon Unitary Development Plan Saved Polices (September 2007).
Details of electric vehicle charging points approved in compliance with Condition 3 (i)
shall include the details of the installation (including location and type) of secure el ectric
vehicle charging points capable of charging multiple vehicles simultaneously withi n the
car park for each relevant phase and these shall be provided for at least 3 percent of car
parking spaces in each phase or a higher level, if supported by London Plan policies in
place at the time the condition is discharged. These shall be installed prior to occ upation
of the relevant phase and retained and maintained for the lifetime of the buildings in each
relevant phase thereafter.
REASON
To encourage sustainable travel and to comply with London Plan Policy 4A.3.
The demolition and construction management plan approved in compliance with
Condition 3(x) shall include:
(i) The phasing of development works
(ii) The hours during which development works will occur (please refer to inform ative 10
for maximum permitted working hours).
(iii) A programme to demonstrate that the most valuable or potentially contaminating
materials and fittings can be removed safely and intact for later re-use or process ing.
(iv)Measures to prevent mud and dirt tracking onto footways and adjoining roads
(including wheel washing facilities).
(v) Traffic management and access arrangements (vehicular and pedestrian) and
parking provisions for contractors during the development process (including measures
to reduce the numbers of construction vehicles accessing the site during peak hours).
(vi) Measures to reduce the impact of the development on local air quality and dust
through minimising emissions throughout the demolition and construction process.
(vii) The storage of demolition/construction materials on site.
The approved details shall be implemented and maintained throughout the duration of
the demolition and construction process.
REASON
To safeguard the amenity of surrounding areas in accordance with Policy OE1 of the
25
26
Central & South Planning Committee - 13th July 2010
PART 1 - MEMBERS, PUBLIC & PRESS
NONSC
NONSC
NONSC
NONSC
Safeguarding
Site survey and remediation scheme
Landfill Gas
Landfill gas mitigation
Hillingdon Unitary Development Plan (Saved Policies 2007).
For each phase of development, no building, structure or part of a building or structure
approved in compliance with Condition 3(vii) shall exceed 67.93m AOD.
REASON
Development exceeding this height would penetrate the Obstacle Limitation Surface
(OLS) surrounding Heathrow Airport and endanger aircraft movements and the safe
operation of the aerodrome, contrary to the aims of Policy A6 of the Hillingdon Unit ary
Development Plan Saved Policies (September 2007).
See advice Note 1. 'Safeguarding an overview' for further information (available at
wwww.aoa.org.uk/publications/safeguarding.asp).
Before commencement of any phase of this development a site survey to assess the
land contamination levels shall be carried out to the satisfaction of the Council and a
remediation scheme for removing or rendering innocuous all contaminates from the site
shall be submitted to and approved by the Local Planning Authority. The remediation
scheme shall include an assessment of the extent of site contamination and provide in
detail the remedial measures to be taken to avoid risk to the occupiers and environment
when the site is developed. All works which form part of this remediation schem e shall
be completed before any part of the development is occupied (unless otherwise agreed
in writing by the Local Planning Authority).
Any imported material i.e. soil shall be tested for contamination levels therein t o the
satisfaction of the Council.
REASON
To ensure that the occupants of the development are not subjected to any risks from soil
contamination in accordance with Policy OE11 of the Hillingdon Unitary Development
Plan Saved Policies (September 2007) and Policy 4A.33 of the London Plan (February
2008).
Before any phase of the development is commenced, the applicant shall carry out further
landfill gas monitoring and a landfill gas risk assessment at the development sit e. The
landfill gas monitoring shall include assessment of the areas below proposed buildings.
REASON
To fully clarify the current levels of any gas on the site from previously imported
construction waste or residual fill, and from gas potentially migrating from the adjacent
landfill north of Horton Road; and to accord with Policy OE11 of the Hillingdon Uni tary
Development Plan Saved Policies (September 2007) and Policy 4A.33 of the London
Plan (February 2008).
Before commencement of any phase of development, remediation measures identified
as being necessary to prevent gas ingress to any buildings proposed in the relevant
27
28
29
30
Central & South Planning Committee - 13th July 2010
PART 1 - MEMBERS, PUBLIC & PRESS
NONSC
NONSC
Preliminary risk assessment
Foul surface water
phase shall be installed to the satisfaction of the Local Planning Authority.
REASON
To mitigate any risk to the buildings and users of the site from landfill gas , and to ensure
that the occupants of the development are not subjected to any risks from gas in
accordance with Policy OE11 of the Hillingdon Unitary Development Plan Saved Polic ies
(September 2007) and Policy 4A.33 of the London Plan (February 2008).
Prior to commencement of any phase of the development, plans and details of a scheme
to deal with the risks associated with contamination of the site shall be submitt ed to and
approved in writing by the Local Planning Authority. The scheme shall include the
following:
(i) A preliminary risk assessment which has identified:
(a) all previous uses,
(b) potential contaminants associated with those uses,
(c) a conceptual model of the site indicating sources, pathways and receptors
(d) potentially unacceptable risks arising from contamination
(ii) A site investigation scheme, based on the findings of the preliminary ris k assessment
required in (i) of this condition. Site investigation scheme to provide inform ation for a
detailed assessment of risk to all receptors that may be affected, including those off site
(iii) An options appraisal and remediation strategy based on the site investigation r esults
and the detailed risk assessment required in (i) and (ii) of this condition and giv ing full
details of remediation measures required and how they are to be undertaken.
(iv) A verification plan providing details of the data that will be collected i n order to
demonstrate that the works set out in (iii) above complete and identify any requirement s
for longer term monitoring of pollutant linkages, maintenance and arrangements for
contingency action.
Any changes to these components require the express written consent of the Local
Planning Authority. The scheme shall be implemented as approved.
REASON
To ensure protection of controlled waters and users of the surrounding area in
compliance with Policy OE11 of the Hillingdon Unitary Development Plan Saved Poli cies
(September 2007).
Development for each phase shall not commence until a scheme to dispose of foul and
surface water has been submitted to and approved in writing by the Local Planning
Authority. The scheme shall be implemented as approved.
No infiltration of surface water drainage into the ground is permitted unless where i t has
been demonstrated that there is no resultant unacceptable risk to controlled waters.
REASON
To ensure protection of controlled waters and users of the surrounding area in
compliance with Policy OE11 of the Hillingdon Unitary Development Plan Saved Poli cies
(September 2007).
31
32
Central & South Planning Committee - 13th July 2010
PART 1 - MEMBERS, PUBLIC & PRESS
NONSC
N13
NONSC
Unknown contamination
Noise control
Bird Hazard Management Plan
If any potentially contaminated ground is found on the site during the development works
the developer shall carry out investigations and chemical testing of the potentially
contaminated ground. Any contaminated land shall be remediated (i.e. removed or
rendered innocuous) to the satisfaction of the Local Planning Authority. Copies of all
documentation relating to the aforementioned investigations and works including
chemical testing, the remediation scheme, the remedial works and the validation report
shall be submitted to and approved by the Local Planning Authority.
REASON
To protect future occupants and controlled waters from the risks of hitherto unknown
contamination in accordance with Policy OE11 of the Hillingdon Unitary Development
Plan Saved Policies (September 2007) and Policy 4A.33 of the London Plan (February
2008).
The development shall not begin until a scheme for the control of noise from vehicles
(entering and leaving the site) to the child care centre / day nursery has been submitt ed
to and approved in writing by the Local Planning Authority. The scheme shall be fully
implemented before the development is occupied/use commences and thereafter shall
be retained and maintained in good working order for so long as the building remains in
use.
REASON
To safeguard the amenity of the occupants of surrounding properties in accordance with
Policy OE1 of the Hillingdon Unitary Development Plan Saved Policies (September 2007)
and Policy 4A.20 of the London Plan (February 2008).
The Bird Hazard Management Plan approved in compliance with Condition 3(xiii) shall
include the following details:
- monitoring of any standing water within the site,
- sustainable urban drainage schemes (SUDS) compliant with Advice Note 6 - Bird
Hazards from SUDS (www.aoa.org.uk/publications/safegaurding.asp)
- management of any flat roofs within the site which may be attractive to nesti ng, roosting
or 'loafing' birds. The management plan shall comply with Advice Note 8 - Potent ial Bird
Hazards from Building Design (www.aoa.org.uk/publications/safegaurding.asp),
- reinstatement of grass areas
- maintenance of planted and landscaped areas, particularly in terms of the height and
species of plants that are allowed to grow,
- which waste materials can be brought on to the site,
- monitoring of waste imports,
- physical arrangement for collection and storage of putrescible waste,
- signs deterring people from feeding birds,
The Bird hazard management plan shall be implemented as approved when construction
begins for any phase and shall remain in force for the life of the buildings. No
subsequent alterations to the plan are to take place unless first submitted to and
approved in writing by the Local Planning Authority.
33
34
35
Central & South Planning Committee - 13th July 2010
PART 1 - MEMBERS, PUBLIC & PRESS
NONSC
NONSC
NONSC
OM14
Height limitation landscaping
Potential Bird hazard from landscaping
Health and safety during construction
Secured by Design
REASON
To comply with Policy A6 of the Hillingdon Unitary Development Plan Saved Poli cies
(September 2007) and to minimise the attractiveness of the development to birds which
could endanger the safe movement of aircraft and the operation of Heathrow Airport.
No existing individual trees, shrubs, or stands of trees or shrubs and no trees and s hrubs
planted on the application site as part of the approved landscaping scheme shall be
permitted to grow above a height of 67.93 AOD.
REASON
To ensure trees or shrubs do not penetrate the Obstacle Limitation Surface (OLS)
surrounding Heathrow Airport and endanger the movements of aircraft and the safe
operation of the aerodrome and to accord with Policy A6 of the Hillingdon Unitary
Development Plan Saved Policies (September 2007).
The detailed landscape plan for each phase approved in compliance with Condition 3(vi)
shall comply with Advice Note 3, 'Potential Bird Hazards from Amenity Landsc aping and
Building Design (www.aoa.org.uk/publications/safegaurding.asp).
REASON
To comply with Policy A6 of the Hillingdon Unitary Development Plan Saved Poli cies
(September 2007) and to minimise the attractiveness of the development to birds which
could endanger the safe movement of aircraft and the operation of Heathrow Airport.
Prior to the commencement of each phase of the development a Risk Assessment and
Method Statement outlining all works to be carried out adjacent to the Grand Union Canal
must be submitted to and approved in writing by the Local Planning Authority. The ris k
assessment shall also include details of the proposed safety equipment along the canal
frontage, which shall be installed prior to first occupation of the development herby
permitted.
REASON
To ensure the safety of workers and the public during development in compliance with
the Construction (Design management) Regulations 1994, and to accord with Blue
Ribbon Network Policies 3C.25 & 4C.8 of the Consolidated London Plan, 2008.
For each phase of development hereby approved, a scheme shall be submitted to and
approved in writing by the Local Planning Authority which sets out the measures, whi ch
shall include lighting and CCTV, to minimise the risk of crime and to meet the specific
security needs of the application site and the development. Details of security measures
shall ensure vehicles are prevented from being able to be parked against the buildings,
and in particular the data centre. Details shall be submitted and approved in writing by
the Local Planning Authority before development of each phase commences. Any
security measures to be implemented in compliance with this condition shall reach the
36
37
38
39
Central & South Planning Committee - 13th July 2010
PART 1 - MEMBERS, PUBLIC & PRESS
NONSC
NONSC
SUS5
Freight
Flood risk
Sustainable Urban Drainage
standard necessary to achieve the 'Secured by Design' accreditation awarded by the
Hillingdon Metropolitan Police Crime Prevention Design Adviser (CPDA) on behalf of the
Association of Chief Police Officers (ACPO).
REASON
In pursuance of the Council's duty under section 17 of the Crime and Disorder Act 1998
to consider crime and disorder implications in excising its planning functions; to promote
the well being of the area in pursuance of the Council's powers under section 2 of the
Local Government Act 2000, to reflect the guidance contained in the Council's SPG on
Community Safety By Design and to ensure the development provides a safe and secure
environment in accordance with policies 4B.1 and 4B.6 of the London Plan.
Before any phase of development is commenced, a feasibility study shall be carried out
to assess the potential for moving freight by water during the construction cyc le (waste
and bulk materials) and following occupation of the development (waste and recyclables).
The use of waterborne transport shall be maximised during the construction of the
development unless the above assessment demonstrates that such use of the canal is
not physically or economically feasible.
REASON
To encourage the use of the canal for transporting waste and bulk materials in
accordance with Blue Ribbon Network Policies 3C.25 & 4C.8 of the London Plan
(February 2008).
The development permitted by this planning permission shall only be carried out in
accordance with the approved Flood Risk Assessment (FRA) dated 24 September 2009
and the following mitigation measures detailed within these documents:
(i) Limiting the surface water run-off generated by the 1 in 100 year plus climate change
critical storm so that there is at least a 50% reduction in run-off from the existing site
discharge rate of 1099l/s and no increase to the risk of flooding off-site.
REASON
To ensure the development does not increase the risk of flooding in accordance with
Policy OE8 of the Hillingdon Unitary Development Plan Saved Policies (September
2007), Polices 4A.12 and 4A.13 of the London Plan (February 2008) and PPS25.
No development shall take place on site until details of the incorporation of (where
(following contamination investigation works) it is feasible) sustainable urban dr ainage
have been submitted to, and approved in writing by the Local Planning Authority. The
approved details shall thereafter be installed on site and thereafter permanently retained
and maintained.
REASON
To ensure that surface water run off is handled as close to its source as possible i n
compliance with policy 4A.14 of the London Plan (February 2008) and to ensure the
development does not increase the risk of flooding in compliance with Policy OE8 of the
40
41
42
Central & South Planning Committee - 13th July 2010
PART 1 - MEMBERS, PUBLIC & PRESS
NONSC
NONSC
NONSC
NONSC
Refuse and recycling
Storage of plant and equipment
Deliveries
Water recycling
Hillingdon Unitary Development Plan Saved Policies (September 2007), polices 4A.12
and 4A.13 of the London Plan (February 2008) and PPS25.
Prior to commencement of each phase of the development, details shall be submitted to
and approved by the Local Planning Authority of covered, secure, signposted refuse and
recycling storage areas/facilities for that phase. The storage areas shall be c ompleted
and available for use for each phase of development prior to the first occupation of any of
that phase. These facilities shall not thereafter be obstructed or used for any other
purpose except with the prior permission of the local planning authority obtained through
the submission of a planning application.
REASON
To ensure appropriate refuse and recycling facilities are provided and retained in the
interests of the amenities of the occupiers of the proposed development and the visual
and general amenities of the locality and in accordance with Policy OE3 of the Hill ingdon
Unitary Development Plan Saved Policies (September 2007).
There shall be no storage of plant, machines or other materials outside buildings unless
adequately screened. No such storage shall commence until details of the screening
have been submitted to and approved in writing by the Local Planning Authority.
REASON
The Local Planning Authority considers it necessary to safeguard visual amenity, hav ing
regard to the Green Belt setting of the proposed development in accordance with Policies
OL1 and OL3.
The site shall not be used for delivery and the loading or unloading of goods or fuel
(including fuel for any biomass boiler) outside the hours of '08:00 to 18:00 hours
Mondays to Fridays, 08:00 to 13:00 Saturdays and at no time on Sundays, Bank or
Public holidays.
REASON
To prevent harm to the amenity of surrounding areas due to noise in accordance with
Policy OE1 of the Hillingdon Unitary Development Plan Saved Policies (September
2007).
Prior to commencement of the development hereby approved details demonstrating the
incorporation of either rainwater greywater recycling facilities into each of t he buildings
shall be submitted to and approved in writing by the Local Planning Authority. The
approved facilities shall thereafter be installed, maintained and retained for the lifetim e of
the building.
REASON
In order to provide a sustainable form of development and promote water conservation in
43
44
45
46
Central & South Planning Committee - 13th July 2010
PART 1 - MEMBERS, PUBLIC & PRESS
NONSC
NONSC
NONSC
Control of lights
Energy
Pathways and access
compliance with Policies 4A.3 and 4A.16 of the London Plan 2008.
The lighting of the buildings shall employ devices that automatically turn the li ghts off
when the rooms are not in use.
REASON
In the interests of energy conservation, in accordance with Policy 4A.3 of the London
Plan.
Unless other wise agreed in writing by the Local Planning Authority, the plans and det ails
of proposed energy centre(s) and associated technology including biomass boilers,
Photovoltaic panels, CHP systems and the like for each phase of development, required
to be provided in accordance with Condition 3(xii), shall include a combined heat and
power plant (sized to the average combined space heating and domestic hot water
thermal demand of the development) and the areas of photovoltaic panels proposed, and
shall accord with the energy Statement prepared by Arup (04/09/2009) and
supplementary letters prepared by ARUP (208544/N.R. dated 27 November 2009 and
208544.AR. dated 25 March 2010) and where feasible, should demonstrate that the
infrastructure would be compatible with any potential future district heating network s, and
should safeguard the potential future connection to such a network. For each relevant
phase, the approved details shall be implemented prior to the occupation of buildings in
the relevant phase and thereafter permanently retained and maintained.
REASON
To ensure an appropriate proportion of the development's energy needs are from on-site
renewable energy sources in compliance with the requirements of Policy 4A.7 of the
London Plan 2008.
No part of the development shall be commenced until plans have been submitted to and
approved in writing by the Local Planning Authority showing in respect of all developm ent
within the application site the following:
i) Those areas within the site over which the public are to have an unimpeded
right of access and those areas over which the public are to have a discretionary acces s;
ii) The network of footpaths and pedestrian ways throughout the site s pecifying
those paths and ways over which the public are to have an unimpeded right of access
and those paths and ways over which the public are to have a discretionary access;
iii) The programme for the commencement and completion of landscaping f or the
public and canal side open space;
iv) The sequence of development within the site